Developing connection design rules in China

  • Shi, Yongjiu
    • Steel and Composite Structures
    • /
    • v.5 no.2_3
    • /
    • pp.141-158
    • /
    • 2005
  • The new version of Code for Design of Steel Structures (GB50017-2003) and other design standards in China were released over the last two years. Comparing with the previous version (GBJ17-88), many clauses covering the connection design have been revised. A number of additional provisions are supplemented to specify the design requirements for beam-column moment connections, as well as gusset plates for truss joints. In this paper, a summary on the design rules on connections specified in the current Chinese code is presented, and relevant commentary and background information is provided whenever appropriate. The design criteria governing weld and bolt resistance is examined and reviewed. Moreover, several issues such as detailing requirements for stiffeners and end-plate connections are discussed.

Design and Analysis on The Connections of RC Precast Large Panel (철근콘크리트 프리캐스트 대형판 접합부의 설계 및 해석)

  • Park, Kang-Geun
    • Journal of Korean Association for Spatial Structures
    • /
    • v.6 no.2 s.20
    • /
    • pp.85-92
    • /
    • 2006
  • Precast large panel structures have various connection system such as the horizontal slab-to-wall connection, the vertical wall to wall connection, horizontal slab-to-slab connection, etc. Horizontal connection is connected by vertical tie bars, and vertical joint is connected loop bars and shear keys. The basic function is equalized deformations on later forces and the entire wall panel assembly acts as monolithic actions. Under lateral load some slip occurs in almost vertical connections. The shape and detail of precast connections are very important to the monolithic behavior of overall structures. The paper is a study on the design method and new elasto-plastic analysis of the connections by rigid-bodies spring model.

  • PDF

Reinforcing Method for Steel Pile Head connection in RC footing (분할된 원호판을 이용한 강관두부보강법에 관한 연구)

  • Noh, Sam-Young;Kim, Kwang-Mo;Han, Seok-Hee;Min, In-Gi
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.476-485
    • /
    • 2006
  • The connection system of steel pile and RC footing is an important structure, because the total load of upper construction should be transferred through this joint construction of different two materials-steel and RC-with strongly changed section area. Although many connection systems have been developed, their structural and economical efficiency and workability are often insufficient. Therefore, a new connecting system was developed to improve the problems of current systems. The divided arc plate could improve the workability and economical efficiency, structural efficiency could be reached by welding construction. The main purpose of the research is to evaluate the structural behavior of the new designed connection system through experiments and numerical analysis.

  • PDF

An Experimental Study on Connection System of FRP Modular Box Member (FRP 모듈형 박스 부재의 연결 시스템에 관한 실험적 연구)

  • Kwak, Kae-Hwan;Jang, Hwa-Sup;Yang, Dong-Woon;Kim, Ho-Sun
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.51 no.4
    • /
    • pp.29-36
    • /
    • 2009
  • This is a basic experimental study to apply FRP modular box member to a variety of construction structures exposed to flexural strength, such as a slab and a girder. Applying FRP modular box member to a real structure requires a large section. FRP box member was made into modular systems. Tests were conducted under various conditions in order to analyze jointing performance of the developed FRP modular box member as a large section. For the methods of jointing FRP modular box member, synthetic resins connection, mechanical connection, and a combination of both were used to test both length and breadth connection. As a result of the test, using urethane + two bolts + sheets was the most efficient method of connecting FRP modular box member. It is expected that the proposed joint system in this study will contribute to the increase of failure load and synthesis behavior of FRP modular box member.

Evaluation on Structural Performance of Precast Bridge Deck Joint using HSFRC (고강도 강섬유보강콘크리트를 적용한 프리캐스트 바닥판 이음부의 구조성능 평가)

  • Lee, Han-Joo;Chung, Chul-Hun;Shin, Dong-Ho;Park, Se-Jin;Kim, In-Gyu
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.21 no.6
    • /
    • pp.196-205
    • /
    • 2017
  • In precast deck system, structural performance and serviceability are mostly determined by the connection methods between the precast decks. This study proposes precast deck system with asymmetric ribbed connection details using High Strength Fiber Reinforced Concrete(HSFRC) with filler. To verify the proposed method, the flexural performance experiment was carried out with variation of joint cross section type and splice rebar details. From the test results, regardless of joint details, spliced tensile rebars of specimens were deformed to yielding strain level. Also, all types of specimens resulted in sufficient flexural performance. These test results show that the minimum lap splice length specified in current Korea Highway Bridge Design Code is conservative for precast deck joint using HSFRC. Therefore, splice details can be simplified and joint width can be reduced by using HSFRC with filler between the precast decks, and the proposed precast deck systems can be applied to the connection part of precast decks effectively.

Structural Behavior of Beam-Column Joints Consisting of Composite Structures

  • Lee, Seung-Jo;Park, Jung-Min;Kim, Wha-Jung
    • KCI Concrete Journal
    • /
    • v.14 no.3
    • /
    • pp.111-120
    • /
    • 2002
  • This study proposes a joint model consisting of different types of members as a new structural system, and then investigates the resulting structural behavior. The joint model consists of a concrete-filled steel tube column (CFT) together with a steel reinforced concrete at the end plus reinforced concrete beam at the center. For comparison, two other joint models were designed, that are, a CPT with a reinforced concrete beam, and a CFT with a steel reinforced concrete at the end plus steel concrete beam at the center, then their joint capacity and rigidity, energy absorption capacity, etc., were all investigated. From the results, the CFT column with a steel reinforced concrete at the end plus steel concrete beam at the center was outstanding in terms of its capacity and rigidity. The results of this analysis demonstrate that an adequate connection type and reinforcement method with different materials of increasing the rigidity, thereby producing a capacity improvement along with protection from pre-fractures.

  • PDF

Seismic Experiment of Precast Concrete Exterior Beam-Column Joint Using Bolt Type Connection and Prestressing Method (볼트 접합 및 프리스트레스를 적용한 프리캐스트 콘크리트 보-기둥 외부접합부의 내진실험)

  • Lee, Dong-Joo;Lee, Ju-Dong;Oh, Tae-Soo;Kang, Thomas H.K.
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.2
    • /
    • pp.125-133
    • /
    • 2014
  • In this study, experimental research was carried out to investigate the seismic and structural performance of precast concrete exterior beam-column joints using bolt type connection and prestressing method. A total of five full-scale exterior beam-column joints were constructed and tested under reversed cyclic loading, controlled by displacement. Results of the test are as follows: Energy dissipation capacity and pinching phenomenon of PC beam-column joints showed disadvantageous behavior compared to RC beam-column joints. However, drift capacity of the PC joint was excellent. Also, yield mechanism concentrated on embedded nuts was suitable as an exterior beam-column joint of lateral load resistance frame. Additional application of prestressing method was also very effective to control excessive pinching and cracking in the joint region, and thus improved an overall seismic performance of the PC joint.

Central angle effect on connection behavior of steel box beam-to-circular column

  • Hwang, Won-Sup;Kim, Young-Pil;Yoon, Tae-Yang
    • Structural Engineering and Mechanics
    • /
    • v.32 no.4
    • /
    • pp.531-547
    • /
    • 2009
  • This paper presents the experimental results on the strength behavior and failure modes of box beam-to-circular column connections in steel piers. Previous research introduced parameters such as joint central angles, extension of horizontal stiffeners, and use of equivalent web depth, which ignored strength behavior and failure modes of box beam-to-circular column connections. The use of equivalent web depth $d_2$ is not reasonable when central angle ${\alpha}$ is closer to $90^{\circ}$; therefore, a monotonic loading test has been performed for eight connection specimens. From the test, it is identified that the connection with the circular column is stronger than the connection with the box-sectioned substitution column. Also, the strength of the beam-to-column connections with horizontal stiffeners is higher than the one of the no column stiffeners. The concrete-filled effect of box beam-to-circular column connection is also investigated, and the experimental yield strength of the connection is compared with the theoretical one. Also, more a reasonable equivalent web depth is suggested. The failure modes of connection are clearly defined.

Analysis Model for Approximate Evaluation of Stiffness for Semi-Rigid Connection of Wooden Structures (목조 구조물 접합부의 강성에 대한 근사평가를 위한 해석모델)

  • Cho, So-Hoon;Lee, Heon-Woo;Park, Moon-Jae;Kim, Taejin;Kim, Jong-Ho
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.28 no.1
    • /
    • pp.93-100
    • /
    • 2015
  • Modern wooden structures usually are connected with steel fastener type connectors. And joints using multiple connectors in wooden structures will form semi-rigid connection. If connection in wooden structure would be designed to be pinned joint, the underestimate for loads transmitted through connection, would result in the deficient capacity of resistance in connection. And if joints in wooden structures would be assumed to be fully-rigid joint, amount of fasteners needed at the connection could be excessively increased. It will give a bad effect in the view of beauty, constructability and economy. Estimate for the reasonable stiffness of connection might be essential in design of reasonable connection in wooden structure. This paper will suggest analysis modelling technique that can represent approximate stiffness of connections using a common analysis program for double shear connection in order to give help in performing easily the design of wooden structure. It is verified that the suggested approximate analysis modelling technique could represent the behavior in connection by comparing the analysis results with test results for tensile, bending moment.

THE ASSESSMENT OF ABUTMENT SCREW STABILITY BETWEEN THE EXTERNAL AND INTERNAL HEXAGONAL JOINT UNDER CYCLIC LOADING

  • Lee, Tae-Sik;Han, Jung-Suk;Yang, Jae-Ho;Lee, Jae-Bong;Kim, Sung-Hun
    • The Journal of Korean Academy of Prosthodontics
    • /
    • v.46 no.6
    • /
    • pp.561-568
    • /
    • 2008
  • STATEMENT OF PROBLEM: Currently, many implant systems are developed and divided into two types according to their joint connection: external or internal connection. Regardless of the connection type, screw loosening is the biggest problem in implant-supported restoration. PURPOSE: The purpose of this study is to assess the difference in stability of abutment screws between the external and internal hexagonal connection types under cyclic loading. MATERIAL AND METHODS: Each of the 15 samples of external implants and internal abutments were tightened to 30 N/cm with a digital torque gauge, and cemented with a hemispherical metal cap. Each unit was then mounted in a $30^{\circ}$ inclined jig. Then each group was divided into 2 sub-groups based on different periods of cyclic loading with the loading machine (30 N/ cm - 300 N/cm,14 Hz: first group $1{\times}10^6$, $5{\times}10^6$ cyclic loading; second group $3{\times}10^6$, $3{\times}10^6$ for a total cyclic loading of $6{\times}10^6$) The removal torque value of the screw before and after cyclic loading was checked. SPSS statistical software for Windows was used for statistical analysis. Group means were calculated and compared by ANOVA, independent t-test, and paired t-test with ${\alpha}$=0.05. RESULTS: In the external hexagonal connection, the difference between the removal torque value of the abutment screw before loading, the value after $1{\tims}10^6$ cyclic loading, and the value after $1{\times}10^6$, and additional $5{\times}10^6$ cyclic loading was not significant. The difference between the removal torque value after $3{\times}10^6$ cyclic loading and after $3{\times}10^6$, and additional $3{\times}10^6$ cyclic loading was not significant. In the internal hexagonal connection, the difference between the removal torque value before loading and the value after $1{\times}10^6$ cyclic loading was not significant, but the value after $1{\times}10^6$, and additional $5{\times}10^6$ cyclic loading was reduced and the difference was significant (P < .05). In addition, in the internal hexagonal connection, the difference between the removal torque value after $3{\times}10^6$ cyclic loading and the value after $3{\times}10^6$, and additional $3{\times}10^6$ cyclic loading was not significant. CONCLUSION: The external hexagonal connection was more stable than the internal hexagonal connection after $1{\times}10^6$, and additional $5{\times}10^6$ cyclic loading (t = 10.834, P < .001). There was no significant difference between the two systems after $3{\times}10^6$, and additional $3{\times}10^6$ cycles.