• Title/Summary/Keyword: large dams

Search Result 171, Processing Time 0.028 seconds

Development of a Wireless Vibration Monitoring System for Structural Health Evaluation (구조안전성 평가를 위한 무선 진동 모니터링 시스템 개발)

  • Shim, Bo-Gun;Lee, Shi-Bok;Chae, Min-Sung
    • Transactions of the Korean Society for Noise and Vibration Engineering
    • /
    • v.20 no.2
    • /
    • pp.166-171
    • /
    • 2010
  • Wired monitoring systems have been used for damage detection and dynamic analysis of large structures(bridges, dams, plants, etc.). However, the real-world applications still remain limited, mainly due to time and cost issues inherent to wired systems. In recent years, an increasing number of researchers have adopted WSN(wireless sensor network) technologies to the field of SHM(structural health monitoring). Accurate time synchronization is most critical for the wireless approach to be feasible for SHM purpose, along with sufficient wireless bandwidth and highly precise measuring resolution. To satisfy technical criteria stated above, a wireless vibration monitoring system that uses high-precision MEMS(micro-electro-mechanical system) sensors and A/D convertor is discussed in detail. It was found experimentally that the level of time synchronization fell within $200\;{\mu}sec$.

A Mathematical Model for Coordinated Multiple Reservoir Operation (댐군의 연계운영을 위한 수학적 모형)

  • Kim, Seung-Gwon
    • Journal of Korea Water Resources Association
    • /
    • v.31 no.6
    • /
    • pp.779-793
    • /
    • 1998
  • In this study, for the purpose of water supply planning, we propose a sophisticated multi-period mixed integer programming model that can coordinate the behavior of multi-reservoir operation, minimizing unnecessary spill. It can simulate the system with operating rules which are self- generated by the optimization engine in the algorithm. It is an optimization model in structure, but it indeed simulates the coordinating behavior of multi-reservoir operation. It minimizes the water shortfalls in demand requirements, maintaining flood reserve volume, minimizing unnecessary spill, maximizing hydropower generation release, keeping water storage levels high for efficient hydroelectric turbine operation. This optimization model is a large scale mixed integer programming problem that consists of 3.920 integer variables and 68.658 by 132.384 node-arc incidence matrix for 28 years of data. In order to handle the enormous amount of data generated by a big mathematical model, the utilization of DBMS (data base management system)seems to be inevitable. It has been tested with the Han River multi-reservoir system in Korea, which consists of 2 large multipurpose dams and 3 hydroelectric dams. We demonstrated successfully that there is a good chance of saving substantial amount of water should it be put to use in real time with a good inflow forecasting system.

  • PDF

A Research on Applicability of Drone Photogrammetry for Dam Safety Inspection (드론 Photogrammetry 기반 댐 시설물 안전점검 적용성 연구)

  • DongSoon Park;Jin-Il Yu;Hojun You
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.5
    • /
    • pp.30-39
    • /
    • 2023
  • Large dams, which are critical infrastructures for disaster prevention, are exposed to various risks such as aging, floods, and earthquakes. Better dam safety inspection and diagnosis using digital transformation technologies are needed. Traditional visual inspection methods by human inspectors have several limitations, including many inaccessible areas, danger of working at heights, and know-how based subjective inspections. In this study, drone photogrammetry was performed on two large dams to evaluate the applicability of digital data-based dam safety inspection and propose a data management methodology for continuous use. High-quality 3D digital models with GSD (ground sampling distance) within 2.5 cm/pixel were generated by flat double grid missions and manual photography methods, despite reservoir water surface and electromagnetic interferences, and severe altitude differences ranging from 42 m to 99.9 m of dam heights. Geometry profiles of the as-built conditions were easily extracted from the generated 3D mesh models, orthomosaic images, and digital surface models. The effectiveness of monitoring dam deformation by photogrammetry was confirmed. Cracks and deterioration of dam concrete structures, such as spillways and intake towers, were detected and visualized efficiently using the digital 3D models. This can be used for safe inspection of inaccessible areas and avoiding risky tasks at heights. Furthermore, a methodology for mapping the inspection result onto the 3D digital model and structuring a relational database for managing deterioration information history was proposed. As a result of measuring the labor and time required for safety inspection at the SYG Dam spillway, the drone photogrammetry method was found to have a 48% productivity improvement effect compared to the conventional manpower visual inspection method. The drone photogrammetry-based dam safety inspection is considered very effective in improving work productivity and data reliability.

Comparison of Growth Performance of Antibiotic-free Yorkshire Crossbreds Sired by Berkshire, Large Black, and Tamworth Breeds Raised in Hoop Structures

  • Whitley, N.;Morrow, W.E.M.;See, M.T.;Oh, S.H.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.25 no.10
    • /
    • pp.1351-1356
    • /
    • 2012
  • The objective of this study was to compare body weight, ADG, and feed:gain ratio of antibiotic-free pigs from Yorkshire dams and sired by Yorkshire (YY), Berkshire (BY), Large Black (LBY) or Tamworth (TY) boars. All the crossbred pigs in each of three trials were raised as one group from weaning to finishing in the same deep-bedded hoop, providing a comfortable environment for the animals which allowed rooting and other natural behaviors. Birth, weaning and litter weights were measured and recorded. From approximately 50 kg to market weight (125 kg), feed intake and body weights were recorded manually (body weight) or using a FIRE (Feed Intake Recording Equipment, Osborne Industries Inc. Osborne, Kansas) system with eight individual feeding stations. Feed intake data for 106 finishing pigs between 140 and 210 d of age and the resulting weights and feed conversion ratios were analyzed by breed type. Least square means for body weights (birth, weaning and to 240 d) were estimated with Proc Mixed in SAS 9.2 for fixed effects such as crossbreed and days of age within the sire breed. The differences within fixed effects were compared using least significant differences with DIFF option. Individual birth weights and weaning weights were influenced by sire breed (p<0.05). For birth weight, BY pigs were the lightest, TY and YY pigs were the heaviest but similar to each other and LBY pigs were intermediate. For weaning weights, BY and LBY pigs were heavier than TY and YY pigs. However, litter birth and weaning weights were not influenced by sire breed, and average daily gain was also not significantly different among breed types. Tamworth sired pigs had lower overall body weight gain, and feed conversion was lower in TY and YY groups than BY and LBY groups (p<0.05), however, number of observations was somewhat limited for feed conversion and for Tamworth pigs. Overall, no convincing differences among breed types were noted for this study, but growth performance in the outdoor environment was satisfactory.

Analysis of Problems of Water Supply Capacity Determination in Water Resources Systems (수자원시스템의 용수공급량 결정방법의 문제점 분석)

  • Lee, Gwang-Man;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.4
    • /
    • pp.331-342
    • /
    • 2014
  • In water resources planning, to decide proper water supply capacity is a very important task. Once water supply system such as a dam is decided, it will affect whole range of water resources circumstances for a long time. Even though systematic approaches have been implemented since 1980, many problems are still prevail in reality. Especially some issues related to the reliability analysis method used in planning dams in Korea have been persistently brought up. This study is to diagnose problems on the reliability criterion in water supply capacity assessment of water resources systems and discuss a valid method. As a result, the estimates by the different analysis time intervals, in case of the temporal reliability, show no large difference, but there is a large difference when assessment time intervals are differently applied. The volumetric reliability accounts for 2~3% higher than that of the temporal reliability, and resiliency and vulnerability also show large differences by the analysis time intervals.

PHENOTYPIC SELECTION ON THE IMPROVEMENT OF GROWTH PERFORMANCE OF BLACK BENGAL KIDS

  • Husain, S.S.;Horst, Peter;Islam, A.B.M. Mafizul
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.9 no.2
    • /
    • pp.149-153
    • /
    • 1996
  • In the first step, birth weights and weights at 9 and 12 months were analysed and their variability were studied. Birth weight of kids had large within breed variation ranging from 0.50 to 1.60 kg. There were more than 100 kids with birth weights ranging from 1.2 to 1.6 kg. The birth weight of kids increased with the increase of kidding weight of dams. The weights of kids at 9 and 12 months also showed large within variation ranging from 5.0 to 18.0 kg and 16.0 to 19.0 kg respectively. In the second step, these existing large within breed variations were exploited selecting best animals for further mating. The birth weight of selected group($1.13{\pm}0.2kg$) was significantly(p<0.01) higher than the random group($0.93{\pm}0.05kg$). The weights in selected group for 3 and 6 months were $4.94{\pm}0.04$ and $8.40{\pm}0.05kg$ and that of random group was $3.99 {\pm}0.08$ and $7.07{\pm}0.11kg$ respectively and differences wee significant. Significantly higher average daily gains were noticed for selected group ($42.7{\pm}0.43g/day$) as against random group($33.3{\pm}0.81g/day$). From the results it may be concluded that selection and mating of best performing animals have some effect on the improvement of growth performance of kids which may be exploited for future planning and development in the field of goat production.

Regional Development And Dam Construction in Korea (한국의 지역개발과 댐건설)

  • 안경모
    • Water for future
    • /
    • v.9 no.1
    • /
    • pp.38-42
    • /
    • 1976
  • Because of differences in thoughts and ideology, our country, Korea has been deprived of national unity for some thirty years of time and tide. To achieve peaceful unification, the cultivation of national strength is of paramount importance. This national strength is also essential if Korea is to take rightful place in the international societies and to have the confidence of these societies. However, national strength can never be achieved in a short time. The fundamental elements in economic development that are directly conducive to the cultivation of national strength can be said to lie in -a stable political system, -exertion of powerful leadership, -cultivation of a spirit of diligence, self-help and cooperation, -modernization of human brain power, and -establishment of a scientific and well planned economic policy and strong enforcement of this policy. Our country, Korea, has attained brilliant economic development in the past 15 years under the strong leadership of president Park Chung Hee. However, there are still many problems to be solved. A few of them are: -housing and home problems, -increasing demand for employment, -increasing demand for staple food and -the need to improve international balance of payment. Solution of the above mentioned problems requires step by step scientific development of each sector and region of our contry. As a spearhead project in regional development, the Saemaul Campaign or new village movement can be cited. The campaign is now spreading throughout the country like a grass fire. However, such campaigns need considerable encouragement and support and the means for the desired development must be provided if the regional and sectoral development program is to sucdceed. The construction of large multipurpose dams in major river basin plays significant role in all aspects of national, regional and sectoral development. It ensures that the water resource, for which there is no substitute, is retained and utilized for irrigation of agricultural areas, production of power for industry, provision of water for domestic and industrial uses and control of river water. Water is the very essence of life and we must conserve and utilize what we have for the betterment of our peoples and their heir. The regional and social impact of construction of a large dam is enormous. It is intended to, and does, dras tically improve the "without-project" socio-economic conditions. A good example of this is the Soyanggang multipurpose dam. This project will significantly contribute to our national strength by utilizing the stored water for the benefit of human life and relief of flood and drought damages. Annual average precipitation in Korea is 1160mm, a comparatively abundant amount. The catchment areas of the Han River, Keum River, and Youngsan River are $62,755\textrm{km}^2$, accounting for 64% of the national total. Approximately 62% of the national population inhabits in this area, and 67% of the national gross product comes from the area. The annual population growth rate of the country is currently estimated at 1.7%, and every year the population growth in urban area increases at a rising rate. The population of Seoul, Pusan, and Taegu, the three major cities in Korea, is equal to one third of our national total. According to the census conducted on October 1, 1975, the population in the urban areas has increased by 384,000, whereas that in rural areas has decreased by 59,000,000 in the past five years. The composition of population between urban and rural areas varied from 41%~59% in 1959 to 48%~52% in 1975. To mitigate this treand towards concentration of population in urban areas, employment opportunities must be provided in regional and rural areas. However, heavy and chemical industries, which mitigate production and employment problems at the same time, must have abundant water and energy. Also increase in staple food production cannot be attained without water. At this point in time, when water demand is rapidly growing, it is essential for the country to provide as much a reservoir capacity as possible to capture the monsoon rainfall, which concentarated in the rainy seaon from June to Septesmber, and conserve the water for year round use. The floods, which at one time we called "the devil" have now become a source of immense benefit to Korea. Let me explain the topographic condition in Korea. In northern and eastern areas we have high mountains and rugged country. Our rivers originate in these mountains and flow in a general southerly or westerly direction throught ancient plains. These plains were formed by progressive deposition of sediments from the mountains and provide our country with large areas of fertile land, emminently suited to settlement and irrigated agricultural development. It is, therefore, quite natural that these areas should become the polar point for our regional development program. Hower, we are fortunate in that we have an additional area or areas, which can be used for agricultural production and settlement of our peoples, particularly those peoples who may be displaced by the formation of our reservoirs. I am speaking of the tidelands along the western and southern coasts. The other day the Ministry of Agriculture and Fishery informed the public of a tideland reclamation of which 400,000 hectares will be used for growing rice as part of our national food self-sufficiency programme. Now, again, we arrive at the need for water, as without it we cannot realize this ambitious programme. And again we need those dams to provide it. As I mentioned before, dams not only provide us with essential water for agriculture, domestic and industrial use, but provide us with electrical energy, as it is generally extremely economical to use the water being release for the former purposes to drive turbines and generators. At the present time we have 13 hydro-electric power plants with an installed capacity of 711,000 kilowatts equal to 16% of our national total. There are about 110 potential dams ites in the country, which could yield about 2,300,000 kilowatts of hydro-electric power. There are about 54 sites suitable for pumped storage which could produce a further 38,600,000 kilowatts of power. All available if we carefully develop our water resources. To summarize, water resource development is essential to the regional development program and the welfare of our people, it must proceed hand-in-hand with other aspects of regional development such as land impovement, high way extension, development of our forests, erosion control, and develop ment of heavy and chemical industries. Through the successful implementation of such an integrated regional development program, we can look forward to a period of national strength, and due recognition of our country by the worlds societies.

  • PDF

Recruitment and Succession of Riparian Vegetation in Alluvial River Regulated by Upstream Dams - Focused on the Nakdong River Downstream Andong and Imha Dams - (댐 하류 충적하천에서 식생이입 및 천이 - 낙동강 안동/임하 댐 하류하천을 중심으로 -)

  • Woo, Hyo-Seop;Park, Moon-Hyung;Cho, Kang-Hyun;Cho, Hyung-Jin;Chung, Sang-Joon
    • Journal of Korea Water Resources Association
    • /
    • v.43 no.5
    • /
    • pp.455-469
    • /
    • 2010
  • Changes of geomorphology in alluvial river and vegetation recruitment on its floodplain downstream from dams are investigated both qualitatively and quantitatively focusing on the downstream of Andong dam and Imha dam on the Nakdong River. Results of the analyses of river morphology and bed material in the study site show a general trend of riverbed degradation with a max scour of 3 m and bed material coarsening from pre-dam value of 1.5 mm in D50 to post-dam value of 2.5 mm. Decrease in bed shear stress due to the decrease in flood discharge have caused vegetation recruitment on the once-naked sandbars. As result, the ratio of area of vegetated bars over total area of bars has drastically changed from only 7% in 1971 before the Andong dam (constructed in 1976) to 25% after it, and increased to 43% only three year after the Imha dam (constructed in 1992) and eventually to 74% by 2005. Analysis of the vegetation succession at Wicjeol subreach, one of the three subreaches selected in this study for detailed investigation, has clearly shown a succession of vegetation on once-naked sand bars to a pioneering stage, reed and grass stage, willow shrub and eventually to willow tree stages. At the second subreach selected, two large point bars in front of Hahoe Village seem to have maintained their sand surfaces without a signifiant vegetation recruitment until 2005. The sand bars, however, seem to have been invaded by vegetation recently, which warns river managers to have a countermeasure to protect the sand bars from vegetation invasion in order to conserve them for the historical village of Hahoe. On the other hand, recruitment and establishment of vegetation on the sand bars by artificial disturbance of the river, such as damming, can create an unique habitat of backmarsh in the sandy river, as shown in the case of Gudam Wetland, and may increase the biodiversity as compared with relatively monotonous sand bars. Last, the premise in this study that decrease in flood discharge due to upstream dams and decrease in bed shear stress can induce vegetation recruitment on the naked sand bars in the river has been verified with the analyses of the distribution of dimensionless bed shear stress along the selected cross section in each subreach.

The Performance Analysis of a Counter-rotating Tubular Type Turbine with the Number of Runner Vane (러너베인 깃수의 변화에 따른 튜블러형 상반전 수차의 성능해석)

  • Park, Jihoon;Lee, Nakjoong;Hwang, Youngho;Kim, Youtaek;Lee, Youngho
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.192.1-192.1
    • /
    • 2010
  • Micro hydraulic turbines take a growing interest because of its small and simple structure as well as high possibility of applying to micro and small hydropower resources. The differential pressure exiting within the city water pipelines can be used efficiently to generate electricity like the energy generated through gravitational potential energy in dams. In order to reduce water pressure at the inlet of water cleaning centers, pressure reducing valves are used widely. Therefore, pressure energy is wasted. Instead of using the pressure reduction valve, a micro counter-rotating hydraulic turbine can be replaced to get energy caused by the large differential pressure found in the city water pipelines. In this paper, detail studies have been carried out to acquire basic design data of micro counter-rotating hydraulic turbine, output power, head, and efficiency characteristics on various number of runner vane. Moreover, the influences of pressure, tangential and axial velocity distributions on turbine performance are also investigated.

  • PDF

Temperature Crack Control about Sidewall of LNG in Inchon (인천 LNG지하탱크 Sidewall의 온도균열제어)

  • Koo, Bon-Chang;Kim, Dong-Seuk;Ha, Jae-Dam;Kim, Ki-Soo;Choi, Long;Choi, Woong
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1999.10a
    • /
    • pp.329-332
    • /
    • 1999
  • The crack of concrete induced by the heat of hydration is a serious problem, particularly in concrete structures such as underground box structure, mat-slab of nuclear reactor buildings, dams or large footings, foundations of high rise buildings, etc.. As a result of the temperature rise and restriction condition of foundation, the thermal stress which may induce the cracks can occur. Therefore the various techniques of the thermal stress control in massive concrete have been widely used. One of them is prediction of the thermal stress, besides low-heat cement which mitigates the temperature rise, pre-cooling which lowers the initial temperature of fresh concrete with ice flake, pipe cooling which cools the temperature of concrete with flowing water, design change which considers steel bar reinforcement, operation control and so on. The objective of this paper is largely two folded. Firstly we introduce the cracks control technique by employing low-heat cement mix and thermal stress analysis. Secondly it show the application condition of the cracks control technique like sidewall of LNG in Inchonl.

  • PDF