Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.20
no.8
/
pp.15-21
/
2006
This paper concerns developing an integrated online/offline light facility management system using internet and building a database system for control box and street light. Also, we designed the system to minimize the disparity with the conventional management system by referring to an old management ledger format. Thus, the proposed method may enable the system manager to administer the light facility efficiently and to reduce the manpower and maintenance cost, economically.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2005.11a
/
pp.101-105
/
2005
This paper concerns developing a integrated online/offline light facility management system for light facility using internet and building a database system for control box and street light. Also, we designed the system to minimize the disparity with the conventional management system by referring to a old management ledger format. Thus, the proposed method may enable the system manager to administer the light facility efficiently and to reduce the manpower cost, and time economically.
International Journal of Computer Science & Network Security
/
v.22
no.1
/
pp.319-323
/
2022
The information research system continues to be developed and directed at leading research National Institute of Technology (ITN) Malang in accordance with the Research Strategic Plan of ITN Malang. One of them is a computer system in a complete integrated facility management activity, such as this research scheme. The purpose of this research is to combine and integrate people, places, product, processes and technology. All of them are integrate existing organizational factors into a more effective, simplifying of complex processes, identifying and scheduling, notes, decision makers and more. This research was conducted in stages by design with a structured model stage for 3 (three) years (focus on humans, products and processes), research on Integration Facility Management: Interface Coordination in human resources and product management have been completed on 2019 and 2020. While the focus of research this year is to obtain an integrated facility management Interface Coordination in Process Management.
Journal of the Korea Academia-Industrial cooperation Society
/
v.21
no.11
/
pp.9-18
/
2020
Recently, studies of integrated management platform and performance-based maintenance decision-marking systems have proceeded to the efficient management of port facilities. The purpose of this study was to manage and operate port facilities based on performance and to provide long-term durability and budgetary execution. Thus, it is essential to secure basic data to be analyzed in an integrated platform and decision-marking system. This study derived the data linkage measures to secure port facility design and management information. The target of deriving the data linkage was the POMS (Port Facility Management System) currently in operation by the MOF (Ministry of Oceans and Fisheries). To derive data linkage, analyze the database of POMS and select the data required for the operation-integrated platform and decision-marking system. The final data linkage target was determined by compiling the requirements of the relevant experts and selecting the final target of three groups (port and facility information, management information, and user information). As a result, the API interface design was prepared for detailed linked data and data linkage framework between the linkage data of POMS. The provision of real-time data linkage between POMS and integrated platform is expected to improve the operational efficiency of the integrated platform.
KARI(Korea Aerospace Research Institute) is achieving the KSLV program according to National Space Technology Development Program. In this paper, the authors are intend to introduce the Integrated Power Plant(IPP) test facility which will be constructed for the variety of tests on KSLV program. IPP test facility refers to comprehensive testing equipment for liquid rocket launch vehicle. Using this facility, KARI can verify the adaptedness of parts and subsystems for launch vehicle and finally can qualify the system characteristics of launch vehicle doing kinds of test including hot firing test. IPP test facility will make it possible to simulate the vehicle launching circumstances and to predict the performance of launch vehicle during its flight test.
Lee, Jae Wook;Baik, Song Hoon;Seo, Myung Woo;Song, Kyu Seog
KIEAE Journal
/
v.9
no.5
/
pp.97-104
/
2009
In the process of urban development, the increase in the number and the complexity of urban facilities gives rise to a variety of problems, such as increase in construction and maintenance cost. In particular, taking into account the fact that an emergency situation in an urban facility can cause substantial loss of property as well as casualties, it becomes important to intelligently perceive states of facilities and properly execute countermeasures through real-time monitoring. In recent years, practitioners and researchers have made efforts to improve current passive and manpower-dependent facility management systems to be more active and intelligent, by applying diverse ubiquitous computing technologies for the u-City project. In this study, after discussing major drawbacks of the conventional facilities management, the concept and the model of a sensor-based integrated intelligent management system for urban facilities are proposed. The proposed model, by analyzing and processing real-time sensor data from urban facilities, not only supports the management of individual facilities, but also enables the detection of complex facility-related events and the process of their countermeasures. This active and intelligent management of urban facilities is expected to overcome the limitation of the conventional facilities management, and provide more suitable facility management services for the u-City development.
Korean Journal of Construction Engineering and Management
/
v.5
no.2
s.18
/
pp.55-63
/
2004
A building structures was used the facility management phase through $planing\cdotdesign\cdotconstruction$. phase. building's length of life was shorter than its physical length of life, because of the lack of law and institution, the lack of related agencies' preparation and owner's preparation. Also, considering the construction life-cycle, the facility phase accounted for $70\%$ of whole official lift, therefore, it needed to be opposed to systemic facility management. Current facility management system practically managed the defect of facility and almost never communicated between the other phase. In the side of policy, domestic law, institution, and policy related to building structure focused built-up market. and then the management of existing facilities was not consolidated efficiently. The purpose of this study was to suggest the direction of facility management construction for managing, utilizing, and operating public facilities, moreover, to study the direction of current facility management system improvement corresponding to total computer integrated construction system under government agencies.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.5
/
pp.2724-2731
/
2014
As the future national defense plan of government focus on advanced weapon system, military maintenance facility becomes more important. However, military maintenance facility has been managed by director's experience and simple mathematical calculation until now. Thus, the optimization for the management of military maintenance facility is suggested by more scientistic and logical methods in this study. The study follows the procedure below. First, simulation is designed according to the analysis of military maintenance facility. Second, independent variable and dependent variable are defined for optimization. Independent Variable includes the number of maintenance machine, transportation machine, worker in the details of military maintenance facility operation, and dependent variable involves total maintenance time affected by independent variable. Third, warmup analysis is performed to get warmup period, based on the simulation model. Fourth, the optimal combination is computed with evolution strategy, meta-heuristic, to enhance military maintenance management. By the optimal combination, the management of military maintenance facility can gain the biggest effect against the limited cost. In the future, the multipurpose study, to analyze the military maintenance facility covering various weapon system equipments, will be performed.
Kim, Kwagnsoo;Lee, Kang Woo;Kim, Bong Wan;Jang, In Sung
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.38
no.6
/
pp.553-559
/
2020
In order to prevent subsidence in urban areas, which is a major cause of damage to aging underground facilities, an integrated underground space map is being produced for systematic management of underground facilities. However, there is a problem of delaying the update time because an unupdated underground facility object is included in the process of updating the underground space integrated map. In this paper, we proposed a method to shorten the update time of the integrated map by selecting only the updated objects required for the update process of the underground space integrated map based on the central point of the underground facilities. Through the comparison of the centroid, the number of search targets is greatly reduced to shorten the search speed, and the distance of the actual location values between the two objects is calculated whether or not the objects are the same. The proposed method shows faster performance as the number of data increases, and the updated object can be reflected in the underground space integrated map about four times faster than the existing method.
Kim, Song-Hwa;Kim, Sung-Kyum;Cho, Chang-Yeon;Son, Jae-Ho;Kim, Jae-On
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2007.11a
/
pp.403-407
/
2007
Korean Government conducted "a research for establishing the integrated construction information classification system" and suggested the classification system for the first and second level in terms of the complexity in May, 2001. The Ministry of Construction and Transportation announced a standard of the integrated construction information classification system using previous research in August, 2001. Since 2005, many BTL projects have been constructed for the educational facility. However, there is mixed official standard of the system for the educational facility. Moreover, it is difficult for the SPC to use the current "integrated construction information classification system", since the item in the educational facility cannot be easily located in the current system. Thus, this research suggests an efficient maintenance system for the educational facility. Two classification systems, space-oriented and element-oriented systems, are suggested to increase efficiency of the classification system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.