• Title/Summary/Keyword: investment cost

Search Result 1,364, Processing Time 0.03 seconds

Investment Analysis of Venture Business for Probabilistic Cases (벤처사업의 투자결정기법: 확률적 사례를 중심으로)

  • 백관호
    • Journal of Technology Innovation
    • /
    • v.6 no.2
    • /
    • pp.178-207
    • /
    • 1998
  • This article suggests a methodology to decide the priority of investment project for venture business under the dynamic circumstance. By the Monte Carlo procedure on the probability distribution of cost and revenue, the model simulates the investment project to estimate profit ratio and risk. The profit ratio is calculated on the yearly basis for the relative comparison. The project risk is calculated as semi-variance under the target yield. After sufficient simulations in this fashion for several projects, the efficient projects with more profit and less risk are selected by the dominance principle. Then the regression equation of the selected projects is produced to find the relative value of the projects. The relative value is obtained through dividing the raw profit ratio by the estimated one on the equation. This value shows the degree to which the simulated project yields over the equation. The priority of investment is decided by this value. An examplary venture business of chemical development for semi-conductor is presented as a case study.

  • PDF

Investigation of Interface Reaction between TiAl Alloys and Mold Materials

  • 김명균;김영직
    • Transactions of Materials Processing
    • /
    • v.8 no.3
    • /
    • pp.289-289
    • /
    • 1999
  • This paper describes the investment casting of TiAl alloys. The effects of mold material and mold preheating temperature for the investment casting of TiAl on metal-mold interfacial reaction were investigated by means of optical micrography, hardness profiles and an electron probe microanalyzer. The mold materials examined were colloidal silica bonded ZrO₂, ZrSiO₄, A1₂O₃and CaO stabilized ZrO₂. When compared with conventional titanium a1loy, the high aluminum concentration of TiAl alloys helps to lower their reactivity in the molten state. The A1₂O₃mold is a promising mold material for the investment casting of TiAl in terms of the thermal stability, formability and cost. Special attention need to be paid to thermal stability and mold preheating when developing the investment calling of TiAl alloys.

정보시스템 도입 규모추정을 위한 용량산정 방식에 관한 연구

  • Na, Jong-Hoe;Chon, Gwang-Don;Jeong, Hae-Yong
    • Proceedings of the Korea Association of Information Systems Conference
    • /
    • 2005.12a
    • /
    • pp.307-313
    • /
    • 2005
  • According to the Policy for ' e-Korea construction ' of Korean government, investment of information system during the Past decay are dramatically increasing. More than a half of this investment is cost of hardware infrastructure. So, accurate hardware sizing are essential for higher efficiency of investment. Accurate hardware sizing benefits are generally viewed in toms of the avoidance of excess equipment and lost opportunity costs by not being able to support business needs. Unfortunately, however, little research effort to make the hardware sizing methodology are doing. We propose a sizing method for information system in public sector. This method is determinated empirical study that are gathering and analyzing cases, making method and reviewing expert. Finally we are proposed calculating method for hardware components that is CPU, memory, internal and external disk according to the application system type which is OLTP, Web, WAS. Our study certainly will act as a catalyst for higher investment-efficiency of the future information programs in public sector.

  • PDF

The Effects of Organizational Factors and GSCM Practices on BSC Performance (GSCM의 조직적 요인과 실행요인이 BSC 성과에 미치는 영향연구)

  • Noh, Mi Jin;Jang, Sung Hee
    • The Journal of Information Systems
    • /
    • v.24 no.1
    • /
    • pp.169-191
    • /
    • 2015
  • Green supply chain management(GSCM) has emerged as an organizational system which helps organizations and their parter to achieve corporate profit by reducing environmental risk and cost. The main objective of this study is to investigate the relationship among organizational factors(manager support and organizational learning), GSCM practices(investment recovery and eco-design) and GSCM performance based on the BSC. Using a sample of 125 Korean companies, path analysis is used to test the research model. The results shows that the manager support has a positive effect on the investment recovery and eco-design. The results also suggest that the organizational learning directly affect the investment recovery, but do not affect the eco-design. The investment recovery and eco-design have effect on the GSCM performance. In addition, the competitive pressure has moderating effects on most of the relationships between the organizational factors and GSCM practices. This findings provides useful insights for managers seeking to adopt GSCM practices, and also provide useful guidelines for researchers to study GSCM performance.

The Study on Hardware Sizing Method Based on the Calculating (계산에 기초한 하드웨어 도입 규모산정 방식 연구)

  • Ra, Jong-Hei;Choi, Kwang-Don;Jung, Hae-Yong
    • Journal of Information Technology Services
    • /
    • v.5 no.1
    • /
    • pp.47-59
    • /
    • 2006
  • According to the policy for "e-Korea construction" of Korean government, Investment of information system during the past decade are dramatically increasing. More than a half of this investment is cost of hardware infrastructure. So, accurate hardware sizing are essential for higher efficiency of investment. Accurate hardware sizing benefits are generally viewed in terms of the avoidance of excess equipment and lost opportunity costs by not being able to support business needs. Unfortunately, however, little research effort to make the hardware sizing methodology are doing. We propose a sizing method for information system in public sector. This method is determinate empirical study that are gathering and analyzing cases, making method and reviewing expert. Finally we are proposed calculating method for hardware components that is CPU, memory, internal and external disk according to the application system type which is OLTP, Web, WAS. Our study certainly will act as a catalyst for higher investment-efficiency of the future information programs in public sector.

A Study on the Government's Investment Priorities for Building a Supercomputer Joint Utilization System

  • Hyungwook Shim;Jaegyoon Hahm
    • Asian Journal of Innovation and Policy
    • /
    • v.12 no.2
    • /
    • pp.200-215
    • /
    • 2023
  • The purpose of this paper is to analyze the Korean government's investment priorities for the establishment of a supercomputer joint utilization system using AHP. The AHP model was designed as a two-layered structure consisting of two areas of specialized infrastructure, a one-stop joint utilization system service, and four evaluation items for detailed tasks. For the weight of each evaluation item, a cost efficiency index considering the annual budget was developed for the first time and applied to the weight calculation process. AHP analysis conducted a survey targeting supercomputer experts and derived priorities with 22 data that had completed reliability verification. As a result of the analysis, the government's investment priority was high in the order of dividing infrastructure for each Specialized Center and building resources in stages. In the future, the analysis results will be used to select economic promotion plans and prepare strategies for the establishment of the government's supercomputer joint utilization system.

Real Option Analysis for Medium-scale CHP Plant Investment with Volatile Electricity Prices (실물옵션을 이용한 소형열병합발전의 경제성 평가 : 전력가격 변동성을 고려하여)

  • Park, Hojeong;Jang, Chulho
    • Environmental and Resource Economics Review
    • /
    • v.16 no.4
    • /
    • pp.763-779
    • /
    • 2007
  • The combined heat-and-power (CHP) plant is recently suggested as an effective resolution in response to recent rising oil prices and the Kyoto Protocol. This research provides a model for economic appraisal to evaluate CHP investment. Real option model is developed to incorporate a case where the investment is irreversible and underlying revenue is stochastic. The analysis shows that power plant capacity more than 40 Gcal makes CHP investment profitable while the results may vary 10 modest level with respect to investment cost, heat sales price and discount rate.

  • PDF

Measuring the Efficiency of Investment in the Deployment and Technology Development of Renewable Energy in Korea Using the DEA (DEA를 이용한 국내 신재생에너지 보급 및 기술개발 투자의 효율성 분석)

  • Kim, Hong-Hee;Lee, Deok-Joo;Kim, Kyung-Taek;Park, Sung-Joon
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.40 no.4
    • /
    • pp.358-365
    • /
    • 2014
  • The purpose of this paper is to analyze the efficiency of government investment in the deployment and technological development of three technological areas - wind power, photovoltaic and fuel cell - of renewable energy in Korea using the DEA (data envelopment analysis). The efficiencies of government investment in renewable energies are measured and compared among three kinds of technologies using the actual data during 2007~2009. In the present DEA model, R&D investment and government subsidies for renewable energy usage promotion are selected as input variables, and the number of patents, supply level, and the production cost as output variable. As a result, it is found that the wind power is the most efficient renewable energy in Korea in the perspective of the efficiency of government investment.

Information Security Investment Model and Level in Incomplete Information (불완전 정보 하의 정보보호 투자 모델 및 투자 수준)

  • Lee, Yong-pil
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.27 no.4
    • /
    • pp.855-861
    • /
    • 2017
  • Gordon & Loeb[1] suggested that the optimal level of investment decision of an enterprise is the point that the marginal benefit(MB) of information security investment is equal to the marginal cost(MC). However, many companies suffering from information security incidents are not aware of the fact that they are experiencing information security accidents and can not measure how much they are affected. In this paper, I propose a model of information security investment decision making under the incomplete information situation by modifying the Gordon & Loeb[1] model and compare the differences in investment level. Under the incomplete information situation the expected return from the information security investment tends to be lower than that of actual information security investment, and the level of investment is also less. This shows that if a third party such as the government gives accurate information such as the rate of incidents of information security accidents and the amount of damages, companies can expand their investment in information security.

The Study for an Improved Methodology of Rail Investment Rating System (철도투자평가체계 개선방안의 고찰)

  • Roh, Byoung-Kuk;Kim, Young-Bea;Jin, Hak-Ki
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2192-2204
    • /
    • 2011
  • Recently, The government is actively transit road-oriented Traffic System to the eco-friendly and high-efficiency railroad-oriented transportation system for the sustainable green growth. The second plan of Nationwide Railway Network which has been officially announced rearrange to integration, multi-core, open architecture country by the railway network and integrate to the one mega city that rink an important city in one hour 30 minute. But the railroad industry is disadvantageous when it compares with the road industry on the ground that railroad industry peculiarities(a cost-benefit analysis, an environment value, etc) have not reflected in the (preliminary) feasibility study for SOC industry. The government establish Improved methodology of Rail Investment Rating System and improved preliminary feasibility study in railroad project by introduction many content(analysis periods, rate of discount, the benefits of shortening of transit hours, the estimation of traffic accident reduction benefits, investment cost of vehicle substitution and operation and maintenance cost of high speed rail) about the Improved methodology of Rail Investment Rating System. This study is intended to consideration the key content that was included in the Improved methodology of Rail Investment Rating System. In addition, the points to be considered for additional study have been reviewed in this study. We hope we will carry out make a reasonable and objective Rail Investment Rating System and to perform the railway industry of the virtuous cycle such improvement plans are reflected at a hereafter railroad section.

  • PDF