• Title/Summary/Keyword: international development project

Search Result 1,014, Processing Time 0.03 seconds

A MONITORING METHOD OF PROJECT PROGRESS WITH RFID TECHNOLOGY

  • Soungho Chae ; Naruo Kano
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.491-496
    • /
    • 2005
  • In this paper, the authors explained the overview of a method for detecting location of worker for development of a monitoring system for project progress management using RFID technology. Data is the RSSI (Receive Signal Strength Indication) from RFID tag attached to the worker installing a rolling shutter, and was obtained from antennas and RFID readers set around the construction site. Neural network was done using RSSI collected and the area where worker is performing a task, and an estimation model of the working area was prepared. The network had a range of the percentage of correctly classified from 62% to 92%. The authors suggested the method to make estimate by using integrated networks prepared in respect of RFID readers, and showed the percentage of correctly classified of 84.3%. According to the result, the authors confirmed the possibility of the monitoring system with RFID technology, and mentioned the factors necessary to develop for further practical use.

  • PDF

DERIVING ACCURATE COST CONTINGENCY ESTIMATE FOR MULTIPLE PROJECT MANAGEMENT

  • Jin-Lee Kim ;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.935-940
    • /
    • 2005
  • This paper presents the results of a statistical analysis using historical data of cost contingency. As a result, a model that predicts and estimates an accurate cost contingency value using the least squares estimation method was developed. Data such as original contract amounts, estimated contingency amounts set by maximum funding limits, and actual contingency amounts, were collected and used for model development. The more effective prediction model was selected from the two developed models based on its prediction capability. The model would help guide project managers making financial decisions when the determination of the cost contingency amounts for multiple projects is necessary.

  • PDF

A PROFIRABILITY MODEL BASED ON PRIMARY FACTOR ANALYSIS IN THE EARLY PHASE OF HOUSING REDEVELOPMENT PROJECTS

  • Kyeong-Hwan Ahn;U-Yeong Gim;Jong-Sik Lee;Won Kwon;Jae-Youl Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.497-501
    • /
    • 2013
  • An important decision-making element for the success of housing redevelopment projects is a prediction of the profitability of redevelopment. Risk factors influencing profitability were deduced through a review of the literature about profitability and a risk analysis developed by a survey of maintenance projects. In addition, a profitability prediction depending on the analysis of risk factors is necessary to judge the business feasibility of a project in the planning stages. A profitability prediction model of management and disposal method, which is calculated by proportional rate and which helps estimate contributions to profitability, is proposed to prevent difficulties in business development. The proposed model has the potential to prevent interruptions, reduce the length of projects, generate cost savings, and enable rational decision-making during the project period by allowing a judgment of profitability at the planning stage.

  • PDF

DEVELOPMENT PROCESS OF INFORMATION FLOW RETRIEVAL SYSTEM FOR LARGE-SCALE CONSTRUCTION PROJECTS

  • Jinho Shin;Hyun-soo Lee ;Moonseo Park;Jung-ho Yu;Jungseok Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.556-560
    • /
    • 2011
  • Players of construction projects proceed with each work process by information gathering, modification and communication. Due to the complex and long-span lifecycle projects increased, it became more important to grasp this mechanism for the successful project performance in construction project. Hence, most project information management systems or knowledge management systems equip information retrieval system. There are two logic to infer the meaning of retrieval target; inductive reasoning and deductive reasoning. The former is based on metadata explaining the target and the later is based on relation between data. To infer the information flow, it is necessary to define the correlation between players and work processes. However, most established information retrieval systems are based on index search system and it is not focused on correlation between data but data itself. Thus, this research aims to research on process of information flow retrieval system for large-scale construction projects.

  • PDF

Development of a BIM Object Partitioning System for 4D Simulation in Mixed Reality

  • Jaehong Cho;Sungpyo Kim;Kanghyeuk Lee;Sungjin Choi;Sanghyeok Kang
    • International conference on construction engineering and project management
    • /
    • 2024.07a
    • /
    • pp.672-679
    • /
    • 2024
  • This study introduces a novel system for the 4D simulation of Building Information Modeling (BIM) objects in mixed reality (MR) environments, addressing challenges of file format compatibility and data management. By developing a system that effectively partitions and manages BIM data, specifically utilizing the OBJ format, the study enables precise simulation of construction project changes over time. This advancement enhances visualization and decision-making in construction project planning and execution. The study highlights the integration of BIM and MR technologies, facilitating enhanced project management and operational workflows. Future work will focus on expanding compatibility with various BIM data formats and MR devices, and integrating AI-based data analysis for more accurate and efficient construction simulations.

A Study on Structural Characteristics of US Urban Development Project and Flexibility of Crisis Response -Focusing on A Comparative Analysis of Hudson Yard and Yongsan International Business District Development- (미국 도시개발사업의 구조적 특징과 위기대응의 유연성 연구 -허드슨 야드 개발의 위기극복 과정을 중심으로-)

  • Lee, Woo-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.80-87
    • /
    • 2017
  • In the past, the United States has been engaged in large-scale urban development projects as a tool for urban regeneration to revitalize distressed urban areas. On the other hand, large-scale urban development projects have been stalled or discontinued globally since the 2008 economic crisis. Despite this, the Hudson Yard development, which is the subject of this study, has resumed smoothly due to the characteristics of its development structure and rational negotiation process. Most domestic developments depend on the economic circumstances, and the problems that are exposed in a privately led development are repeated; the Yongsan International Business District Development is a representative failure case. This study examined the characteristics of the business structure and the nature of the negotiation process in the Hudson Yard development project in New York City.

WID, GAD or Somewhere Else? A critical analysis of gender in Korea's international education and development

  • Lee, Ji Min;Yoo, Sung-Sang;Hong, Moon Suk
    • Journal of Contemporary Eastern Asia
    • /
    • v.18 no.1
    • /
    • pp.94-123
    • /
    • 2019
  • Over the past few decades, gender equality has been considered one of the fundamental principles and a significant crosscutting issue in international development. However, beyond applying 'gender equality' as a policy buzzword, there has been a lack of critical reviews on how generally 'gender equality in education' is understood and constructed in Korea's development programs and projects. In this regard, this paper explores the use of vocabularies and semantic meanings of gender equality in the Korean Government's Academic Cooperation Program and its 52 projects. By applying mixed contents analysis as a method, the research resulted in several findings: first, the policy papers recently highlighted Korea's directions on gender mainstreaming and gender-sensitive approaches in international development. Second, 'integrating women and girls' into education institutions was emphasized in various projects; third, the term women rather than gender were used in the texts, highlighting their position as a 'marginalized group.' Lastly, there was a lack of evidence of projects dealing with changing gender-based power relations. The constructed gendered relations and powers were identified throughout projects, usually acting as barriers to project activities. However, they were only identified, not challenged, by the program. In conclusion, whilst Korean international development and educational development discourse actively embrace Women in Development (WID) and Gender and Development (GAD) in their programs, it is time to consider the issue of gender equality from different standpoints, such as identity, rights, and capabilities and a more active engagement with Korea's domestic issues in gender discourse and practices is also needed.

INDICATOR FOR PERFORMANCE MANAGEMENT OF CONSTRUCTION CALS

  • In-Su Jung;Jin-Uk Kim;Chan-Sik Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1340-1345
    • /
    • 2009
  • Ministry of Land, Transportation and Maritime Affairs has implemented Construction CALS project for improving informationization level of construction industry and for making construction production system efficient. Although an importance of evaluation on level and performance of construction informationziation projects has been emerged, Construction CALS hasn't been evaluated so far. In this study, the performance indicators of construction CALS as the most important base in creating a performance management system were deduced. For this aim, this study reviewed the former researches on system construction for managing performance, analyzed current status of Construction CALS, arranged the relationship between upper strategies and ISP, developed pools of performance indicators, and this study followed IT BSC methodology. As a result, this study developed performance indicators of Construction CALS through four strategies such as globalization and activation of Construction CALS standards, research & development for reaching to international level in construction informationization technology, stabilization of system operation and distribution by publicizing Construction CALS and improving its functions, and policy implementation for managing and coordinating Construction CALS projects. These indicators will be applied to build a system of performance management.

  • PDF

A Study on Agricultural Extension of Doi Chaang Coffee Complex in Thailand (태국 도이창 커피단지의 농촌지도에 관한 조사연구)

  • Choe, Pyeong-Ik;Kim, Myung-Hee
    • Journal of Agricultural Extension & Community Development
    • /
    • v.16 no.1
    • /
    • pp.51-67
    • /
    • 2009
  • This study was carried out to investigate the major factors of the successful development of Doi Chaang Coffee Complex, Chiang Rai of Thailand. Data were gathered through field survey, library research and internet so on. Interviews were conducted with specialist, community leaders, board member of Doi Chaang Coffee Company from 14 to 19, January 2007. The major factors for the successful development observed were as follows: 1) Successful selection of crops and farming system(SALT) with regards of slopes and meteorological condition; 2) Leadership of the King of Thailand and the chief of Akha in terms of attitudinal change of hill-tribes in agriculture extension; 3) supporting by Royal Project Foundation; 4) Quality control through post harvest management by cooperative system; 5) Cooperation between the Coffee Producers' Cooperatives of Thailand and for the international Doi Chaang Coffee Corporation of Canada in terms of fair trade and so on.

  • PDF

Policy Suggestions for Fostering Teacher ICT Competencies in Developing Countries: An ODA Project Case in Peru

  • SO, Hyo-Jeong;SEO, Jongwon
    • Educational Technology International
    • /
    • v.21 no.2
    • /
    • pp.217-247
    • /
    • 2020
  • Many developing countries consider ICT as a key enabler to improve their educational systems and teachers are viewed as change agents. This paper aims to present policy suggestions concerning how to foster teachers' ICT competencies in developing countries based on the outcomes of an ODA project case in Peru. This study was conducted through three stages: Literature survey, site visit, and policy suggestions. To draw relevant policy suggestions, we employed the framework of the 'macro-meso-micro' level of teacher professional development. The following policy suggestions are discussed: (a) macro level: to develop the national framework of teacher ICT competencies and competency-based teacher training, (b) meso-level: to promote teacher communities of practices and school-based research programs, and (c) micro-level: to redesign teacher professional development programs to help teachers better understand the complex relationships between content, pedagogy, and technology, beyond learning about basic ICT literacy skills. This study contributes to the understanding of how ODA projects can approach the issue of teacher ICT capacity building at multiple levels.