This study examines strategies and implementation plans for commercializing $CO_2$ capture and storage, which is an effective method to achieve the national goal of reducing greenhouse gas. In order to secure cost-efficient business model of $CO_2$ capture and storage, we propose four key strategies, including 1) urgent need to select a large-scale storage site and to estimate realistic storage capacity, 2) minimization of source-to-sink distance, 3) cost-effectiveness through technology innovation, and 4) policy implementation to secure public interest and to encourage private sector participation. Based on these strategies, the implementation plans must be designed for enabling $CO_2$ capture and storage to be commercialized until 2030. It is desirable to make those plans in which large-scale demonstration and subsequent commercial projects share a single storage site. In addition, the plans must be able to deliver step-wised targets and assessment processes to decide if the project will move to the next stage or not. The main target of stage 1 (2019 ~ 2021) is that the large-scale storage site will be selected and post-combustion capture technology will be upgraded and commercialized. The site selection, which is prerequisite to forward to the next stage, will be made through exploratory drilling and investigation for candidate sites. The commercial-scale applicability of the capture technology must be ensured at this stage. Stage 2 (2022 ~ 2025) aims design and construction of facility and infrastructure for successful large-scale demonstration (million tons of $CO_2$ per year), i.e., large-scale $CO_2$ capture, transportation, and storage. Based on the achievement of the demonstration project and the maturity of carbon market at the end of stage 2, it is necessary to decide whether to enter commercialization of $CO_2$ capture and storage. If the commercialization project is decided, it will be possible to capture and storage 4 million tons of $CO_2$ per year by the private sector in stage 3 (2026 ~ 2030). The existing facility, infrastructure, and capture plant will be upgraded and supplemented, which allows the commercialization project to be cost-effective.
Lee, Dae In;Kim, Gui Young;Tac, Dae Ho;Yi, Yong Min;Choi, Jin Hyu;Kim, Hye Jin;Lee, Ji Hye;Yoon, Sung Soon
Journal of the Korean Society for Marine Environment & Energy
/
v.18
no.3
/
pp.179-188
/
2015
This study reviewed the type of the project and developmental plan related to ocean energy development in the coastal land boundaries and the ocean, and suggested the efficient scoping method through the diagnosis of the key items of environmental impact assessment (EIA) in the coastal area. The major projects are the construction of tidal power plant, tidal current power plant, and offshore wind power plant in the public water, and also those are the construction of solar power plants in the coastal land boundaries. While the project plans on a large scale such as the construction of tidal power plant, it is important to consider both property of usefulness of the designated areas and harmony analysis with marine space availability based on the adequacy of the site selection and relevance of plan with the master plan for reclamation and strategic environmental assessment (SEA). And also it needs to be considered the careful checkup on the EIA checklist referring to the type of project, effective post-monitoring, and suggestion of mitigating methods to minimize the environmental impacts during the stage of actual environmental impact assessment. Introduction of a system of integrated marine environmental impact assessment should be considered for reasonable and effective manage to developmental projects on the marine spatial area.
Park, Jae-Hyeon;Woo, Bo-Myeong;Kwon, Tae-Ho;Lee, Heon-Ho
Journal of the Korean Society of Environmental Restoration Technology
/
v.4
no.1
/
pp.80-89
/
2001
The objective of this study was to introduce the current status and development strategy for the environmental restoration of stream side in Japan, and to consider the methodology which could be effectively applied to the environmental restoration of stream side in Korea. 1. We should establish a new paradigm of forest conservation and erosion control which can emphasize the restoration of the stream side ecosystem and reduce soil movement in the areas. Also, in the past, the objective of forest conservation and erosion control was to fix soil by constructing permanent structures. The direction of future forest conservation and erosion control needs to be new forest conservation and erosion control technology to prevent large scale soil movement but allow small scale soil movement to conserve sound ecosystem and biotic habitats. 2. In the past, the goal of forest conservation and erosion control planning was to fix the amount of soil movement by constructing permanent facilities. Forest conservation and erosion control planning in the future needs to change the techniques which could prevent soil movement from large scale of soil disasters, but allow soil movement effectively to a small and middle scale's soil movement. Also, it is considered to change erosion control dams from non passing type to passing type. 3. In the point of ecological conservation aspects, we should evaluate the effects of new forest conservation and erosion control methods which are emphasized on the restoration of the stream side ecosystem. Also, forest conservation and erosion control construction projects for restoring stream and river ecosystem should be planned for perfectly restorating their ecosystems by the way of sustainable maintenance and management. 4. The restoration direction of stream and river ecosystems needs to be restoring the diversity of small geographies such as waterway, shoal and puddles rather than flattening stream bed. And the restoration of the stream side ecosystem should provide continuity of the stream side environment which allows desirable biological habitats, and environmentally sound facilities to harmonize with the environment.
Korean Journal of Construction Engineering and Management
/
v.14
no.6
/
pp.61-69
/
2013
In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.
Journal of Korean Society of Industrial and Systems Engineering
/
v.41
no.3
/
pp.61-71
/
2018
The purpose of this study is to analyze the efficiencies of project management offices in large information system construction projects using the data envelopment analysis. In addition, we tried to estimate the confidence interval of those efficiencies using bootstrap DEA to give a statistical meaning. The efficiency by the CCR model is analyzed as eight project management offices are fully efficient and 22 project management offices are inefficient. On the other hand, there are 15 project management offices are fully efficient, but 15 project management offices are inefficient in the BCC model. As the result of the scale efficiencies, of the inefficient project management offices, 13 project management offices are inefficient in scale. It is possible to eliminate the inefficiency in the CCR model by improving their project performances. And, the nine project management offices showed that the inefficiency was due to pure technical efficiency, and these companies should look for various improvements such as improvement of project execution system and project management process. In order that the inefficient project management offices be efficient, it is analyzed that more efforts must be made for on-budget and on-time as a result of examining the potential improvement potentials of inefficient project management offices.
Although many logistics companies are interested in project logistics, the existing research has been limited to the growth potential of project logistics market and the high barrier and importance of project logistics. This study analyzes using DEA the operational efficiency of forwarding companies registered in major overseas construction EPC companies and performing logistics services for overseas plant construction projects. For efficiency analysis, Super-SBM analysis and Malmquist analysis are used among DEA analysis techniques. As a result of the Super-SBM analysis, DMU 5 ranked first at 1.807. DMU 5 is more efficient than the other large corporations because it has the stable supply of its parent company H and the smallest input and output variables among the large corporations. As a result of Malmquist analysis, TCI, which is a technological development, showed a fluctuation while TECI showed a relatively stable variation. In addition, there is a difference in scale between major companies and small and medium sized companies. So, it is necessary to identify the efficiency improvement strategy for each group and apply it to the practical work.
Consolidation settlements on soft clay are often greatly and potentially damaging to structures. Currently, large-scale projects are in planning or progressing in Korea. These structures will be constructed on both thick and soft clay layers, and so the accurate evaluation of magnitude of settlement is required at every step in design and construction. Especially, secondary compression may play an important role in consolidation settlements of soft clay. Generally, the magnitudes of secondary compression are evaluated by laboratory and in-situ consolidation tests. The empirical $C_a/C_c$ may be economical, fast and powerful tool in estimating secondary consolidation settlement. However, the databases of the $C_a/C_c$ at construction site in Korea are insufficient. The purpose of this study is to investigate the relationship of $C_a/C_c$ on marine clay near the southern sea in Korea. A series of incremental loading consolidation tests (measuring base pore water pressure) is peformed. It was found that the $C_a/C_c$ on undisturbed marine clay is 0.0397.
Proceedings of the Korea Concrete Institute Conference
/
2008.04a
/
pp.673-676
/
2008
Recent trends show an increased usage of 'colored concrete', a inorganic pigmented concrete mix, especially in small to large scale buildings. However, due to lack of regulations, current usage of colored concrete indicates a lack of consideration for safety factors and aesthetic aspects. Sometimes color pigmentation used in paints are inappropriately used in concrete, and in many cases the addition of coloring material is done without proper research into how structural characteristics of resulting concrete may have been affected. To resolve these issues, some construction sites apply ASTM or ACI regulations. However, such regulations incorporate elements that cannot be applied in Korea, which makes their domestic application impractical. In this paper, the primary aim is to determine to what extent the basic material characteristics of concrete is affected by the variety and quantity of different color pigments, and in so doing establish a foundation for future reference in case of construction projects involving the use of colored concrete.
Human activities greatly affect the environment causing its degradation. Urban development and road networks construction cause main impacts on ecosystems and particularly on vegetation cover: road constructions induce complete degradation of the vegetation cover and often leaves a hare land, sometimes without even a soil cover. Reconstitution of vegetation cover is necessary to limit superficial erosion and land slipping on the road, towards a reintegration of the site in the neighbouring landscape. Many approaches have been studied over the last 30 years aiming at this reconstitution of vegetation cover. At frost, the main purpose of land reclamation was to create a new ecosystem. At this time, the environment created was rather a "garden" with a new soil adapted to the plantation of "decorative" species. Then, in early 90′s many studies on the restoration ecology concept rather focused on adapting the vegetation to the existing conditions on the site, as in a side road embankment for example. Nowadays, we notice a large tendency towards the use of such adapted native species instead of industrially produced seeds. In southern France, our team have led research on the potentials of those local species for their use in revegetation processes with hydro-seeding. We therefore developed an approach combining the use of different types of species: Industrially produced, native and wild cultivated species. This method integrates the benefits of using available low costing seeds that are already used on large scale projects with better adapted species, issued form the cultivation of native species and seed production for their use on smaller scale and more costly but more effective results. The use of wild cultivated species seeds was developed in order to limit the cost and reduce harsh natural seed withdrawal in the natural environment In the case of the use of native species. Besides, the use of such seeds allowed a larger geographical scale of use than with local native seeds. In addition, our team began two years ago a research project in Lebanon aiming at the Introduction and development of the revegetation techniques in Lebanon. In fact, this country bared since 20 years the consequences of urban pressure on its environment especially by the development of quarries and road networks. Therefore, pioneer work is necessary to aim at the adaptation of these techniques to the local environment.
Journal of the Economic Geographical Society of Korea
/
v.23
no.1
/
pp.93-109
/
2020
The purpose of this study is to examine the effects of industrialization and urbanization of Gwangyang Bay Region on the change of urban system and spatial structure between triangle-cities located in Gwangyang Bay, Yeosu City, Suncheon City, and Gwangyang City, one of the famous industrial zones in Korea. Large-scale development projects carried out by the central government in the Gwangyang Bay Region such as construction of the Second Oil Refinery in the mid-1960s, completion of the POSCO Gwangyang Steelworks in the mid-1980s, construction of the Gwangyang Port Container Terminal in 1987 and designation of the Gwangyang Bay Area Free Economic Zone in 2003, and EXPO 2012 Yeosu Korea, affected to changes of the urban system and spatial structure between triangle-cities in Gwangyang Bay Region. The above four-development projects transformed the urban and spatial structures between the three cities in the Gwangyang Bay Region from a mononuclear urban system centered on Suncheon to a network city system. Historically, Suncheon has served as an exclusive center in the eastern region of Jeonnam, including the Gwangyang Bay Region. However, the hosting of the 2012 Yeosu Expo Korea is reorganizing the three cities into a network-type spatial structure with the strengthening of connectivity and integration in the region. And this trend is expected to intensify in the future.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.