• 제목/요약/키워드: integration of construction

검색결과 841건 처리시간 0.025초

드론 및 MMS를 활용한 건설현장 점군 데이터 통합 기술 개발 (Development of Pointcloud Data Integration Technology in Construction Sites via Drone Photogrammetry and MMS LiDAR)

  • 박재우;염동준
    • 한국산업융합학회 논문집
    • /
    • 제26권6_2호
    • /
    • pp.1145-1153
    • /
    • 2023
  • This study presents the development of pointcloud data integration technology in construction sites via drone photogrammetry and MMS LiDAR. The integration of pointcloud data from drones and MMS technology can provide precise and accurate 3D digital maps of construction sites, which can benefit the development of smart construction and BIM. The advantages of using both drones and MMS technology for pointcloud data acquisition in construction sites are discussed, along with the limitations and challenges of using drone photogrammetry and MMS LiDAR for pointcloud data integration. The results of this study can contribute to the advancement of pointcloud data integration technology in construction sites and improve the efficiency and accuracy of construction projects.

인테그레이션과 컴퓨터 사용이 건설프로젝트에 미치는 영향 평가 (An Evaluation of the Impact of Integration and Computerization on Construction Projects)

  • 김찬규
    • 한국건설관리학회논문집
    • /
    • 제2권4호
    • /
    • pp.92-97
    • /
    • 2001
  • The level of awareness and actual implementation of integration and computerization in the construction industry is growing. However, it is not clear at this point how to assess the extent of their impact and to identify in which ways they better support the construction projects related to their success. The objectives of this research are the development of a model to evaluate the impact of integration and computerization on construction projects and the recommendation of guidelines for companies in identifying suitable ways for them to incorporate integration and computerization Into their operation. The developed conceptual model has been found robust enough to be used as a benchmarking tool in evaluating the performance of the construction process and to strategize its future operation.

  • PDF

SYSTEM ARCHITECTURE FOR INTEGRATION OF CONSTRUCTION E-BUSINESS SOLUTIONS: A MODEL FOR ENTERPRISE RESOURCE PLANNING AND PROJECT MANAGEMENT SYSTEM

  • Boong-yeol Ryoo;Irtishad U. Ahmad;Juan Zheng
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.497-502
    • /
    • 2005
  • Needs of automation and computerization in the construction industry has been recognized but the implementation of e-business solutions with project management systems has not been fully explored. In order to cope with different management practices in home office and project sites, integration of two popular systems, Enterprise Resource Planning (ERP) and Project Management System (PMS) is essential. The objective of this study is to find ways to functionally and systematically integrate ERP and PMS. With the integration of ERP and PMS, a project will be managed much more efficiently and effectively. It is expected that this study will benefit system integrators and help them to understand construction management processes and integrate the solutions with minimized programming work.

  • PDF

항만건설사업관리시스템 통합화 (Integration for Port Construction Project Management System)

  • 정성윤;김영진;김태학;옥현
    • 한국콘텐츠학회:학술대회논문집
    • /
    • 한국콘텐츠학회 2013년도 춘계 종합학술대회 논문집
    • /
    • pp.431-432
    • /
    • 2013
  • 본 연구는 기존에 운영 중인 항만건설통합정보시스템의 활용성과 시스템 운영관리의 효율성을 높이기 위해 시스템을 통합화하였다. 도로와 항만 건설사업관리는 대상목적물만 다르고 기본적인 업무프로세스는 유사하다. 따라서 통합 개발기간을 단축하고 안정적으로 통합화하기 위해 항만건설통합정보시스템을 기존에 운영하고 있는 도로건설사업관리시스템으로 통합하는 방식으로 추진하였다. 도로건설사업관리시스템은 항만건설통합정보시스템보다 시스템 사용이 쉽고 편리하며 건설사업관리 업무프로세스 지원 및 관리기능이 안정적으로 설계되었다. 본 연구는 시스템 통합화 과정에서 겪었던 애로사항과 이를 해결하기 위한 방안을 제시하였다. 타 시스템을 통합화할 경우에 본 연구 결과를 활용한다면 반복적인 시행착오를 미연에 예방할 수 있을 것으로 사료된다.

  • PDF

Development and application of construction monitoring system for Shanghai Tower

  • Li, Han;Zhang, Qi-Lin;Yang, Bin;Lu, Jia;Hu, Jia
    • Smart Structures and Systems
    • /
    • 제15권4호
    • /
    • pp.1019-1039
    • /
    • 2015
  • Shanghai Tower is a composite structure building with a height of 632 m. In order to verify the structural properties and behaviors in construction and operation, a structural health monitoring project was conducted by Tongji University. The monitoring system includes sensor system, data acquisition system and a monitoring software system. Focusing on the health monitoring in construction, this paper introduced the monitoring parameters in construction, the data acquisition strategy and an integration structural health monitoring (SHM) software. The integration software - Structural Monitoring/ Analysis/ Evaluation System (SMAE) is designed based on integration and modular design idea, which includes on-line data acquisition, finite elements and dynamic property analysis functions. With the integration and modular design idea, this SHM system can realize the data exchange and results comparison from on-site monitoring and FEM effectively. The analysis of the monitoring data collected during the process of construction shows that the system works stably, realize data acquirement and analysis effectively, and also provides measured basis for understanding the structural state of the construction. Meanwhile, references are provided for the future automates construction monitoring and implementation of high-rise building structures.

3차원 가상건설기반 건축구조시스템의 개발방향 (A Development direction of the building structural system based on the 3D virtual construction)

  • 신태송;조영상;천진호
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2007년도 정기 학술대회 논문집
    • /
    • pp.346-351
    • /
    • 2007
  • As the construction technology is rapidly advancing internationally, the necessity of virtual construction technology development is drastically demanded in the construction industry together with a fusion technology with information technology(IT). The construction technology will be changed as the paradigm of construction technology in the future. The establishment of building structural system in the virtual construction basis is necessary for the integration of construction process, and it will be expected to produce the effect of reduction of construction period and quality improvement through the environment of integration. This study is to present the analysis of the existing process of structural design, the content of research & development as per the building structural system on virtual construction basis and the direction of research.

  • PDF

시공줄눈의 일체화를 위한 초지연제의 활용 (Application of Super Retarding Agent for Integration of Construction Joints)

  • 현승용;임군수;정영진;김종;한민철;한천구
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2022년도 가을 학술논문 발표대회
    • /
    • pp.15-16
    • /
    • 2022
  • This study is to confirm the integration performance of joints according to the method of applying the super retarding agent. When the super-delay system was applied, the integration performance was found to decrease somewhat on the 7th day of age. In the case of the 28th of age, it was found that the integration performance is improved. When a diluent is injected and a super delay agent is sprayed, shear bond strength is the highest.

  • PDF

성과측정유닛을 활용한 건설 비용 - 일정 통합관리 방안 (Construction Cost-Schedule Integration Management Methodolgy by using Progress Integration Unit)

  • 강남희;최재현
    • 한국건설관리학회논문집
    • /
    • 제18권3호
    • /
    • pp.42-51
    • /
    • 2017
  • 건설 프로젝트의 생산과정에서 성과를 지속적으로 측정하고 평가하는 것은 프로젝트관리의 성공적인 수행을 위한 핵심요소이다. 성과는 일반적으로 목적물에 할당 된 공정과 원가 관련 정보를 정량적으로 평가함으로써 측정되며, 객관적인 성과측정을 위해 공정과 원가가 통합적으로 계획 관리되어야 한다. 본 연구는 공정과 원가의 통합 모델을 통해 성과 측정 방법론을 제안하고 진도관리의 기반을 마련하는데 목적이 있다. 이를 위해 공정계획과 원가계획의 표준화된 업무 프로세스를 개발하였고, EVM과 기존의 통합 모델을 분석하여, 성과측정 유닛을 활용한 WBS와 CBS의 통합 방법론을 제시하였다. 플랜트 프로젝트의 시공단계를 중심으로 공통 성과측정의 대상은 공종으로 선정하여 성과측정 유닛을 규정하고 공정과 비용정보를 연계시켜 성과비율을 산정하였다. 또한 리소스의 적용시 원가요소 중 소모성자원의 비용을 배제하여 진도측정의 객관성을 향상하였다. 본 결과는 실제 플랜트 사례 프로젝트에 적용하여 실증되었으며, 개발된 방법론은 향후 프로젝트의 성과를 보다 객관적인 기준으로 평가할 수 있어 보다 효과적인 진도관리 방법이 될 것으로 판단된다.