• Title/Summary/Keyword: instreamflow

Search Result 13, Processing Time 0.033 seconds

Calculation of Total Maximum Daily Load using Instreamflow Requirement (하천유지유량을 이용한 일최대 오염허용부하량 산정 방안)

  • Chung, Eun-Sung;Kim, Kyung-Tae;Kim, Sang-Ug;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.3
    • /
    • pp.317-327
    • /
    • 2008
  • This study developed the methodology to calculate the total daily maximum load (TMDL) using the instreamflow requirement because the previous TMDLs were too simple to easily achieve. Instreamflow requirement which was the average low flow ($Q_{275}$) in the previous planning cannot consider the seasonal variation of streamflow. Therefore, this study used the instreamflow requirement which is a maximum value among hydrologic drought flow ($Q_{355}$), and environmental flows for ecology and scenery. The environmental flows for ecology were calculated using Physical HABitat SIMulation system (PHABSIM) which can estimate the necessary flow for fish survival by life cycle. Using the proposed method, all monthly TMDLs of streams in the Anyangcheon were calculated for the application.

Assessment of water supply reliability in the Geum River Basin using univariate climate response functions: a case study for changing instreamflow managements (단변량 기후반응함수를 이용한 금강수계 이수안전도 평가: 하천유지유량 관리 변화를 고려한 사례연구)

  • Kim, Daeha;Choi, Si Jung;Jang, Su Hyung;Kang, Dae Hu
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.12
    • /
    • pp.993-1003
    • /
    • 2023
  • Due to the increasing greenhouse gas emissions, the global mean temperature has risen by 1.1℃ compared to pre-industrial levels, and significant changes are expected in functioning of water supply systems. In this study, we assessed impacts of climate change and instreamflow management on water supply reliability in the Geum River basin, Korea. We proposed univariate climate response functions, where mean precipitation and potential evaporation were coupled as an explanatory variable, to assess impacts of climate stress on multiple water supply reliabilities. To this end, natural streamflows were generated in the 19 sub-basins with the conceptual GR6J model. Then, the simulated streamflows were input into the Water Evaluation And Planning (WEAP) model. The dynamic optimization by WEAP allowed us to assess water supply reliability against the 2020 water demand projections. Results showed that when minimizing the water shortage of the entire river basin under the 1991-2020 climate, water supply reliability was lowest in the Bocheongcheon among the sub-basins. In a scenario where the priority of instreamflow maintenance is adjusted to be the same as municipal and industrial water use, water supply reliability in the Bocheongcheon, Chogang, and Nonsancheon sub-basins significantly decreased. The stress tests with 325 sets of climate perturbations showed that water supply reliability in the three sub-basins considerably decreased under all the climate stresses, while the sub-basins connected to large infrastructures did not change significantly. When using the 2021-2050 climate projections with the stress test results, water supply reliability in the Geum River basin was expected to generally improve, but if the priority of instreamflow maintenance is increased, water shortage is expected to worsen in geographically isolated sub-basins. Here, we suggest that the climate response function can be established by a single explanatory variable to assess climate change impacts of many sub-basin's performance simultaneously.

Determination of Instreamflow Requirement for Upstream Urban Watershed Using SWAT Model (SWAT 모형을 이용한 도시하천 상류유역의 하천유지유량 산정방안)

  • Lee Kil-Seong;Chung Eun-Sung;Shin Mun-Ju;Kim Young-Oh
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.8 s.169
    • /
    • pp.703-716
    • /
    • 2006
  • The flow duration curves in the present and the ideal hydrologic cycle were derived using SWAT model. The present situation is the landuse and the groundwater withdrawal in the year of 2000 and the ideal situation is the landuse of 1975 and no groundwater withdrawal. These results were compared with the previous instream flow requirements which are the larger flow between the average drought flow and environmental control flow. As a result, the present and ideal drought flows of Ojeoncheon, Hakuicheon, Samseongcheon, and Sammakcheon, were the same and the drought flows of Samseongcheon and Sammakcheon were even zero since the baseflow is very little due to the small and mountainous watersheds. The previous instream flow requirement for the riverine function is also larger than the low flow of the ideal hydrologic cycle. The present method to set the instream flow requirement is not proper for the small mountainous watershed since it can be usually overestimated and drive the artificial measures to secure the streamflow Therefore, another method should be developed such as the low flow and the average flow between the drought flow and the low flow of the ideal hydrologic cycle using the proper hydrologic simulation model such as SWAT which can consider the landuse.

Impact Analysis of Construction of Small Wastewater Treatment Plant Under Climate Change (기후변화를 고려한 소규모 하수처리장 건설에 대한 영향 분석)

  • Park, Kyungshin;Chung, Eun-Sung;Kim, Sang-Ug;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.26 no.2
    • /
    • pp.268-278
    • /
    • 2010
  • This study derived the effectiveness analysis results of construction of wastewater treatment plant under climate change scenarios. Canadian Global Coupled Model (CGCM3) was used and A1B and A2 of Special Report on Emission Scenario (SRES) were selected. Regional climate change data for this application were downscaled by using Statistical Downscaling Model (SDSM) and the flow and BOD concentration durations were obtained by using Hydrological Simulation Program - Fortran (HSPF). The criteria for low flow and water quality were chosen as $Q_{99}$, $Q_{95}$, $Q_{90}$ and $C_{30}$, $C_{10}$, $C_1$. The numbers of days to satisfy the instreamflow requirements and target BOD concentration were also added to the criteria for comparison. As a results, small wastewater treatment plant improved the water cycle due to the increase of low flow and the decrease of BOD concentration. But climate change affected the reduction of effectiveness significantly. Especially in case of construction of small waste water treatment plant in the upstream region, it is necessary to take climate change impact into consideration since it is usually related to the low flow and the water quality of the stream.

A Study on Evaluation and Prioritization Process of Wastewater Reuse Alternative in Watershed Level (유역차원의 하수처리수 재이용 대안평가와 우선순위 결정과정에 관한 연구)

  • Chung, Eun-Sung;Jun, Sang-Mook;Lee, Jin Hee;Ahn, Jong Ho
    • Journal of Korean Society on Water Environment
    • /
    • v.29 no.2
    • /
    • pp.259-269
    • /
    • 2013
  • This study aims to show the feasibility of wastewater reuse through hydrological analysis and propose a framework for planning using multi-criteria decision making technique. Ten alternatives of wastewater reuse (BOD: 3.0 mg/L & 4.7 mg/L) and two references in the urban watershed were considered and analyzed by using Hydrological Simulation Program in Fortran (HSPF). Though wastewater reuse has a positive effect on water quantity, it may degrade the water quality due to the high discharge concentration. This study showed that wastewater reuse can be a great alternative for the rehabilitation of distorted water cycle, if the quality is improved up to the natural streamflow and the quantity is increased up to the instreamflow requirement. In addition, to determine the project priority, three criteria were compared: 1) impacts on water quantity and water quality, respectively, 2) consideration of present hydrologic vulnerabilities on water quantity and quality and not, and 3) social and economic considerations and not. From the performance values to all criteria, the specific ranking can be derived and the feasibility of each wastewater reuse project can be checked with the comparison of the existing facilities. As a result, DJ and DR were derived to become effective in any evaluation conditions while SS and WG were improper alternatives if various criteria were considered. The decision making for project prioritization must be careful with the consideration of various impacts of wastewater reuse because the evaluation of wastewater reuse alternative showed very different priorities for each criteria.

Comparison of Water Supply Reliability by Dam Operation Methods (댐 운영방식에 따른 이수안전도의 비교)

  • Choi, Si Jung;Lee, Dong-Ryul;Moon, Jang Won
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.6
    • /
    • pp.523-536
    • /
    • 2014
  • A water supply reliability is mainly influenced by water demand, reservoir storage, and inflow change caused from drought. The water supply reliability can vary depending on the method of dam operation. In Korea, the deficit-supply method which complements water deficit as water shortage occurs in downstream areas has been used for the national water resources master plan using K-WEAP, but the prime flow method, an alternative approach, would show different results of water supply reliability in comparison to the deficit-supply method. The objective of this research is to compare and analyze differences in water supply reliability according to dam operation methods. These results can be used to re-evaluate water supply reliability of dam in a circumstance considering steady dam release for instreamflow in downstream and hydroelectric power generation.

Estimating Attributes Value of Alternatives Applied for Rehabilitation of Hydrologic Cycle of the Anyangcheon Watershed (물순환 건전화 대안 적용을 위한 안양천의 속성별 가치추정)

  • Kong, Ki-Seo;Chung, Eun-Sung;Lee, Kil-Seong;Yoo, Jin-Chae
    • Journal of Korea Water Resources Association
    • /
    • v.39 no.12 s.173
    • /
    • pp.1031-1042
    • /
    • 2006
  • In recent years, a growing concern exists in watershed and stream improvement projects. Under these circumstances, this paper estimates monetary value of the attributes of alternatives for rehabilitation of hydrologic cycle using choice experiments. Choice experiments shows vivid image and estimates a willingness to pay based on their preference for environmental goods. A preliminary survey shows that the attributes of the Anyangcheon watershed are flood-damage possibilities, Instreamflow, water quality, river characteristic and estimates the tax for the Anyangcheon watershed improvements. We surveyed 200 citizens were selected as samples of watershed beneficing in Seoul and Gyeonggi Province and used conditional logit model to analyze the implicit values of the attributive per household. The benefit of the attributes by province based on the implicit price obtained from estimated parameters were calculated. This study is expected to contribute to the decision-making process for policy-makers by providing useful methodological framework and quantitative information related to watershed improvement projects.

Determination of water supply quantity for instreamflow requirement of the Cheongmicheon watershed considering climate change scenarios (기후변화 시나리오를 고려한 청미천 유역의 유지유량 공급량 결정)

  • Song, Young-Hoon;Chung, Eun-Sung;Kim, Soo-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.416-416
    • /
    • 2018
  • 본 연구는 과거자료와 기후변화 시나리오의 강수자료를 고려하여 유역 간 도수 사업의 용수공급량을 효과적으로 결정하는 방안을 제안하였다. 1985년 1월 ~ 2017년 6월까지 과거자료와 2011년부터 2100년까지의 RCP(Representative Concentration Pathway) 4.5 및 8.5 시나리오에 대해 각각 적용하였다. 청미천의 유량은 SWAT 모형을 이용하였는데 SUFI-2 알고리즘을 이용하여 최적 매개변수를 산정하였다. 본 연구는 도시 농촌 복합유역인 청미천 유역을 대상으로 하였으며 국토교통부가 고시한 원부교 지점의 하천 유지유량($0.96m^3/s$)의 연간 불만족일수를 분석하였다. 청미천 유역을 대상으로 현재 설치하고 있는 약 $30,000m^3$/일 규모의 용수 공급시설의 적용에 따른 불만족일수에 대하여 과거 강우자료를 이용하여 분석한 결과, 시설 적용 전 불만족 일수는 평균 54.94일/년이었고 적용 후에는 불만족일수가 평균 45.33일/년으로 10.61일/년이 감소하였다. 미래 기후변화 시나리오에 대해 분석하면 적용 전의 RCP 4.5의 평균 불만족일수는 65.99일/년이며 적용 후에는 11.82일/년이 감소한 54.17일/년으로 나타났다. RCP 8.5에서는 평균 불만족일수는 49.16일/년에서 39.16/년일 으로 10.0일/년이 감소하였다. 즉 현재 사업규모로는 하천유지유량 만족일수가 여전히 큰 것으로 나타났다. 따라서 본 연구에서는 기후변화 시나리오를 고려하여 최소최대후회도 접근법을 토대로 효과적인 유지 용수공급량을 결정하는 방법을 적용하였다. 단위 용수공급량이 증가할 때마다 늘어나는 불만족일수 감소량에 대해 연도별로 다른 값 중에 최댓값과의 차이를 후회도로 정의하고 용수공급량 별로 최대 후회도를 산정하였다. 이 중 최솟값을 나타내는 용량을 선택한 결과 RCP4.5는 $110,000m^3$/일, RCP8.5는 $90,000m^3$/일로 도출되었다.

  • PDF

The Analysis of Potential Discharge to Supply the Stream Water Discharge in Paldang Dam by Dam Operation (댐 운용을 통한 팔당댐의 하천용수 공급가능량 분석)

  • Choi, Gye-Woon;Kim, Young-Kyu;Ham, Myeong-Soo;Hwang, Young-Man
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.8 no.6
    • /
    • pp.121-128
    • /
    • 2008
  • Instream flows are defined as the stream flows needed to protect and preserve instream resources and values. They are supplied by the essential discharge for maintaining the channel. However, due to the lack of precipitation during the dry season, which is usually between the months of January and April, natural flows are not enough for the instream flows, thus leaving the dams at a shortage. In this paper, the method which will be discussed will show a physical way to improve water quality by the dilution of water that is supplied from a reservoir or dam, and how it is analyzed at the Han River basin. For the sake of this analysis, the basin has been divided into 33 catchments. Each catchment's natural flow has been simulated by SWAT-K, and the future water demand has been estimated using statistical data. It has also been assumed that the Han River basin has two large reservoirs(Chung-ju dam, and So-yang dam). The supply of potential discharge has been calculated using a case of water separately from each dam, as well as supply water from both dams.

Effectiveness Analysis of Alternatives for Water Resources Management Considering Climate Change and Urbanization (기후변화 및 도시화를 고려한 수자원관리 대안의 효과 분석)

  • Park, Kyung-Shin;Chung, Eun-Sung;Kim, Sang-Ug;Lee, Kil-Seong
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.12
    • /
    • pp.1103-1111
    • /
    • 2009
  • This study derived the analysis results of alternatives for integrated watershed management under urbanization and climate change scenarios. Climate change and urbanization scenarios were obtained by using SDSM (Statistical Downscaling Method) model and ICM (Impervious Cover Model), respectively. Alternatives for the Anyangcheon watershed are reuse of wastewater treatment plant effluent, and redevelopment of existing reservoir. Flow and BOD concentration duration curves were derived by using HSPF (Hydrological Simulation Program - Fortran) model. As a result, low flow ($Q_{99},\;Q_{95},\;Q_{90}$) and BOD concentration ($Q_{10},\;Q_5,\;Q_1$) were very sensitive to the alternatives comparing to high flow($C_{30},\;C_{10},\;C_1$). Although urbanization makes the hydrological cycle distorted, effective alternatives can reduce its damage. The numbers of days to satisfy the instreamflow requirements and target water quality were also sensitive to urbanization. This result showed that the climate change and urbanization should be considered in the water resources/watershed and environmental planning.