• 제목/요약/키워드: initial expenses

검색결과 62건 처리시간 0.02초

병원급식 위탁관리의 운영 실태조사 (A Study on the Status of Contract Managed Hospital Food Services)

  • 김진수;양일선;김현아;박문경;박수연
    • 대한영양사협회학술지
    • /
    • 제9권2호
    • /
    • pp.128-137
    • /
    • 2003
  • The purposes of this study were to investigate the current status of contracted hospital food services and to find out the difference in accordance with the number of beds in hospitals. Thirty six hospitals having more than 100beds in Seoul, Inchon and Kyungkido were the subjects of this study. Data was collected through surveys. The survey was conducted during March and April in 2002. The Questionnaires were mailed to the 36 directors of dietetic departments of the hospitals and 36 managers of contracting patient food services. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis and t-test. The results of the study are summerized as follows; Ⅰ. Hospital perspective : The range covered by contract food service was 63.3% and 36.7% in hospital food services, and medical nutrition services. The patient and employee food services were in 83.3%, and patient food services were in 6.7%. The methods selecting contractors are general, limited, selected and competitive biddings, and private contracts. The responsibility for supervision of contract food services was the dietetic department (51.7%) in most cases. Hospitals having personnel responsible for contracting affairs were in 75.9% of the cases and 24.1% did not have personnel. The biggest reason for contracting was facilitation of personnel management. The most important criteria on selecting food services contractors was the professionality of the contractor. Ⅱ. Contractor's perspective : The cost per meal in the year 2001 was composed of 1,905 won for food cost, 1,081 won for labor cost, 222 won for expenses, 114 won for VAT, 14 won for rent and 146 won for miscellaneous or controllable expense, representing 109 won loss per meal. The profit-and-loss contract cost is higher than the fee-contract cost. The ratios of food cost, labor cost and expenses are higher and the ratios of miscellaneous or controllable expense, VAT, rent and profit are lower in hospitals with more than 400 beds compared with those less than 400 beds. However, no significant differences are present between these two groups of hospitals. The actual contract period was 2.2 years upon initial contract and 1.2 years upon renewal. The initial investment cost was 53 million won and the cost of renovation and repair was 8.5 million won. Significant differences were present between two groups of hospitals. The conditions of employment and number of personnel hired by contractors for contract patient food services were significantly different according to the number of beds.

  • PDF

CycleGAN을 활용한 항공영상 학습 데이터 셋 보완 기법에 관한 연구 (A Study on the Complementary Method of Aerial Image Learning Dataset Using Cycle Generative Adversarial Network)

  • 최형욱;이승현;김형훈;서용철
    • 한국측량학회지
    • /
    • 제38권6호
    • /
    • pp.499-509
    • /
    • 2020
  • 본 연구에서는 최근 영상판독 분야에서 활발히 연구되고, 활용성이 발전하고 있는 인공지능 기반 객체분류 학습 데이터 구축에 관한 내용을 다룬다. 영상판독분야에서 인공지능을 활용하여 정확도 높은 객체를 인식, 추출하기 위해서는 알고리즘에 적용할 많은 양의 학습데이터가 필수적으로 요구된다. 하지만, 현재 공동활용 가능한 데이터 셋이 부족할 뿐만 아니라 데이터 생성을 위해서는 많은 시간과 인력 및 고비용을 필요로 하는 것이 현실이다. 따라서 본 연구에서는 소량의 초기 항공영상 학습데이터를 GAN (Generative Adversarial Network) 기반의 생성기 신경망을 활용하여 오버샘플 영상 학습데이터를 구축하고, 품질을 평가함으로써 추가적 학습 데이터 셋으로 활용하기 위한 실험을 진행하였다. GAN을 이용하여 오버샘플 학습데이터를 생성하는 기법은 딥러닝 성능에 매우 중요한 영향을 미치는 학습데이터의 양을 획기적으로 보완할 수 있으므로 초기 데이터가 부족한 경우에 효과적으로 활용될 수 있을 것으로 기대한다.

건설공사의 진도율 산정 방법에 관한 연구 (A study on progress measurement method of a construction project)

  • 박세정;김수용
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2003년도 학술대회지
    • /
    • pp.450-453
    • /
    • 2003
  • 건선 사업에 일어서 초기 계획과 기성의 주기적이고 반복적인 비교 검토는 매우 중요하다. 이를 위해서는 정확한 현장 실적자료가 제공되어야하고, 작업량을 객관적으로 계량화하는 기준 및 진행상황을 정확히 반영한 진도율 산정이 필요하다. 이러한 진도율 산정을 위해서는 전체 사업이 명확한 작업범위를 갖는 단위작업으로 분할되어, 각 단위 작업에 필요한 정보가 할당되어야 한다. 국내 건설 사업에서와 같이 내역중심의 사업관리가 이루어지고 있는 상황하에서는 각 단위작업의 물량, 공사비 둥을 포함한 비용 정보 뿐만 아니라 일정 정보를 반영한 진도율 산정 방법이 필수적이며, 본 연구에서는 두 가지 정보에 의한 가중 진도율 산정방법을 제시하고자 한다.

  • PDF

중소기업을 위한 6시그마 모형 및 사례 연구 (A Six Sigma Model for Small and Medium SizedCompanies and Case Studies)

  • 황영제;권혁무;홍성훈;이민구
    • 대한산업공학회지
    • /
    • 제32권4호
    • /
    • pp.291-297
    • /
    • 2006
  • Since the six sigma strategy was first introduced to Korean enterprises in 1997, it has been taken as an important business strategy to strengthen the competitiveness of major Korean companies under the global competitive environment. These major companies also demand their suppliers to implement six sigma. But small and medium sized companies have several barriers to overcome for successful implementation of six sigma. First, the financial status is not so sound to support initial expenses for launching six sigma. Second, physical and human resources are not sufficient for driving six sigma. And finally, the infrastructure is not well established to manage and support the six sigma program. In this paper, we suggest a method to overcome these barriers and propose a model for establishing six sigma in a small and medium sized company. We also provide some practical case studies.

공공사업 예정공사비에 대한 실증적 접근 (An Empirical Approach Study on Construction Cost Estimation in Public Work Projects)

  • 유창규;송정규;이윤선;김재준
    • 한국건축시공학회지
    • /
    • 제9권1호
    • /
    • pp.65-73
    • /
    • 2009
  • Looking at current construction costs estimations of publicly declared public works, there are many instances where estimation criteria are ambiguous and doesn't imply the reality. Up to date, estimation criteria for calculating construction cost estimations are simply by unit area multiplication and stochastic construction cost estimation. However, possibility of making errors are high due to using uniform data that excludes each public work's specifications and environmental conditions. Further, on the aspect of cost management, there is certain limitation in the efficiency of cost management in order-placing stage and commencing-work stage; while efficient cost management and reduction of expenses are highly possible during initial stages of the project. In this respect, the paper adopts positive approach with regards to construction cost estimations of public works and draws common elements from calculation tables of the construction cost estimations from 3 completed domestic construction works; after which, the paper analyzes whether business exposition, construction guide and publicly-declared estimated construction costs that the orderer issued are calculated economically and properly; deducing problems in the process, the paper seeks to recommend rational calculation method on this.

중소기업의 ASP를 기반으로 한 ERP 시스템 도입에 관한 연구 (A Study on the Implementation of ERP System through ASP in the Small-to-Medium Enterprises)

  • 임병하
    • 통상정보연구
    • /
    • 제7권1호
    • /
    • pp.95-117
    • /
    • 2005
  • The purpose of this study is to provide a conceptual understanding of ASP service for ERP implementation in small-to-medium enterprises under the current market situation in which the significance of information systems was standing out to respond to the rapid changes of managerial environment caused by the spread of Internet. In addition, it was to extract practical causes of introduction of ERP through ASP services by analyzing the causes and benefits considered by small-to-medium enterprises which use it. This study confirms that using ASP is better, faster and cheaper. Therefore, it is inevitable. The enterprises can reduce many risks of in-House ERP system such as excessive initial investment and operational expenses, lengthened constructional time, and the possibility of failure while achieving the benefit of ERP solution. However, there are many considerations which the enterprise carefully take into in order to implement the systems successfully such as selecting the system which is right for the enterprise's environment by setting the goal of implementing the system clearly, reducing the construction time by minimizing the customizing of the system, including the core people who knows the business process well, enough education before and after the implementation, and considering many aspect of ASP service provider. Also, the service provider should develop new way to provide customized service with cheap price while guaranteeing the reliability and supporting the customer's needs actively.

  • PDF

전기로 산화 슬래그 잔골재 치환율 변화가 석회암 기반 초고강도 모르타르의 기초적 특성에 미치는 영향 (Influence of Various Replacement Ratio of Electric Arc Furnace Fine Aggregate on Fundamental Properties of Limestone Based High Strength Mortar)

  • 문병룡;송원루;이제현;김민상;한인덕;한민철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2016년도 춘계 학술논문 발표대회
    • /
    • pp.45-46
    • /
    • 2016
  • As the demand for super tall buildings is currently increased in domestic and foreign countries, some kinds of ultra-high strength concretes are being developed actively. Since the cross section of concrete becomes smaller thanks to such kinds of ultra-high strength concretes, the concrete structures can be much bigger, more gigantic and much ultra-high. And as another benefit which is generated thanks to the enhancement of the durability performance, the maintenance expenses are also saved. However, since low W/B ultra-high concrete has a high possibility that many cracks can occur in the initial period due to the self-shrinkage caused by the self-desiccation as one of the blending characteristics, the problem becomes bigger by influencing the safety of a structure. Therefore, in this study, it is intended to analyze the effects of substituting some limestone-based ultra-high strength mortar with electric arc furnace oxidizing slag fine aggregates on the self-shrinkage of mortar.

  • PDF

계획되지 않은 재입원에 대한 위험요인분석 (A Study on the Identification of Risk Factors for unplanned Readmissions in a University Hospital)

  • 황정해;이선자
    • 한국보건간호학회지
    • /
    • 제16권1호
    • /
    • pp.201-212
    • /
    • 2002
  • This study was designed to identify the risk factors of unplanned readmission in a university hospital. The six-month discharge information from January to June, 2000 in a tertiary university hospital was used as a source of data through the medical record and hospital information system. To increase the effect of comparison. the data were collected by sampling 192 couples (384 patients) of unplanned readmission group through the matching by its disease groups, sex, and age. The accuracy of prediction for unplanned readmission was analyzed by constructing the predicted model of unplanned readmission through the logistic regression. The study results are as follows. The conditional logistic regression analysis was performed with nine variables at the significance level 0.05 through univariate analysis including residence, days after discharge, initial admission route, previous admission, transfer to special care unite, hospital stay days, medical care expenses, special cares, and laboratory and imaging services. As a result, the closer the patients live in Seoul and Gyeong-in area (Odds ratio=2.529, p=0.003), the shorter the days after discharge was (Odds ratio=0.600, p=0.000), and the more frequent admission rate was (Odds ratio=2.317, p=0.004), the more unplanned readmission was resulted. Also, the accuracy of prediction for data classification of this regression model showed $70.3\%$(032+83/306).

  • PDF

우리나라 호텔기업의 공항 컨세션 계약과 중재판정 사례연구 (A Case Study on Airport Concession Contract of Korean Hotels and Arbitration Award)

  • 김기홍;변준영
    • 한국중재학회지:중재연구
    • /
    • 제14권1호
    • /
    • pp.245-272
    • /
    • 2004
  • This study is focused on the cases that Korean hotels stepped into international airports, public facilities, and successfully solved the contract related disputes by using arbitration in accordance with arbitration law. This case study on arbitration derives the hotel management strategy points as follow: 1. It must be a good chance for a famed hotel to step into international airports that have big publication effect. The feasibility study focused on marketing feasibility rather than finance feasibility may, however, not be good. 2. Written contract is required in entering into a contract with government organizations. However, oral contract still exists. 3. If the contract is made to always pay the higher amount between annual minimal guarantee and sales rate in expenses of store using charge, such contract shall cause very hard sales environment from the initial stage of the contract. 4. The airports have made optional contracts for national service. Such optional contracts are, however, not free from public criticism. 5. This case study is the first case study on arbitration applied to hotels. This study shall be, therefore, frequently referred to in setting a management strategy of hotels that want to run restaurants in another facility outside themselves.

  • PDF

일반공조 시스템 대비 축열조와 연동된 수직밀폐형 지열히트펌프의 냉난방 에너지 성능 및 경제성 분석 (Cooling and Heating Energy Performance and Cost Analysis of Vertical Closed-loop Geothermal Heat Pump Coupled with Heat Storage Tank Compared to Conventional HVAC System)

  • 김민지;도성록;최종민;이광호
    • 대한건축학회논문집:구조계
    • /
    • 제34권11호
    • /
    • pp.81-87
    • /
    • 2018
  • Among various types of geothermal heat pump systems, Vertical Closed-Loop Geothermal Heat Pump (VGSHP) has received increasing attention due to a variety of advantages such as the potential to be installed in a relatively small space and improved energy efficiency. In this research, the performance of VGSHP system coupled with heat storage tank was evaluated, by analyzing operational behavior of heat storage tank, the variations of heat pump energy performance due to the connection with heat storage tank, part load ratios characteristics of heat pump and the corresponding energy cost, compared to chiller and boiler based conventional system. The results of this study showed that the VGSHP system coupled with heat storage tank showed an energy saving effect of about 18% for cooling and about 73% for heating, and annual heating/cooling energy cost reduction of 43,000,000 KRW ($ 39,000), compared to the conventional air conditioning system. In addition, after considering both energy cost and initial investment cost including equipment, installation and auxiliary device expenses, payback period of approximately 11.8 years was required.