• Title/Summary/Keyword: integration of construction

검색결과 846건 처리시간 0.029초

도시철도 추가 건설에 따른 서울시 역내 지역별 접근성 변화 (Changes in Accessibility of Seoul Metropolitan Area by the Construction of Additional Urban Railway)

  • 이상현;김옥연
    • 대한건축학회논문집:계획계
    • /
    • 제35권12호
    • /
    • pp.105-114
    • /
    • 2019
  • The goal of this study is to quantitatively evaluate the effects of the additional construction of urban railroads. To this end, 1) establish accessibility as a measure of quantitative evaluation of construction effects; 2) select the 'Integration' of Space Syntax as a quantifiable indicator of accessibility; 3) represent the Seoul railroads as a network; 4) calculate the 'Integration' form the network before and after the additional construction of the urban railroads. By calculating the change of the 'Integration' of the individual nodes and the change of the sum of the 'Integration' of given zones, the change in accessibility of a particular node and the change in accessibility of a particular region were calculated. After analyzing the change in accessibility in nodes and areas as well, it was confirmed that the additional construction of urban railroads was improving accessibility as a whole of Seoul. It was also identified that there was a degree of difference in the extent of the accessibility change for the different areas. It is particularly noteworthy that changes occur in the accessibility ranking. While certain regions were improving relative rankings, others fell in rank. With this finding, it could be argued that active consideration of the areas in which the relative decline occurs is needed when the planned urban railroad is being built.

건설감리 통합화를 위한 기초 연구 (A Basic Study of the Construction Supervision Integration)

  • 황은경;김수암
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2006년도 추계학술발표대회 논문집
    • /
    • pp.223-226
    • /
    • 2006
  • Fields of domestic construction supervision are divided into architecture, electricity, information and communication and fire by the individual laws. Between each supervision are lack of relationship. So it bring about performance degradation, supervision fee increasing and dispute. The purpose of this basic research is to suggest the integration method of each supervision.

  • PDF

원자력발전소 생애주기를 고려한 시공정보 관리방안 연구 (Research on the Methode of Construction Information Management Considering the Nuclear Power Plant Life Cycle)

  • 변수진;이상현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.229-230
    • /
    • 2016
  • The Nuclear Power Plant construction industry has the related to Information-integration field. In this study, the end user developed an Information Management System early in the project, and developed a management structure that systematically integrates and interfaces with information in each life-cycle phase. Particularly this paper related to the construction information of component.

  • PDF

A COST-BENEFIT ANALYSIS OF INTEGRATING ERP SYSTEMS WITH PROJECT MANAGEMENT SYSTEMS IN CONSTRUCTION

  • BooYoung Chung;Miroslaw J. Skibniewski
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.575-586
    • /
    • 2005
  • This paper presents an approach to quantifying the costs and benefits of integrating ERP systems with project management systems, including potential time and cost savings. To properly identify the costs and the benefits, the paper shows the relevant construction information flows and the desired milestones in the integration process. The proposed benefit analysis model should allow construction firms considering the integration of their ERP systems with legacy systems or commercial project management software make informed decisions in regard to the existing alternatives in the early stages of decision making.

  • PDF

초지연 콘크리트의 타설 범위가 시공줄눈 일체화 성능에 미치는 영향 (Effect of Joint width of SRA Concrete on Integration Performance of Construction Joints)

  • 정준택;김수호;정영진;현승용;김종;한민철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.193-194
    • /
    • 2023
  • This study attempted to derive an appropriate application range by reviewing the integration performance of joints according to the application range of SRA concrete. As a result, it was confirmed that the integration performance was improved even if SRA concrete was placed only by 75mm, which is 0.5 times the thickness of the member.

  • PDF

물량 산출 및 생산성 분석 기반의 거푸집공사 비용공정 통합 모델 (Integration Model of Cost and Schedule in Aluminum Form Work based on Quantity Take-offs and Daily Productivity Analysis)

  • 지성민;현창택
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.17-18
    • /
    • 2011
  • Over the past 20 years, Researchers have tried to develop "Integration Model of Cost and Schedule" in construction industry. They suggested various models and techniques, however, it is still required to develop new methodology for AL Form Work in Public Multi-Housing Projects. Accordingly, this research focused on measuring quantity take-offs of on-going projects and analysing the basic process of using the resources(Labor, Material, Plant) related to cost and time data. There are 3 steps of this research : 1) The literature review of previous studies about Integration Model of Cost and Schedule was conducted. 2) Model for integration between cost and schedule was developed. 3) the accuracy of developed model was verified. The results are expected to improve in integrated managing the cost and schedule data of AL form work.

  • PDF

Work Packaging Model의 개선을 통한 공정 - 공사비 통합모델 구축 (A Study on the Cost and Schedule Integration Model based on the Improvement of Work Packaging Mode)

  • 김양택;현창택
    • 한국건설관리학회논문집
    • /
    • 제1권4호
    • /
    • pp.82-90
    • /
    • 2000
  • 낙후된 국내 건설관리기술을 선진화$\cdot$합리화하기 위한 방안 중의 하나로 공정-공사비 통합관리가 많은 주목을 받고 있다. 정부에서도 공정과 공사비의 통합관리의 필요성을 인식하고 이의 도입을 적극검토하고 있다 실제로 해외공사를 통해서 양성된 국내 공정관리 전문가들의 노력으로 최근 일부 공공기관의 건설사업에서는 공정-공사비 통합관리를 부분적으로 활용하고 있는 상황이다. 그러나 그 기법 및 전산모델이 이론에 국한된 것이거나 국내의 특수한 여건을 수용하지 못하는 것이 대부분이기 때문에 활용에 많은 어려움이 있으며 국내 건설환경에 완전하게 정착되지 못하고 있다. 본 연구의 목적은 통합관리의 정착을 지연시키는 국내의 특수한 여건 및 문제점을 파악하고 이를 토대로 국내 건설현장에서 적용할 수 있도록 공정-공사비 통합모델의 개선방안을 제시하는 것이다.

  • PDF

관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구 (A study on the integrated data modeling for the plant design management system and the plant design system using relational database)

  • 양영태;김재균
    • 한국해양공학회지
    • /
    • 제11권3호
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

비용-일정 통합관리를 통한 건축공사 실적관리 (Performance Management through Time-Cost Integration in Construction Project)

  • 김동진;임형철;최정석
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2001년도 학술대회지
    • /
    • pp.379-382
    • /
    • 2001
  • 국내 건설프로젝트는 공정관리와 원가관리의 이원적 관리체계를 가지고 있으며, 공정관리는 아직 그 체계가 미흡하고 상대적으로 관리의 중요도가 낮게 평가되고 있는 현실이다. 현재의 원가위주의 관리체계로는 프로젝트 진행과정상의 수행성과를 정확히 파악하기 어려우며, 이에 따라 공기지연, 공사비초과, 생산성저하 둥의 문제가 야기되고 있다. 따라서 프로젝트를 계획된 기간과 비용안에 효율적으로 완성하기 위해서는 비용과 일정의 통합관리를 통한 정확한 실적관리기법의 도입이 요구된다. 이에 본 연구에서는 실공정을 중심으로 한 실적관리를 통해 프로젝트의 성과를 정확히 파악하여 성공적 프로젝트 수행을 위한 방안으로 비용과 일정의 통합관리를 통한 실적관리 모델을 제시하였다.

  • PDF

프로젝트 단계별 건설객체의 성장에 근거한 건설데이터 통합 모델 (A Model for Construction Data Integration Based on Growth of Construction Object throughout the Overall Project Phases)

  • 김우영
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.143-150
    • /
    • 2003
  • 전설프로젝트 데이터의 통한적 운용은 건설 프로젝트의 효율적인 관il엔 있어 필수적이다. 최근 데이터 호환성(interoperability)에 기초한 통합방법론으로서 IFC(Industry Foundation Classes)가 제안되었고, IFC에 기초한 시스템 통합의 예가 나타나고 있다. 데이터 호환성(interoperability)의 개념은 각 시스템의 독립성을 보존하면서 시스템의 통합을 전개할 수 있도록, 건설객체를 시스템간의 데이터 공유 프로토콜로써 제시한다. 본 연구에서는 이 데이터 호환성의 기본 개념에 입각하되, 실제 프로세스의 업무범위와 절차를 고려한 단계적인 시스템 개발전략을 제시한다. 이는 실제 업무를 지원하는 정보시스템의 관점보다는 IFC에 의한 시스템 통합에 더 큰 비중을 두고 개발하는 경향에 대한 문제제기이며 그 극복방안이다. 즉, IFC 모델의 데이터 호환성 개념을 응용하여 실제 업무범위와 절차에 적합하게 배치되고 활용되어야 함에도 탁구하고, IFC의 형태에 치중한 결과 실제의 업무를 지원하지 못하는 시스템개발 경향을 극복하고자 한다.

  • PDF