Since the government of Korea (Ministry of Environment, MOE) introduced the policy applying 'Biotope-Area-Ratio-Indicator (BARI)' to huge residential land developments which Environmental Impact Assessment (EIA) should be performed, MOE has come to have the necessity to apply the indicator concretely at the stage of Prior Environment Review System (PERS) and EIA in various types of large scale land development projects. This study was conducted with the aim of supporting the application of BARI and related decision making in various other types of EIA projects as well as residential development projects through remodeling the system to apply the indicator of the past. Through the analysis of the problems in applying the past BARI and experimental appraisals to 11 types of EIA projects, the results and implications as follows were drawn. First, it's possible to extend the range of applications of BARI, which has been applied to only residential land development project, to all kinds of projects with area-typed land use pattern out of environmental impact assessment target projects. Second, it's also possible to set a target value into which regional characteristics and differences among locational properties are reflected. In addition, it's come to be able to differentially apply the target value of BARI according to the condition of the existing site. Third, it's improved to be able to suggest a macroscopic target value at the stage of PERS and to set detailed target values in each detailed land use at the stage of EIA. The key point underlies inducing methodology to determine target values to secure more permeable land coverage ratio for detailed land use patterns at the stage of EIA by making it possible to calculate BARI of the present land cover condition of the EIA target projects.
U-City건설 사업, 행정중심복합도시 건설 등 최근 도심 개발 사업이 대형화되고, 복합화되고 정보 인프라의 증가로 인하여 건설 산업이 정보화, 첨단화되면서 프로젝트의 기획단계의 중요성이 나날이 증가하고 있다. 최근 건설 분야에서 3D CAD 및 GIS 기술과의 융합 등 IT를 접목한 컨버전스를 통해 실제 건축물을 구축하기 전 건설 사업 단계별로 미리 시뮬레이션을 통해 의사결정을 지원할 수 있는 애플리케이션이 활발히 개발되고 있다. 하지만 프로젝트의 초기단계인 기획단계의 경우에는 업무의 특성상 전문가의 경험에 의존하는 경향이 있고, 행정적인 업무를 수반하기 때문에 IT기술을 활용한 어플리케이션을 적용하는 데 있어서 한계를 가지고 있다. 따라서 기획단계의 의사결정 지원을 위해 최근 이슈화되고 있는 3D CAD 데이터에 기획 단계에서의 설계요소 정보, GIS 기술을 연계하여 프로젝트 초기 단계인 기획단계의 업무 효율을 향상시킬 수 있는 방향을 제시하고자 한다.
KSII Transactions on Internet and Information Systems (TIIS)
/
제17권2호
/
pp.312-334
/
2023
In large-scale computing, cloud computing plays an important role by sharing globally-distributed resources. The evolution of cloud has taken place in the development of data centers and numerous servers across the globe. But the cloud information centers incur huge operational costs, consume high electricity and emit tons of dioxides. It is possible for the cloud suppliers to leverage their resources and decrease the consumption of energy through various methods such as dynamic consolidation of Virtual Machines (VMs), by keeping idle nodes in sleep mode and mistreatment of live migration. But the performance may get affected in case of harsh consolidation of VMs. So, it is a desired trait to have associate degree energy-performance exchange without compromising the quality of service while at the same time reducing the power consumption. This research article details a number of novel algorithms that dynamically consolidate the VMs in cloud information centers. The primary objective of the study is to leverage the computing resources to its best and reduce the energy consumption way behind the Service Level Agreement (SLA)drawbacks relevant to CPU load, RAM capacity and information measure. The proposed VM consolidation Algorithm (PVMCA) is contained of four algorithms: over loaded host detection algorithm, VM selection algorithm, VM placement algorithm, and under loading host detection algorithm. PVMCA is dynamic because it uses dynamic thresholds instead of static thresholds values, which makes it suggestion for real, unpredictable workloads common in cloud data centers. Also, the Algorithms are adaptive because it inevitably adjusts its behavior based on the studies of historical data of host resource utilization for any application with diverse workload patterns. Finally, the proposed algorithm is online because the algorithms are achieved run time and make an action in response to each request. The proposed algorithms' efficiency was validated through different simulations of extensive nature. The output analysis depicts the projected algorithms scaled back the energy consumption up to some considerable level besides ensuring proper SLA. On the basis of the project algorithms, the energy consumption got reduced by 22% while there was an improvement observed in SLA up to 80% compared to other benchmark algorithms.
Seo, Yoon Kyung;Rew, Dong Young;Kirchner, Georg;Nah, Jakyoung;Jang, Bi-Ho;Heo, Jiwoong;Youn, Cheong
Journal of Astronomy and Space Sciences
/
제31권3호
/
pp.265-276
/
2014
The application of software engineering is not common in the development of astronomical observation system. While there were component-wise developments in the past, large-scale comprehensive system developments are more common in these days. In this study, current methodologies of development are reviewed to select a proper one for the development of astronomical observation system and the result of the application is presented. As the subject of this study, a project of operation software development for an astronomical observation system which runs on the ground is selected. And the output management technique based on Component Based Development which is one of the relatively recent methodologies has been applied. Since the nature of the system requires lots of arithmetic algorithms and it has great impact on the overall performance of the entire system, a prototype model is developed to verify major functions and performance. Consequently, it was possible to verify the compliance with the product requirements through the requirement tracing table and also it was possible to keep to the schedule. Besides, it was suggested that a few improvements could be possible based on the experience of the application of conventional output management technique. This study is the first application of the software development methodology in the domestic astronomical observation system area. The process and results of this study would contribute to the investigation for a more appropriate methodology in the area of similar system development.
본 연구는 용인시의 채무제로화 정책과정을 Kingdon의 다중흐름모형을 통해 분석하여 지방정부의 재정역량 강화 및 경쟁력 제고에 기여하고자 하였다. 용인시는 2012년 기준 약 8,000억원의 지방채무를 가지고 있었으나 2017년 초 채무상환을 완료하였다는 점에서 분석대상으로 선정하였다. 분석 결과 첫째, 정책문제의 흐름은 용인시의 채무지표에 대한 인식, 경전철사업의 실패 및 역북지구의 택지분양 실패이다. 둘째, 정치의 흐름은 새로운 지방자치단체장의 당선과 공무원 예산 삭감 등의 행정부 협조, 주민들의 협조로 볼 수 있다. 셋째, 정책대안의 흐름은 대규모 투자사업 축소, 유휴공유 재산 매각을 통한 세입확대 및 세수증대, 경전철 활성화 정책이다. 이러한 정책문제의 흐름, 정치흐름, 정책대안의 흐름이 독립적으로 흐르다가 부동산경기 활성화와 역북지구 매각이라는 정책의 창이 열리면서 경전철 활성화 등의 기타 정책적 요소와 결합하였다. 이 과정에서 긴축재정을 위한 관계기관 협상과 설득 등의 정책선도가의 역할이 크게 작용하였다. 이러한 정책의 산출물로써 용인시는 채무제로를 달성하게 되었다. 본 연구를 통해 지방재정 역량 제고를 위해서 정책선도가의 역할의 중요성 뿐만 아니라 행정부와 시민의 협조, 대형 투자사업 추진 검토체계 등의 제도적 보완이 필요함을 밝혔다.
This study is aiming at identifying the foreward and backward lingkage effects of the farm land base development project. Korean Government has continuously carried out farmland base development projets including the integrated agricultural development projects. large and medium scale irrigation projects and the comprehensive development of the four big river basin including tidal land reclamation and estuary dam construction for the all weather farming since 1962. the starting year of the five year economic development plans. Consequently the irrigation rate of paddy fields in Korea reached to 75% in 1998 and to escalate the irrigation rate, the Government had procured heavy investment fund from IBRD. IMF and OECF etc. To cope with the agricultural problems like trade liberalization in accordance with WTO policy, the government has tried to solve such problems as new farmland base development policy, preservation of the farmland and expansion of farmland to meet self-sufficiency of foods in the future. Especially, farmland base development projects have been challanged to environmental and ecological problems in evaluating economic benefits and costs where the value of non-market goods have not been included in those. Up to data, in evaluating benefits and costs of the projects, farmland base development projects have been confined to direct incremental value of farm products and it's related costs. Therefore the projects'efficiency as a decision making criteria has shown the low level of economic efficiencies. In estimating economic efficiencies including Leontiefs input-output analysis of the projects could not be founded in Korea at present. Accordingly this study is aimed at achieving and identifying the following objectives. (1) To identify the problems related to the financial supports of the Government in implementing the proposed projects. (2) To estimated backward and foreward linkage effects of the proposed project from the view point of national economy as a whole. To achieve the objectives, Hwangrak benefited area with reservoir which is located in Seosan-haemi Disticts, Chungnam Province were selected as a case study. The main results of the study are summarized as follows : a. The present value of investment and O & M cost were amounted to 3,510million won and the present value of the value added in related industries was estimated at 5.913million won for the period of economic life of 70 years. b. The total discounted value of farm products in the concerned industries derived by the project was estimated at 10,495million won and the foreward and backward linkage effects of the project were amounted to 6,760 and 5,126million won respectively. c. The total number of employment opportunities derived from the related industries for the period of project life were 3,136 man/year. d. Farmland base development projects were showed that the backward linkage effects estimated by index of the sensitivity dispersion were larger than the forward linkage effect estimated by index of the power of dispersion. On the other hand, the forward linkage effect of rice production value during project life was larger than the backward linkage effect e. The rate of creation of new job opportunity by means of implementing civil engineering works were shown high in itself rather than any other fields. and the linkage effects of production of the project investment were mainly derived from the metal and non-metal fields. f. According to the industrial linkage effect analysis, farmland base development projects were identified economically feasible from the view point of national economy as a whole even though the economic efficiencies of the project was outstandingly decreased owing to delaying construction period and increasing project costs.
With the COVID-19 pandemic, the global economy has stagnated and our daily lives have changed. The rural economy is also experiencing damage, such as an average of 65% or more decrease in the number of visitors to rural experience resort villages due to the spread of COVID-19. In order to minimize the damage arising from the prolonged coronavirus, a hospitality system in response to changes in rural tourism behavior and consumer demand is needed to revitalize rural areas and maintain continuous economic independence. Therefore, this study attempted to find ways to utilize landscape resources such as education, culture, history, and ecology in order to complement the existing experience programs in connection with local resources and local environment. Wibong Village, which is the subject of the study, attempted to revitalize the village using the resources through the "Creative village creation" project in 2015. Due to poor management of historical resources, difficulty in operating experience programs, and response to changes in the natural environment, the rate of implementation of the project plan was very low. Currently, the demand for experience is also decreasing due to the COVID-19 effect, so it was judged that it was necessary to develop an experience village program suitable for the needs of experienced visitors by discovering additional local resources for the continuous operation of the experience village. In order to solve the problem of the use of landscape resources and the spatial composition of the study site, additional investigations of local resources were made, and an experience program course that could be operated by theme was proposed by configuring a space suitable for the use of landscape resources. By dividing the additionally investigated landscape resources into history, ecology, and region, an experiential course was created to separate the traffic lines, and the space composition for large-scale experienced visitors that had been previously operated was constructed in a form suitable for the post-corona era. In addition, at least two experiential tour courses that can be operated by period were proposed to maintain economic effects. Starting with this study, if further research on the creation and spatial composition of a rural experience village centered on the connection with the region, it will be used as research results that can be referenced in projects such as village creation, rural space planning, and living area analysis. It is expected that it will be able to effectively cope with the construction of a rural area suitable for the post-corona era, where demand is expected to increase in the future.
정부는 문화재수리공사의 품질확보 및 부실공사를 방지하기 위하여 문화재 감리제도를 2010년 1월에 도입하였다. 그러나, 문화재 감리와 관련된 감리대상공사, 감리자의 업무 범위, 감리대가, 감리원의 배치기준 등이 마련되어 있지 못해, 공공건설공사에서 운영하고 있는 감리제도를 운영하고 있다. 이로 인해 소규모 공사위주의 문화재수리 및 복원 특성을 반영한 문화재수리공사의 감리특성을 반영하고 있지 못한 실정이다. 따라서, 본 연구는 문화재수리공사의 특성에 맞는 평균 공사기간을 분석하여 감리업무와 대가기준 작성방향을 제안하였고, 문화재수리공사의 감리업무량을 조사 분석하여 감리대가기준을 마련하였다. 즉, 일정규모 이상의 문화재수리공사 경우, 감리원이 현장에 상주하여 감리업무를 수행하기 때문에 공공건설공사의 감리대가 산출방식과 같은 정액적산방식을 적용하여 감리대가 기준(안)을 제안하였다. 또한 일정규모 이하인 소규모 문화재수리공사의 경우, 감리원이 현장에 상주하지 않고, 주요 공종에만 현장에 방문하여 검사 및 확인하는 "건축법"의 수시 감리방식과 같은 비상주 감리대가 기준(안)을 제안하였다. 상기 문화재감리대가 기준(안)을 적용하여 분석한 결과, 문화재수리공사 상주감리의 감리비는 공공공사의 시공감리 대비 98% 수준이며, 비상주감리의 감리비는 건축공사감리 대비 158% 수준으로 도출되었다. 상기 연구결과인 문화재수리공사의 감리대가 기준(안)을 현장에 적용하게 되면, 문화재수리공사의 고품질 확보 등을 통하여 우리나라의 소중한 문화재를 보존할 수 있을 것으로 기대된다.
In recent years, there has been a significant increase in the number of large-scale projects involving construction, public works and the installation of industrial plants. These projects usually require the participation of a number of public and private entities and involve more than one contract. When disputes arising in connection with these projects are to be submitted to commercial arbitration, the parties often wish to have all disputes decided by one arbitral tribunal, in a single comprehensive proceeding. It has become apparent that the resolution of all major disputes which may arise in connection with such a project in a single comprehensive arbitration proceeding presents a number of advantages. The arbitral institution can provide for a multiparty arbitration proceeding only where all of the parties have agreed to it either at the time the disputes arise or at the time the parties enter into their various contractual arrangement. The discussion about multiparty arbitration centers on the question whether courts should have the power to order the consolidation of arbitration proceedings absent the consent of the parties. As the U.S. Supreme Court has repeatedly denied certiorari to cases presenting the consolidation-question, the conflict between the Court of Appeals' positions remains. The common method of selection in a bilaterial proceeding is the formula by which each party appoints one arbitrator and the two party-chosen arbitrators then mutually agree on a third, neutral arbitrator. This popular method poses, however, both a policy and practical problems In a 3-party-proceeding. It seems that the better solution is to have courts or arbitral institutions appoint all arbitrators for a multiparty proceeding. American courts have employed a variety of methods to appoint arbitrators for multiparty disputes in cases in which the parties had not provided for or could not agree upon a method themselves.
Mignot, Guillaume;Paranjape, Sidharth;Paladino, Domenico;Jaeckel, Bernd;Rydl, Adolf
Nuclear Engineering and Technology
/
제48권4호
/
pp.881-892
/
2016
Following the Fukushima accident and its extended station blackout, attention was brought to the importance of the spent fuel pools' (SFPs) behavior in case of a prolonged loss of the cooling system. Since then, many analytical works have been performed to estimate the timing of hypothetical fuel uncovery for various SFP types. Experimentally, however, little was done to investigate issues related to the formation of a flammable gas mixture, distribution, and stratification in the SFP building itself and to some extent assess the capability for the code to correctly predict it. This paper presents the main outcomes of the Experiments on Spent Fuel Pool (ESFP) project carried out under the auspices of Swissnuclear (Framework 2012-2013) in the PANDA facility at the Paul Scherrer Institut in Switzerland. It consists of an experimental investigation focused on hydrogen concentration build-up into a SFP building during a predefined scaled scenario for different venting positions. Tests follow a two-phase scenario. Initially steam is released to mimic the boiling of the pool followed by a helium/steam mixture release to simulate the deterioration of the oxidizing spent fuel. Results shows that while the SFP building would mainly be inerted by the presence of a high concentration of steam, the volume located below the level of the pool in adjacent rooms would maintain a high air content. The interface of the two-gas mixture presents the highest risk of flammability. Additionally, it was observed that the gas mixture could become stagnant leading locally to high hydrogen concentration while steam condenses. Overall, the experiments provide relevant information for the potentially hazardous gas distribution formed in the SFP building and hints on accident management and on eventual retrofitting measures to be implemented in the SFP building.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.