• Title/Summary/Keyword: life cycle management

Search Result 1,502, Processing Time 0.028 seconds

Design Value Analysis and LCC Analysis Model of Water Supply System Project (수도시설의 설계VA 및 LCC 분석모델)

  • Lim Jong-Kwon;Jung Pyung-Ki;Seo Jong-Won;Lee Jae-Sun;Cho Kook-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.469-472
    • /
    • 2003
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a life cycle cost analysis model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

  • PDF

An Economic Feasibility Analysis on the Movable Modular Lodging Buildings (이동 가능한 숙박용 모듈러 건축의 경제성 비교 분석에 관한 연구)

  • Lee, Jeehee;Son, JeongWook;Jeong, WoonSeong;Yi, June-Seong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.12-20
    • /
    • 2015
  • Construction industry pays attention to modular construction recently which based on factory production not on labor intensive site production. Since modular construction has high time shortening effect and easiness of demolition and recycling, it has been applied to the temporary residential building. Domestic modular construction market are not activated yet, however, due to the high initial cost to realize modular construction. This study proposes demand-sensitized movable modular building in order to reduce the financial burden. The study compares between RC method building and Modular building which moves building when the demand falls off from Life-Cycle Cost's viewpoint. As a result of the economical evaluation, RC method achieved profits faster than Modular model, but Modular model's gross earnings during the life-cycle are much bigger than RC method. In other words, the result means that the market-sensitized movement of the modular building would be an economci choice in Life-Cycle Costing aspect.

Estimation of Carbon Emissions and Energy Self-Sufficiency in Sewage Treatment plant's Improvement by using Life Cycle Management Tool (LCM 기법을 이용한 하수처리장 개선에 따른 탄소배출량 및 에너지 자립율 평가)

  • Moon, Jin-Young;Park, Ji-Hyoung;Hwang, Yong-Woo;Park, Kwang-Ho
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.2
    • /
    • pp.223-232
    • /
    • 2013
  • In this study, carbon emissions and energy consumption were evaluated to establish a design strategy which has low energy consumption and carbon emission production, by using life cycle energy (LCE) and life cycle $CO_2(LCCO_2)$ calculation methods in life cycle management(LCM) tools. After improvement design projects, the energy consumption and $CO_2$ emission were calculated and compared in three sewage treatment plants (STPs), which are A STP, B STP, and C STP. The reduction of carbon emissions was 28,020.1 ton $CO_{2-}e/yr$, 37,399.6 ton $CO_{2-}e/yr$ and 8,788.3 ton $CO_{2-}e/yr$, respectively. Production of energy was 792 TOE/yr, 1,235 TOE/yr and 1,023 TOE/yr, respectively. As a result, the estimation of energy and energy self-sufficiency was 5.1 %, 14.5 % and 23.5 %, respectively. The result of this study shows the LCM can be contributed to establish strategy for energy and carbon emission reduction in sewage treatment plants.

A Study on the Design Value Analysis Model Using Probabilistic LCC Analysis of Water Supply System Project (확률적 LCC분석기법을 활용한 수도시설물의 설계VA모델에 관한 연구)

  • Jung Pyung-Ki;Seo Jong-Won;Lim Jong-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.181-193
    • /
    • 2004
  • A life cycle cost analysis model for public water supply systems should be different from the ones for other civil and architectural facilities as the operation and the maintenance cost of the water supply systems mainly come from the various mechanical systems and the pipeline systems of the collecting/treating/distributing facilities. This paper presents a cost classification scheme and a probabilistic life cycle cost analysis (PLCCA) model for public water supply systems. A value analysis (VA) procedure that is well suited for practical purposes is also presented. The presented probabilistic life cycle model and the value analysis procedure were applied to a real world project, and this case study is discussed in the paper. The model and the procedure presented in this study can greatly contribute to the value-oriented design alternative selection, the estimation of the maintenance cost, and the allocation of budget for water supply system construction projects.

A study on the Life Cycle Profiles(LCP) for RC Slab Bridge (철근콘크리트 슬래브교의 노후화 예측모델에 관한 연구)

  • Ahn, Young-Ki;Lee, Chae-Gue;Lee, Jin-Wan
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.3
    • /
    • pp.251-262
    • /
    • 2003
  • LCP(Life Cycle Profiles) of bridge structures are indispensable for the LCC(Life Cycle Cost) evaluations of bridge system. The bridge under considerations may be newly-designed one or one in service. Thus, a systematic study of LCP is essential for both reliable LCC evaluation and strategic bridge management. LCP is mainly influenced by the structural environment in nature. However, in Korea, LCC evaluation has been performed with the LCP of foreign research results or only with the pieces of professional engineers' opinion. Therefore, to alleviate the drawbacks of foreign LCP and to enhance the reliability of current LCP, LCP should be established using the available data in bridge management system(BMS). In this study, LCP along with a subset of the BMS data was investigated and several mathematical expressions were proposed and evaluated. The condition ratings of a bridge were trasformed into the numerical indices through fuzzy logics with real field data. From the numerical results, it is concluded that the mathematical LCP model of $y=\sqrt{y^2_0-at}$ is shown to be the fittest one (R=0.815) to express the condition rating varied with the age. This has been drawn from the case study of slab bridges under the similar conditions.

Status and Operational Activation of Life-Cycle Physical Activity Therapy Program - Focused on the Community Health Center Programs in Hoseo Region - (생애주기별 신체활동 치유 프로그램의 현황과 활성화 방안 연구 - 호서지역 보건소 프로그램 중심으로 -)

  • Lee, Wang-Lok;Park, Sang-Kyun;Kim, Dae-Hoon;Oh, Yoon-Ji;Kim, Young-Sam;Kim, Dae-Sik
    • Journal of Korean Society of Rural Planning
    • /
    • v.27 no.2
    • /
    • pp.35-42
    • /
    • 2021
  • This study was to analyze the Life-Cycle Physical Activity Therapy Programs (PATPs) in Hoseo Region and to suggest the Activation of the program. The subjects were the 81 PATPs performed in 36 of the Community Health Centers in the region. The basic data was collected by Official Documents, the Homepage of the Centers, Telephone Interview, and e-mail with the person in charge of the programs. All the data were classified to the administrative districts (Rural, Urban-Rural Intergration and Urban Region), the Life Cycles (Children, Youth, Adult and Old Adult) and the Health-related Fitness Variables (Strength/Muscle endurance, Flexibility and Aerobics). The ACSM's (American College Sports Medicine) Guidelines for Exercise Testing and Prescription were used to evaluate the PATPs. In the results, the number of the PATPs was too low compared to the population. Also, the PATPs were not considered to the Life-Cycle proportion of the population. The management of the PATPs was principally inadequate. The frequency and duration of the PATPs were deficient in order to improve the Health-related Fitness. In conclusion, the number of the PATPs should be increased proportionally compared to the population, operated and developed on the Specificity of the Life-Cycle Population in the administrative districts. Further, the PATPs should be managed on the scientific knowledge of physical activity therapy.

The Establishment and Improvement of Full Cycle History Management System for Low- and Intermediate-level Radioactive Waste (중저준위 방사성폐기물 전주기 이력관리체계 구축 및 개선)

  • Jin-Woo Lee;Jun Lee;Hee-Chul Eun;Ji-Young Jeong
    • Journal of Radiation Industry
    • /
    • v.18 no.1
    • /
    • pp.95-100
    • /
    • 2024
  • To establish a radioactive waste life cycle history management system, a series of processes including waste generation, classification, packaging, storage, transportation, and disposal were reflected in the information management system. A preliminary review process was introduced to reduce the amount of radioactive waste generated and manage it efficiently. Through this, the amount of radioactive waste generated must be checked from the beginning of the research, and the generated radioactive waste must be thoroughly managed from the stage of generation to final disposal. In particular, in the case of radioactive waste data generated during nuclear facility operation and each experiment, a radioactive waste information management system must be operated to receive information from the waste generator and integrate it with processing information at the management stage. The application process for small-package containers was reflected so that information such as the generation facility of radioactive waste, generation facility, project information, types of radioactive waste, major radionuclides, etc. In the radioactive waste management process, the preceding steps are to receive waste history from the waste generators. This includes an application for a specified container with a QR label, pre-inspection, and management request. Next, the succeeding steps consist of repackaging, treatment, characterization, and evaluating the suitability of disposal, for a process to transparently manage radioactive wastes.

A Requirements Management Process to improve the Requirements Management of Development Methodologies (개발방법론의 요구사항 관리를 개선하기 위한 요구사항 관리 프로세스)

  • Sin, Jong-Cheol;Gu, Yeon-Seol
    • The KIPS Transactions:PartD
    • /
    • v.9D no.1
    • /
    • pp.81-90
    • /
    • 2002
  • More than 50% of defects and errors in the software development projects are related to the requirements[14]. But the development methodologies can not provide enough supports to the requirements management and changes. In the real world, the requirements keep changing as the requirements at the early development phase are usually incomplete, the developer′s understanding of the problem will be constantly changed during the software process, and new requirements may emerge with the organizational and environmental changes. In this paper, a requirements management process that can be integrated into the development methodologies is proposed to extend the requirements management over the whole development life-cycle and to support the requirements changes at the design/implementation/test phases. To evaluate the proposed process, it was compared to the existing requirements managements processes and models, and examined through a integration test with a widely used development methodology "MaRMI" to show the expected improvements at each development phase.

Development of Pavement Management System for Highway Maintenance (국도유지관리를 위한 포장관리시스템 개발에 관한 연구)

  • Lee, Young-Wook;Do, Myung-Sik;Lee, Jong-Dal
    • International Journal of Highway Engineering
    • /
    • v.9 no.4
    • /
    • pp.159-169
    • /
    • 2007
  • In this paper, a PMS(Pavement Management System) is presented for the public agency who wish to execute rational repair by referring to asset management information regarding road pavement. The aim of the paper is to provide the decision makers with the planning information regarding maintenance strategies for efficient road pavement management. We found that life cycle cost can be minimized and repair cost in each year fluctuates when repeating repair at the IRI management level. The validity of PMS application presented in this paper is investigated through case studies for conducted for 22 national highway road sections in Korea.

  • PDF

Practical Issues of Earned Value Management Systems (EVMS) for Nuclear Power Plant (NPP) Construction

  • Jung, Youngsoo;Kim, Sungrae;Moon, Byeong-Suk
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.696-697
    • /
    • 2015
  • Cost, schedule, and quality are the three major performance indicators for any construction project. Under the globalized competition in the nuclear industry, researchers and practitioners have also explored a systemized and integrated management system for cost, schedule, and quality. In order to address this issue, the concept of earned value management system (EVMS) has been often utilized. However, implementing EVMS for a mega-project of nuclear power plant (NPP) construction requires extensive overhead efforts. Though previous studies proposed structures and methods for effective NPP EVMS, there has been no legitimate study for data collection strategy for practical implementation. In this context, the purpose of this paper is to develop an effective data collection strategy for NPP EVMS. Firstly, the barriers to practical NPP EVMS were identified based on literature review and expert interviews. Strategies for data collection were then developed based on different phases of project life cycle. This study focuses on the 'life-cycle integrated progress management system' for NPP construction from an owner's perspective Therefore, results of this study can be used as a guide for preparing request for proposals (RFP) of an NPP owner organization.

  • PDF