• Title/Summary/Keyword: life cycle management

Search Result 1,497, Processing Time 0.037 seconds

Development of Information System in Nursing Practice;spinal cord injury patients (간호실무를 위한 정보체계 개발;척수손상 환자를 중심으로)

  • Kang, In-Soon;Kim, Myung-Hee
    • Journal of Korean Academy of Nursing Administration
    • /
    • v.2 no.2
    • /
    • pp.43-57
    • /
    • 1996
  • The purpose of this research conducted has been an the development of a computer program to be used for nursing of spinal cord injury patients. The research is also intended to contribute by supplying the basic data, to the development of other programs in relevant areas where similar nursing information system is required. This research used System Development Life Cycle method. Results from the study were as follows : The scope of Information System in nursing practice were based on a wide range of mateials as charts at four hospitals in Pusan that cover the nursing period of spinal cord injury patients from admission to discharge and other sources of reference, the research is done for nursing diagnosis, nursing history, admission and discharge education, and the performing of doctor's order, which were divided into a subsystem that consisted of help, Patient Management, Performing of Docter's Order, and Basic Data Management and then these was analysed systematically using Hierachy Plus Input Process Output, necessary information, data flow diagram, and conceptual designs were developed for chosem system. Furthemore, the system has been programed by a conceptual design that includes the objects of the program and the origins of the sources. The oder to make sure of the proper function, the computer program was actually applied to a nursing practice that had been developed for a hypothetical situation through the two nurses who were in charge of spinal cord injury patients after they were trained to understand the structure and the contents of computer program about the nursing practice from using the computer program developed. Also, the compensatory strategy has been worked out against any problems to arise. It is expected that this kind of nursing practice information system to be used for the spinal cord injury patients that has been developed through the processes shown above will increase the satisfaction for both patients and nurses by enabling them to give more professional advice and service to the development of more information systems for many hospitals.

  • PDF

A Study on the License Management Model for Secure Contents Distribution in Ubiquitous Environment (유비쿼터스 환경의 안전한 콘텐츠 유통을 위한 라이센스 관리 모델 연구)

  • Jang, Ui-Jin;Lim, Hyung-Min;Shin, Yong-Tae
    • Journal of Korea Multimedia Society
    • /
    • v.12 no.4
    • /
    • pp.550-558
    • /
    • 2009
  • In ubiquitous environment, more small, lightweight, cheap and movable device is used than one device used in wired network environment. Multimedia service which is anytime, anywhere, is provided by device. However, it does not ensure the fair use of multimedia contents and causes damage to the contents providers because of illegal copy and distribution and indiscriminate use of digital contents. For solving this problems, DRM is applied to wired network but it has the problems does not protect stored license and manage license completely because of depending on simple protection such as device authentication and cryptographic algorithm. This paper proposes the license management model using digital forensic and DRM that prevents contents and licenses from distributing illegally and also enables the creation of evidence for legal countermeasure and the protection of license in whole life cycle.

  • PDF

A Computer Graphic Based Interactive Modeling System with Application to Ship Scheduling (선박운항 일정계획 문제에 대한 컴퓨터 그래픽 기반 상호대화식 모델링 시스템)

  • 이희용;김시화
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.4 no.5
    • /
    • pp.919-930
    • /
    • 2000
  • This paper treats a development of visual interactive modeling(VIM) system for ship scheduling problem in integer formulation. The ship scheduling problem can be described as "A problem which assigns ships and cargos to achieve maximum revenue from transportation" in brief. Since late 1970s there has been rapid growth in development and use of VIM as MS10R technology due to the development of computer technology and now VIM has become a important discipline in MS/OR and MIS society. Visual Interactive Modeling is a process that decision maker takes part in modeling life cycle -data collection, formulation, derivation of optimal solution and representation of solution - and interacts with a modeling system to achieve a user-solution appropriate for his/her ultimate goal. This paper suggests the methodology how to collect data, build and modify model, and represent solution using computer graphics as a major driving tool and demonstrates effective performance of a prototype system.pe system.

  • PDF

Rapid Management Mechanism Against Harmful Materials of Agri-Food Based on Big Data Analysis (빅 데이터 분석 기반 농 식품 위해인자 신속관리 방법)

  • Park, Hyeon;Kang, Sung-soo;Jeong, Hoon;Kim, Se-Han
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.40 no.6
    • /
    • pp.1166-1174
    • /
    • 2015
  • There were the attempts to prevent the spread of harmful materials of the agri-food through the record tracking of the products with the bar code, the partial information tracking of the agri-food storage and the delivery vehicle, or the control of the temperature by intuition. However, there were many problems in the attempts because of the insufficient information, the information distortion and the independent information network of each distribution company. As a result, it is difficult to prevent the spread over the life-cycle of the agri-food using the attempts. To solve the problems, we propose the mechanism mainly to do context awareness, predict, and track the harmful materials of agri-food using big data processing.

Development of Virtual Construction Equipment Simulation System Based on BIM for Civil Engineering Project (토목시설물에 대한 BIM 기반 가상건설 장비 시뮬레이션 시스템 개발)

  • Kim, Sung-Hoon;Yoon, Young-Cheol;Joo, Cheol-Beom;Yoon, Dong-Ju
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.3
    • /
    • pp.223-230
    • /
    • 2017
  • BIM(building information modeling) has been actively applied to construction industries and to maximize its application through the life cycle of structure, various relevant technologies have been proposed. In particular, 4D sequencing management and 5D cost-related management were introduced as an improved version of the design review and interface control by 3D information design. On the other hand, the virtual construction using virtual construction equipment can sophisticatedly handle capacity, dynamic movement, collision boundaries of actual construction machines but it still stays at a low level in a technical sense. In this study, simulation systems based on BIM involving virtual construction equipment have been developed; then it is applied to the actual construction project to evaluate the safety and efficiency of construction equipments. It was confirmed that the simulation systems can be utilized to construct virtual construction site by using an effective 3D library of construction equipment and can plays a key role to secure construction safety and economic feasibility. Specifically, the simulation system are very useful for decision making by construction managers to select the optimum equipment and construction method with a better understanding for safety and cost-saving.

Development of BIM Standard Database System for an Approximate Estimate of Old-Aged Apartment Remodeling Project (노후공동주택 리모델링의 개략견적을 위한 BIM 데이터베이스 구축)

  • Lee, Dong-Gun;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.53-64
    • /
    • 2010
  • Remodeling becomes the significant issue in the aspect of the resource recycling, because it does not demolishes the whole buildings, but a part of main structure. However, compared with new construction, remodeling has several problems of adding the repair and rehabilitation works, using the partial demolition method, and having difficulties of making decision due to disagreement between several owner organizations. BIM, which is the total solution for managing and producing information during whole life cycle of the buildings, seems to be the right solution for the way to address these issues. has a possibility for solving the problems. Therefore this paper provided the framework and database for applying the BIM in the remodeling, and proved the applicability of the BIM database in the remodeling project through the case studies.

A Study on Development of Maintenance Cost Estimation System for BTL Project of Education Facilities Using Optimization Methodology (최적화기법을 활용한 교육시설물 BTL 사업 운영관리비용 비용예측 시스템 개발 기초연구)

  • Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jea-On
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.45-57
    • /
    • 2009
  • BTL (Build-Transfer-Lease) Project for Education Facilities are contracted as a package which consists of several education facilities. The general maintenance period of BTL project for education facilities is 20 years. Thus, total cost variation largely depends on the accuracy of the maintenance cost forecasting in the early stage in the life cycle of the BTL Project. This research develops a cost forecasting system using complete linkage algorithm and branch & bound algorithm to help in finding optimal bundling combination. This system helps owner's decision-making to estimate the total project cost with various constraints changing. The result of this research suggests more reasonable and effective forecasting model for the maintenance facilities package in the BTL project.

A Study on Evaluation of Construction Project Owner's Organizational Competency (건설사업 발주자 조직 역량 평가에 관한 연구)

  • Lee, Si-Wook;Woo, Sung-Kwon;Kim, Ok-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.146-155
    • /
    • 2009
  • In the construction industry, success or failure depends on the capability and role of the project owner's organization, which has an effect on the peoples' lives and national finance because of a lot of involvement from the project owner. Therefore, it is required that the project owner has the sufficient capability for the success of relevant industry and the further development of whole industry. Therefore, at the viewpoint of successful accomplishment of the construction industry, systematic and in-depth research that defines and evaluates the capability of the project owner's organization is necessary. As-Is and To-Be competency can be measured by the individual areas and elements through the survey. By evaluating these capabilities simultaneously, it is possible to assume not only the project owner's organizational competency but also constant other capabilities. It is become to make plans for strengthening the capabilities and to establish the strategy, by catching which capabilities are really necessary. It will result in positive effects on improving the capabilities of the project owner's organizational competency.

Prioritizing SOC Facilities for Applying BIM/GIS Integrating Platform to Local Governments (지방자치단체에 BIM/GIS 통합 플랫폼 적용을 위한 SOC 시설물 우선순위 선정방안)

  • Youn, Jun Hee;Lee, Woo Sik;Choi, Hyun Sang;Kang, Tae Wook
    • Spatial Information Research
    • /
    • v.21 no.5
    • /
    • pp.7-14
    • /
    • 2013
  • Recently, BIM(Building Information Model) is widely applied to all stages of SOC (Social Overhead Capital)facilities life cycle from planning to maintenance. While BIM is an analysis tool focussing the inner space of facilities, GIS is principally applied to analyzing relationship between facilities. Therefore, integrating BIM and GIS, we expect to get a potential synergy effect in aspects of effective information management and various analysis for SOC facilities. This paper deals with prioritizing SOC facilities for applying BIM/GIS integrating platform to local governments. First, investigate facilities required by law, and identify SOC facilities suitable for SOC characteristics. Second, analyze the effectiveness and applicability of BIM/GIS integrating platform applying each facility. For the purpose, we quantify effectiveness and applicability in aspects of UIS management and GIS functions. Lastly, prioritize the SOC facilities applying BIM/GIS integrating platform.

The Study for Establishing the Criteria of Measurement Items in the Monitoring System for the Steel-Box Girder Bridge by FEM Analysis (구조해석에 의한 강상자형교 상시계측시스템 계측항목별 관리기준치 설정 연구)

  • Joo, Bong-Chul;Park, Ki-Tae;You, Young-Jun;Lee, Chin-Hyung;Hwang, Yoon-Koog
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.35-41
    • /
    • 2009
  • If any bridge has the monitoring system, the bridge manager can check the history of bridge behavior and the progress of the damage more exactly. When the unexpected event (ex: earthquake and flood) happens, the manager can check the safety condition of the bridge and make the pertinent action for bridge management which is reduction of vehicle speed or traffic control through the system. Additionary the manager can make the well-timed repair or reinforcement through the system, so he can save the management cost or the life cycle cost. This study presents the method of setting the criteria by FEM analysis in bridge monitoring system, and the standard progress for setting the criteria about measurement items of monitoring system for the steel box type bridge.

  • PDF