• Title/Summary/Keyword: large-scale IT project

Search Result 337, Processing Time 0.027 seconds

Common Speech Database Collection for Telecommunications (통신망환경 한국어 공통음성 DB 구축)

  • Kim Sanghun;Park Moonwhan;Kim Hyunsuk
    • Proceedings of the KSPS conference
    • /
    • 2003.05a
    • /
    • pp.23-26
    • /
    • 2003
  • This paper presents common speech database collection for telecommunication applications. During 3 year project, we will construct very large scale speech and text databases for speech recognition, speech synthesis, and speaker identification. The common speech database has been considered various communication environments, distribution of speakers' sex, distribution of speakers' age, and distribution of speakers' region. It consists of Korean continuous digit, isolated words, and sentences which reflects Korean phonetic coverage. In addition, it consists of various pronunciation style such as read speech, dialogue speech, and semi-spontaneous speech. Thanks to the common speech databases, the duplicated resources of Korean speech industries are prohibited. It encourages domestic speech industries and activate speech technology domestic market.

  • PDF

Material Planning Model for Multi-Project Management in Medium-sized Construction Companies (중견건설업체의 다중현장관리를 위한 자재조달계획 지원 모델)

  • Jung Sung-Lim;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.106-114
    • /
    • 2004
  • As the scale of construction work is enlarged, complicated and diversified, much construction information from the large number of construction sites is generated and reported to the head office. To control much information generated in construction sites simultaneously, the necessity of supporting system which could extract necessary information is increased. However, comparing with those of large companies, medium-sized companies's organization of head office and management system are weak. So it's difficult to manage multi-projects. Among these site managements, resource management is an important management area. But, resource planning is based on experience and judgement and has not associated with schedule information. So when schedule is changed, the plan must be amended manually. This study investigates material-planning model for multi-project management which is connected with daily report system and scheduling software.

A Research on the PMO Functions and PMO Management Level to Increase the IS Project Performance (정보시스템 프로젝트 성과 향상을 위한 PMO 기능과 관리수준에 관한 연구)

  • Lee, Jae-Beom;Jang, Yun-Hi;Kim, Sang-Yeol
    • Journal of Digital Convergence
    • /
    • v.9 no.2
    • /
    • pp.111-129
    • /
    • 2011
  • Nowadays, the IS project is getting more and more complicated and large-scaled. Many researchers and practitioners are interested in the IS development methodologies, automated tools and techniques to decrease project failure and to increase IS project performance. This research is to seize the management level of PMO affecting on the IS project, as a new method to increase the IS project development performance. As a result of surveying the present PMO operation state with banks which are the leading industry to accept the PMO in Korea, technology support management and infrastructure management are the core functions to affect the IS performance including schedule management, quality management, and user and stakeholders' satisfaction. Also, the PMO management level is the important point of IS project success. Among the 5 levels PMI suggested, PMO can implement the project effectively at least at the third level. Korean companies introducing the PMO have to do research the PMO core functions and the management levels according to the project scale, and review the distinctive features of their organization to increase the maturity of IS project. This research has been proved through the Full Structural Equation Model. The results show that the five core functions of PMO have relationship with the IS project performance.

An Analysis of Forwarding Companies' Efficiency handling Overseas Construction Project Logistics using DEA (DEA분석을 활용한 건설프로젝트 화물포워딩 업체의 효율성 분석)

  • Lee, Jun-Woo;Park, Sung-Hoon;Oh, Jae-Gyun;Yeo, Gi-Tae
    • Journal of Digital Convergence
    • /
    • v.16 no.6
    • /
    • pp.75-84
    • /
    • 2018
  • Although many logistics companies are interested in project logistics, the existing research has been limited to the growth potential of project logistics market and the high barrier and importance of project logistics. This study analyzes using DEA the operational efficiency of forwarding companies registered in major overseas construction EPC companies and performing logistics services for overseas plant construction projects. For efficiency analysis, Super-SBM analysis and Malmquist analysis are used among DEA analysis techniques. As a result of the Super-SBM analysis, DMU 5 ranked first at 1.807. DMU 5 is more efficient than the other large corporations because it has the stable supply of its parent company H and the smallest input and output variables among the large corporations. As a result of Malmquist analysis, TCI, which is a technological development, showed a fluctuation while TECI showed a relatively stable variation. In addition, there is a difference in scale between major companies and small and medium sized companies. So, it is necessary to identify the efficiency improvement strategy for each group and apply it to the practical work.

A Case Study on SK Telecom's Next Generation Marketing System Development (SK텔레콤의 차세대 마케팅 시스템 개발사례 연구)

  • Lee, Sang-Goo;Jang, Si-Young;Yang, Jung-Yeon
    • Journal of KIISE:Computing Practices and Letters
    • /
    • v.14 no.2
    • /
    • pp.158-170
    • /
    • 2008
  • In response to the changing demands of ever competitive market, SK Telecom has built a new marketing system that can support dynamic marketing campaigns and, at the same time, scale up to the large volumes of data and transactions for the next decade. The system which employs Unix-based client-server (using Web browser interfaces) architecture will replace the current mainframe-based COIS system. The project, named NGM (Next Generation Marketing ), is unprecedentedly large in scale. However, both managerial and technical problems led the project into a crisis. The application framework that depended on a software solution from a major global vendor could not support the dynamic functionalities required for the new system. In March 2005, SK telecom declared the suspension of the NGM project. The second phase of the project started in May 2005 following a comprehensive replanning. It was decided that no single existing solution could cope with the complexity of the new system and hence the new system would be custom-built. As such. a number of technical challenges emerged. In this paper, we report on the three key dimensions of technical challenges - middleware and application framework, database architecture and tuning, and system performance. The processes and approaches, adopted in building NGM system, may be viewed as "best practices" in the telecom industry. The completed NGM system, now called "U.key System," successfully came into operation on the ninth of October, 2006. This new infrastructure is expected to give birth to a series of innovative, fruitful, and customer-oriented applications in the near future.

A Case Study on Risk Factors and Risk Management in a Large-scale Project (대규모 프로젝트의 위험요인과 위험관리에 관한 사례연구)

  • Hong, Sa-Neung
    • The Journal of Information Systems
    • /
    • v.19 no.1
    • /
    • pp.97-116
    • /
    • 2010
  • Failures of super large projects like IT Upgrade of Shinhan Financial Group can be a heavy blow not only to the company but even to the national economy. Research on the practices of risk management in those projects will provide invaluable lessons, enhancing capabilities and chances of successfully executing mission critical projects of the companies and the national economy as a whole. This paper analyzes the risk management of the Core Systems Reconstruction which was the most critical component of IT Upgrade. The analysis covers risk management plans, and identification and evolution, and control and monitoring of risk factors. This study confirms the major results of previous research on risk management in Korea. However, the analysis found as well some discrepancies of practices from the previous research results. This research also tracked the trajectories of evolution of risk factors and management. In particular, in depth analysis of control and monitoring is the first research in Korea on the "management" of risks in IT projects. The result of this research is expected to be a useful guide for theory development and practices of risk management in the future.

An Exploratory Study on the Project Performance by PMO Capability (PMO 역량에 따른 프로젝트 성과에 관한 연구)

  • Bae, Jae-Kwon;Kim, Jin-Hwa;Kim, Sang-Yeoul
    • Asia pacific journal of information systems
    • /
    • v.18 no.1
    • /
    • pp.53-77
    • /
    • 2008
  • In recent years, although numbers of corporations are bringing in PMO, they seem to be indifferent to PMO performance measurement. This demonstrates that there are also other reasons beside performance measurement of information systems (IS) project being ambiguous by introducing PMO; the lack of acknowledging the concrete function of PMO, and the scarcity of empirical study about the effect of PMO on the project members and project performance. In this sense, this study is aimed at proposing a new research model in which project success factors (i.e., standardization, management advocacy, and staff expertise) affect PMO capability (i.e., knowledge management, resources management, and problem solving competency) positively, leading to project performance (i.e., task outcomes, psychological outcomes, and organizational outcomes) eventually. To empirically test the research model, data are surveyed from PMO department and IS department. To prove the validity of the proposed research model, PLS analysis is applied with valid 132 questionnaires. By employing PLS technique, the measurement reliability and validity of research variables are tested and the path analysis is conducted to do the hypothesis testing. The path analysis results can be organized into 7 ways in large scale. First, standardization of project success factors has a positive association with knowledge management, resources management, and problem solving competency of PMO capabilities. The findings of this result indicate that the multiple or single project management should satisfy standardization in order to operate an effective PMO. Second, management advocacy of project success factors has a positive association with knowledge management, resources management, and problem solving competency. Management advocacy refers to the willingness of management to provide the required resources and authority for project success. There is agreement among researchers regarding the importance of management advocacy for favorable PMO capability. Third, staff expertise of project success factors has a positive association with knowledge management, resources management, and problem solving competency. The findings of this result indicate that the formation of an exceptional consultant or members with a proficient knowledge for staff expertise of project member is the key factor to elevate the PMO capability. Past research suggests that experience and knowledge and the resultant familiarity with the problem faced can be an important determinant of PMO capability. A capable project with appropriate staff expertise means that it enjoys a diversity of abilities and experiences. Fourth, knowledge management competency of PMO capabilities has a positive impact on psychological outcomes but has no direct effect on task outcomes and organizational outcomes. In domestic case of S. Korea, PMO was finally introduced to many other corporations in 2005 though it started bringing in 2000. Therefore, it had neither a significant impact on the task outcomes nor organizational outcomes by lacking the contents and the infrastructure of the knowledge management because the knowledge consolidation and management period of PMO is comparatively shorter by terms than other foreign nations. Fifth, resources management competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. In addition, problem solving competency of PMO capabilities has a positive association with task outcomes, psychological outcomes, and organizational outcomes. Therefore, the findings of this results stress that PMO capabilities has a positive impact on project performance. Sixth, according to the path analysis of the hypothesis, which suggested in this research, problem solving competency is the PMO capability which is the key success factor for task, psychological, and organizational outcomes as an integrated performance model. Further, the analysis reveals that problem solving competency is an important factor for integrated performance model. The finding is in line with past IS research, which affirms that the work of IS projects is essentially a problem solving endeavor. Seventh, in the path analysis of the hypothesis in this research, the path of the management advocacy $\rightarrow$ problem solving competency $\rightarrow$ organizational outcomes appears to be the most important and strongest path. In brief, the finding of this study suggests that project success factors influence PMO capability positively, and project performance as well. From the results, it can be concluded that PMO helped great improve the project success rate and project performance. This study advances research on PMO capability in three important aspects. First, the findings of our study have implications for IS theory and future research. Our study contributes to IS theory by synthesizing concepts from PMO research and project management research with those in IS research. We proposed and tested PMO capability of IS projects and the findings of our investigation provided some preliminary answers to some of the questions raised. Secondly, this thesis does not only help depicting the concept of IT governance but also approaches empirically. It makes a gradual approach to the main content, step by step, in contrary of simple standard, scholastic way of thinking. Finally, we argued that this task-oriented(technical) view is not sufficient to adequately conceptualize IS project performance. Hence, we applied that the research on organization teams, which provides a flip viewpoint to that of project management research in that it gives more weight for psychological outcomes of organizational work groups, can be very helpful in reconceptualizing the IS project performance construct. The limitations of this study are also discussed to provide research directions for future research.

Probabilistic Project Duration Estimation by Combination of PERT and PLET in High-Risk Project (고위험 사업에서 PERT와 PLET기법 결합에 의한 확률적 사업공기 추정)

  • Kim, Seon-Gyoo;Kim, Junyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.3
    • /
    • pp.71-80
    • /
    • 2016
  • PERT(Project Evaluation and Review Technique) is typical method in order to probabilistically establish the schedule plan for large scale complex project or mega project. PERT technique is impossible to estimate relationship of each activity probabilistically when there are overlapping relationships because it is limited to Finish-to-Start(FS) relationship. In order to overcome this kind of limitation of PERT technique, PLET(Probabilistic Linkage Evaluation Technique) has been suggested to probabilistically estimate project duration for various overlapping relationships for each activity. However, estimating project duration by PLET technique only considers uncertainty of relationship between activities and not activity time, thus it is not the perfect duration estimating method. The main objective of this research is to propose the integration model of PERT and PLET and verify its probabilistic validity. By verifying application of time calculation method of integration model in practical case, this research will suggest probabilistic project duration estimating method in schedule plan of high-risk construction industry.

Evaluation of Organization and Use of Data Model for Structural Experiment Information (구조실험정보를 위한 데이터 모델의 구성 및 사용성 평가)

  • Lee, Chang-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.6
    • /
    • pp.579-588
    • /
    • 2015
  • The data model for structural experiment information formally organizes the information involved in the structural experiments before the data repository using the data model is implemented. The data model is particularly required for the data repositories for the large-scale structural experiment information and the general information for various types of experiments, such as the NEEShub Project Warehouse developed by NEES. This paper proposes criteria for evaluating the organization and the use of design model for structural experiment information. The term of AVE(attribute value existence) indicates the ratio of attributes who values exist in objects, and then used for defining the Attribute AVE for the use of an attribute, the Class AVE for a class, the Class Level AVE for a class including its lower-level classes, the Project AVE for a project including all classes at class levels, and the Data Model AVE for a data model including projects. These criteria are applied to the projects in the NEES data model, and it is successively possible to numerically describe the evaluation of the use of classes and attributes in the data model.

A Study on Design of Project Integrated Management Tool for Improving Communication Process (의사소통 개선을 위한 프로젝트 통합관리 도구의 설계에 관한 연구)

  • Moon, Sung-Gae;Kim, Ji-Hyeok;Rhew, Sung-Yul
    • Journal of the Korea Society of Computer and Information
    • /
    • v.14 no.7
    • /
    • pp.133-141
    • /
    • 2009
  • To have successful execution of a development project on large scale, it is the most important to improve communication problems between project stakeholder. In this study, we design and implement project integrated management tools that improve the problems. In order to design and implement the tools, we gathered and arranged requirements based on the ISP data from S corporation and the problems of 23 projects which was executed in recent 2 years in a communication perspective, and then we conceptually design and propose the tools. We defined major parts of the functions and the architecture related to communication among the proposed architecture model, and we proposed process and detail functions to execute major functions. This study shows the possibility through a qualitative valuation to improve validation of the architecture model and a quantitative analysis in a communication perspective.