• 제목/요약/키워드: key management works

검색결과 132건 처리시간 0.031초

초고층 건축공사의 특수성을 고려한 최적 자재 재고 관리 방안에 관한 연구 -철근공사를 중심으로- (An optimal inventory management system for high-rise building -Focused on Re-bar Works-)

  • 김근환;이수환;윤정숙;박경모;김창덕
    • KIEAE Journal
    • /
    • 제13권1호
    • /
    • pp.151-157
    • /
    • 2013
  • Since high-rise building construction sites are usually located in crowded city areas, sufficient spaces for the inventories of key materials are rarely available. This spatial constraints have been one of the critical challenge that may cause productivity loss and increasing costs of the high-rise building construction projects. The proper material inventory management is certaing a key to the success of high-rise building construction projects as it handles difficulty of securing material stock yards, changes in demands, uncertain delivery time through integrating the construction schedules and actively responding to the key materials attributes. In this light, this research analyzes the latest inventory model, (Q,r) model, in accordance with the high rise building characteristics. This research suggests an optimal inventory management of re-bar considering various demands and lead times. The case study is also presented with regard to the re-bar inventory management.

A Study on Automatic Distribution System of the License Fees for the N-th Derivative Works

  • Yi, Yeong-Hun;Choi, Chang-Ha;Cho, Seong-Hwan
    • 한국컴퓨터정보학회논문지
    • /
    • 제21권3호
    • /
    • pp.33-38
    • /
    • 2016
  • Research on the development of key technologies of social work protection and content mashup tools has been carried out as an R&D project granted by the Korea Copyright Commission from 2013. The research aims to provide efficiency of the production environment of the secondary work of the digital contents as well as a systematic solution to the regulation-related problems. The essential features of the distribution management system for cooperative works developed though this study are the decision of the selling prices reflecting various license fee factors and the transparent distribution of the license fees. This paper represents a model which can automatically calculate the amount of the license fee in each derivative stage, independently of the license fee policies on each of the subsidiary contents when N-th works are producted on the basis of a previously approved first work.

무선 랜에서 빠른 재 인증을 이용한 간소화된 키 관리 기법 (A Lightweight Key Management for Wireless LANs with the Fast Re-authentication)

  • 이재형;김태형;한규필;김영학
    • 한국정보과학회논문지:정보통신
    • /
    • 제32권3호
    • /
    • pp.327-338
    • /
    • 2005
  • IEEE 802.11 무선 랜이 보안 측면에서 몇 가지 심각한 약점을 가진다는 것이 알려진 후 이러한 무선 랜 보안의 결함을 줄이기 위하여 많은 연구가 수행되어졌다. 그 중 IEEE 802,lli는 새 무선 랜제품과 함께 새로운 보안 플랫폼을 필요로 하는 궁극적인 장기 해결책이다. 그러나 이 방법은 큰 비용이 들기 때문에 비용이 중요한 작은 기관에게는 적합하지 않을 수 있다. 본 논문은 기존 제품을 조금 변경함으로써 그대로 사용 가능한 무선 랜을 위한 간소화된 키 관리 기법으로 FR-WEP을 제안한다. FR-WEP은 최근 제안된 간소화된 키 관리 기법인 WEP'(9)의 확장으로, 호스트 키와 사용자 키를 모두 사용하는 간소화된 상호 인증과 빠른 재 인증을 통해 인증된 사용자들에게 균일한 키 갱신을 제공함으로써 WEP'의 약점을 보완한다. FR-WEP은 특히, 더 나은 보안을 원하는 작은 기관들에게 무선 랜 보안을 위한 무거운표준안에 대해 좋은 대안이 될 것이다.

P.M.I. 기법을 이용한 국내 건설업체 리스크관리 실태 분석 (Trend Analysis for Risk Management of Construction Project using P.M.I. Techniques)

  • 정병화;정영식
    • 한국안전학회지
    • /
    • 제16권4호
    • /
    • pp.115-122
    • /
    • 2001
  • Recently construction enterprises involves more occurred with increase of size and complxity of construction works. Risk management is one of the key project management process. Numerous tools are available to support the various phases of the risk management process. We present the results of a study designed to identify the tools that are most widely used and those that are associated with successful project management in general, and in effective project risk management in particular. The study is based on a questionnaire administered to a sample of project managers from construction enterprises. The response data was analyzed in order to find which tools are mon likely to be used in the those organizations that report better project management performance and in those that value the contribution of risk management processes.

  • PDF

문서지문기법을 이용한 웹 문서의 자동 분류

  • 김진화
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2004년도 추계학술대회 및 정기총회
    • /
    • pp.407-429
    • /
    • 2004
  • As documents in webs are increasing explosively due to the rapid development of electronic documents, an efficient system classifying documents automatically is required. In this study, a new document classification method, which is called Document Finger Print Method, is suggested to classify web documents automatically and efficiently. The performance of the suggested method is evaluated alone with other existing methods such as key words based method, weighted key words based method, neural networks, and decision trees. An experiment is designed with 10 documents categories and 59 randomly selected words. The result shows that the suggested algorithm has a superior classifying performance compared to other methods. The most important advantage of this method is that the suggested method works well without the size limits of the number of words in documents.

  • PDF

화재안전기준(NFSC)에 따른 기계분야 소방설비 설계, 시공, 감리 유지관리 업무 표준화 방안에 대한 제안 (Proposals On The Designe, Construction, Management Maintenance standardization Method Of Mechanical Field Fire Protection System By NFSC)

  • 김성일;강경식
    • 대한안전경영과학회지
    • /
    • 제19권3호
    • /
    • pp.11-17
    • /
    • 2017
  • The study seeks to cooperate with the investigation of a fire investigation based on public-private partnership. Fire protection systems provide a wide variety of viewpoints from the perspectives of design, construction, management, maintenance, maintenance and maintenance systems at a particular point in time, construction, management, and maintenance systems. What is controversial is that there are illegal activities such as illegal activities of the Patent Office, misconduct of construction work and unreasonable construction of construction works.As a theoretical framework, the present study identified the four key elements of a successful disaster response system : responsiveness, control, professionalism, and bias.

균형성과표를 활용한 건설사업관리의 핵심성과지표 도출 (Extraction of the Key Performance Indicators of Construction Management Using Balanced Score Card)

  • 임우석;정지현;이학기
    • 한국건설관리학회논문집
    • /
    • 제16권6호
    • /
    • pp.22-30
    • /
    • 2015
  • 기업이 지속적으로 성장하기 위해서는 실현가능한 목표를 설정하고 그 목표를 달성하였는지 파악하여 끊임없이 목표를 관리하여야 한다. 나아가 개선해야 할 부분을 보완하여 목표를 재설정하고 그에 맞도록 성과를 관리하여야 한다. 최근 건설 분야에서도 조직, 프로젝트 및 기업의 성과에 대해서 많은 논의가 이루어지고 있다. 특히 건설사업관리는 건설공사의 사업수행 단계는 물론 시설물 생애주기에 걸쳐 효율적이고 전문적인 관리활동이 요구된다. 건설사업관리의 성과측정에 대해 국내의 많은 연구 대부분은 성과측정 모델의 기본적인 개념을 정립하는 수준에 머물러 있다. 또한, 건설현장 및 건설사업관리의 특성이 제대로 반영되지 못하여 성과관리시스템을 현장 실무에 적용하지 못하고 있는 실정이다. 따라서 본 연구에서는 균형성과표를 활용한 건설사업관리의 성과영역 및 핵심성과지표를 도출하여 객관적인 성과측정을 위한 기초자료를 제시하고자 한다.

Food Security and Nutrition Information and Knowledge Management in Case of Cambodia

  • Vong, Sokha
    • Agribusiness and Information Management
    • /
    • 제2권1호
    • /
    • pp.117-128
    • /
    • 2010
  • Coordination has been identified as a concern in the cross-cutting issues of food security and nutrition (FSN) in Cambodia. Food Security and Nutrition Information System (FSNIS) in Cambodia is the only "entry portal" to support policy formulation and decision-making with regard to FSN. While this knowledge and information management system has earned a respectful reputation, Council for Agricultural and Rural Development (CARD) faces many challenges in the implementation of the system. This paper will present how FSNIS has been developed and impacts on policy or strategy related to FSN. In addition, sustainability of the system is a key challenge for FSNIS; yet it is interesting to see how it works. Along with a success story, FSNIS is recognized by its stakeholders as the most successful knowledge and information management system in the field of FSN in Cambodia.

  • PDF

이동 임시무선망에서의 키 관리 기법에 관한 연구 (On the Study of Key Management in Mobile Ad Hoc Networks)

  • 김시관;신윤식;임은기
    • 한국산업정보학회논문지
    • /
    • 제9권4호
    • /
    • pp.90-98
    • /
    • 2004
  • 이동성을 가진 다수의 노드들에 의해 자율적으로 구성되는 이동 임시무선망(Mobile Ad Hoc Network)은 홈 네트워크, 센서 네트워크, 개인망 등 다양한 응용 분야로의 적용이 활발히 이루어지고 있다. 이동 임시무선망은 네트워크 토폴로지, 전송 대역폭 및 전송 거리상의 제약성, 에너지 사용에 있어서의 제약성, 무선망 고유의 보안성 취약 등의 여러 문제점을 극복하기 위하여 다양한 연구가 진행되고 있는데 특히 무선망이라는 속성 때문에 보안에 취약한 문제점을 안고 있다. 본 논문에서는 이동 임시 무선망에서 이동 노드들간에 보안성을 강화하기 위해 키들을 관리하는 기법을 제안한다. 임시 무선망에서 키를 분배하는 기법 중 완전 분배형 인증기법이 널리 적용되고 있다. 기존의 연구는 임의의 노드를 중심으로 한 개의 홉 거리에 있는 노드들에 대해서만 키 분배를 하는 기법을 채택하였지만 임의의 노드를 기준으로 주변에 특정 개수 이하의 노드가 활동 중인 경우에도 키 관리를 원활히 할 수 있는 기법을 제안하고 기존의 기법보다 우수함을 시뮬레이션을 통해 증명한다.

  • PDF

Risk Ranking for Tunnelling Construction Projects in Malaysia

  • Ghazali, F.E. Mohamed;Wong, H.C.
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권1호
    • /
    • pp.29-36
    • /
    • 2014
  • Tunnelling has become a preferred method of construction for road and highway projects in countries with a lot of hilly slope geological conditions such as found in Malaysia. However the construction works of a tunnelling project are usually complicated and costly, which consequently impose great risks to the parties involved. This paper identifies the key significant risks and sub-risks for tunnelling construction projects in Malaysia through a case study. Interview has been used as the solitary means to determine the significant risks from contractor's eleven key project personnel who were directly involved in the tunnelling construction such as consultant, construction manager and tunnel engineers. The importance of the risks identified is then prioritised and ranked via the Analytic Hierarchy Process (AHP)'s pairwise comparison approach to determine their criticality towards a successful delivery of project. As a result, three key risks have been identified as significant for the tunnelling case study project, namely health and safety, cost overrun in construction and time overrun in construction. Two sub-risks each of the latter categories, which are cost underestimation and unforeseen events (cost overrun in construction) as well as plant and machinery failure and delay in material delivery (time overrun in construction), have occupied the top five overall risk ranking.