Reinforcing Method for Steel Pile Head connection in RC footing

분할된 원호판을 이용한 강관두부보강법에 관한 연구

  • Noh, Sam-Young (Dept. of Architectural Engineering, Univ. of Hanyang) ;
  • Kim, Kwang-Mo (Pile Tech Construction & Engineering Co., Ltd.) ;
  • Han, Seok-Hee (Managing Director CEO Technical Engineering DIV. CHUNGSUK ENGINEERING CO., LTD.) ;
  • Min, In-Gi (Dept. Structural Eng. Director DOHWA CONSULTING ENGINEERS CO., LTD.)
  • Published : 2006.03.24

Abstract

The connection system of steel pile and RC footing is an important structure, because the total load of upper construction should be transferred through this joint construction of different two materials-steel and RC-with strongly changed section area. Although many connection systems have been developed, their structural and economical efficiency and workability are often insufficient. Therefore, a new connecting system was developed to improve the problems of current systems. The divided arc plate could improve the workability and economical efficiency, structural efficiency could be reached by welding construction. The main purpose of the research is to evaluate the structural behavior of the new designed connection system through experiments and numerical analysis.

Keywords