• Title/Summary/Keyword: lake kumho

Search Result 5, Processing Time 0.022 seconds

Coupled Operation of the Lake Youngsan, Yeongam and Kumho for the Flood Stage Control in the Downstream of the Youngsan River (영산강 하류부 홍수위 조절을 위한 영산호-영암호-금호호 연계운영)

  • Kim, Dae Geun;Kim, Dong Ok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.3B
    • /
    • pp.277-284
    • /
    • 2010
  • To examine how the width of connecting channels, the width of the Kumho lock gate, and the opening/shutting criteria of the Yeongam connecting channel lock gate affect the flood stage of Lake Yeongsan, Lake Yeongam, and Lake Kumho, located in the lower reaches of the Yeongsan River, unsteady flood routing was performed by connecting the three lakes into a single interlinked system. The coupled operation of the three lakes was found to have little effect when the widths of the lock gates and the Yeongam and Kumho connecting channels are set at the current level. The most effective way to lower the water level in Lake Yeongsan was to widen the Yeongam connecting channel, but this caused the water level in Lake Yeongam to rise. To lower the increased water level in Lake Yeongam by utilizing the water storage capacity of Lake Kumho, it was necessary to widen both the Kumho lock gate and the Kumho connecting channel. It was found that the optimum opening/shutting criterion for the Yeongam connecting channel lock gate is approximately EL.(+)0.8 m under the simulated conditions used in this study and the criterion allows of maximal lowering of the water levels in Lake Yeongam and Lake Kumho while maintaining a near-constant water level in Lake Yeongsan.

An Evaluation of Biotope to Develop Its Green Network -in the Case of Susong-Gu in Daegu Metropolitan Area- (비오톱 연계망 구축을 위한 서식공간 평가 -대구시 수성구를 중심으로-)

  • 나정화;사공정희;류연수
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.29 no.1
    • /
    • pp.67-79
    • /
    • 2001
  • The purpose of this research is to evaluate the biotope value in a metropolitan area after constructing the biotope evaluation model to develop biotope networking in the light of ecological landscape planning. In addition this study is to provide a basic frame of constructing the biotope networking system in the future with the evaluation results. The scope of this research is limited to high density residential area including some part of the forest adjacent to urban boundary. The results of the classified biotope in the research area have been turned out to be 24 patterns. According to the result of estimated nature value having the forth grade, three were forests combined with urban natural parks, schools near forests, and grasslands. There is a little place having first grade. We an deduce this fact that we have surveyed biotopes, having the minimum nature value and wider than children's park. As for the result of evaluated the structure, there were the forests of Seong-Dong, Meaho-Dong, and Kumho river, which is the forth grade. As for the evaluation of connection-function, the followings area were evaluated as the third grade-linear biotopes having highly valued and sustainable similarity - Seoul-Pusan Railroad, Dong-Daegu St., Kumho river, river basins. Bum대 park and a botanic park near Suesung lake, As for the evaluated the buffer-function, higly valued production biotopes, existing at a transition belt between he residential density areas, are Sawol-Dong, Meaho-Dong and Kumho river. When each of the indexes was evaluated, the core of the biotop contained most of natural biotopes. Large artificial biotopes were evaluated as an important biotopes, while small artificial biotopes were classified as a dot biotope. The future research on the concrete biotope networking construction, based upon performed evaluation in this research, should be conducted.

  • PDF

Evaluation of the Sediments Contamination in the Lake Sihwa (시화호 퇴적토의 오염도 평가 및 효과적 관리방안)

  • Kim, Seung-Jin;Bae, Woo-Keun;Shin, Kyung-Hoon;Choi, Dong-Ho;Baek, Seung-Chun;Yoon, Seung-Joon;Choi, Hyung-Joo
    • Journal of Soil and Groundwater Environment
    • /
    • v.12 no.4
    • /
    • pp.16-24
    • /
    • 2007
  • An investigation on the polluted sediments in the Lake Sihwa and the benthos that inhabited on the sediments was conducted. Cost effective remediation alternatives were derived form the results of the investigation. The sediment samples taken from four sampling points out of thirteen showed relatively high heavy metal (particularly copper) concentrations which exceeded the Effects Range Low (ERL) of the National Oceanic and Atmospheric Administration, USA. The four sampling points were located in front of industrial complexes. Although the heavy metals appeared to have affected the growth of the benthos, the concentration of it did not exceed the criteria of dredging that were developed by Netherlands or the State of Washington, USA. However, contamination by organic matters and sulfur compounds was severe, which exceeded the criteria of dredging that were established in Japan. The sediments taken from the four sampling points which were contaminated with heavy metals showed higher organic matter content in general. The organic matters in the sediments depleted oxygen in summer, which appeared to be fatal to the benthos. A comprehensive analysis on the sediments, benthos, and other environmental impact from the contaminated sediments drew a conclusion that the benthonic environment of the Lake Sihwa needed a stepwise remediation, giving a particular emphasis on the clean up of the sediments upstram of the Lake which could cause odor problems to the nearby residential area.

Water Flow Distribution and Sedimentation Characteristics of Particle Materials in the Sihwa Constructed Wetland (시화호 인공습지의 물흐름 분포 및 입자성물질 퇴적 특성)

  • Choi, Dong-Ho;Choi, Kwang-Soon;Kim, Sea-Won;Oh, Young-Taek;Kim, Dong-Sup;Joh, Seong-Ju;Park, Je-Chul
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.29 no.4
    • /
    • pp.425-437
    • /
    • 2007
  • Flow distribution of water and sedimentation rate were investigated to understand the hydrodynamics and settling characteristics of particulate materials in a constructed wetland for treatment of non-point sources pollutants, the Sihwa constructed wetland, Korea. The Sihwa constructed wetland is divided into three sub-wetlands(the Banwol, the Donghwa and the Samhwa wetlands) to treat the polluted water from three streams, the Banwol stream, the Donghwa stream and the Samhwa stream. From the results of water flow experiment using dye(Rhodamine 50WT Red), it was found that the water flow in the wetland was prevailing at the waterway and open water. Dye was spread slowly in the closed water area planted by plants. The mean hydraulic retention time(HRT) at the upper area of high wetland and lower wetland of Banwol, was found to be 34.1 hr at the upper area and 74.6 hr at the lower area respectively, totaling approximately 108.7 hr(4.5 days). The sedimentation rate was higher at lower area(sites of B, C and D) of the wetland than upper area(site of A which is settling zone). Based on the forecast for 20 years as to the amount of sediment that can be deposited in the open water in the future, the sediment depth of each area would be like this: A: 6.3 cm, B: 8.3 cm, C: 7.0 cm, D: 9.5 cm. The contents of organic materials in the sediment deposited within the sediment trap were found to be higher overly in the first investigation period which had much rainfall, and B, C and D areas were found to have an increased COD accumulation than A area. Also, nitrogen and phosphorus were found to increase in the down-stream of the wetland. The results of this study suggest that a sustainable research and management for the characteristics of water flow pattern and sedimentation changeable as time passes is needs to maintain or improve the efficiency of water treatment in the constructed wetland.

Temporal and Spacial Distributions of Water Quality and Evaluation of Pollutant Removal Efficiency in the Sihwa Constructed Wetland (시화호 인공습지에서 시공간적 수질분포 및 오염물질 제거효율 평가)

  • Choi, Don-Hyeok;Choi, Kwang-Soon;Kim, Dong-Sup;Kim, Sea-Won;Choi, Dong-Ho;Hwang, In-Seo;Lee, Yun-Kyoung;Kang, Ho
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.30 no.10
    • /
    • pp.1013-1020
    • /
    • 2008
  • To evaluate the pollutant removal efficiency and clarify the cause of low removal efficiency of the wetland, temporal and spacial distributions of water quality were investigated at 16 sites in the Sihwa constructed wetland. The removal efficiency showed a tendency to decrease since the construction of the wetland, except for TN. In addition, the efficiency was largely varied with season, especially BOD and TP. No removal efficiency of BOD was observed in April and July when algal bloom was occurred in lower part open water of the wetland. On the other hand, TP showed no removal efficiency from April to August showing -291% of removal efficiency in August. From the horizontal distribution in closed water regions, SS concentration for the central area was significantly higher than for left and right areas(p = 0.013, center > left > right areas). From the results of this study, we infer that anaerobic condition due to the excessive accumulation of organic matters and lack of uniformity of water flow distribution are major factors of the low removal efficiency of the wetland.