DEVELOPMENT OF A FRONT END PLANNING TOOL FOR SUSTAINABILITY

  • Sang-Hoon Lee;Spencer Howard;Lingguang Song;Kyungrai Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.506-513
    • /
    • 2009
  • The Construction Industry Institute (CII) developed the Project Definition Rating Index (PDRI), as a part of their Front End Planning best practices, which helps project managers assess and measure project scope definition risk elements. U.S. Green Building Council are seeing the benefits of sustainable building and Leadership in Energy and Environmental Design certification by positively impacting life cycle costs, building marketability, and organizational productivity. However, there have been no efforts to integrate these two planning tools in construction industry. By applying a supplemental tool which combines the PDRI with the LEED rating system, construction industry can develop and implement a tailored instrument that leads to total project success in sustainability. The objective of this research is to assemble a new front end planning mechanism for green buildings by incorporating the current PDRI and LEED systems.

  • PDF

STRATEGIC ALLIANCE IMPLEMENTATION STATUS AND IMPACT ON PROJECT PERFORMANCE

  • Bon-Gang Hwang;Young-Ki Huh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.212-217
    • /
    • 2009
  • Strategic alliance is a proactive management process that integrates and optimizes value-added services of each party to best achieve business objectives of all parties within the relationship. Under the current competitive global environment, strategic alliance can produce a "Win-Win" situation and thus change paradigm that has resided in the construction industry. While many studies revealed the significance of alliance relationship in the industry, its impact on project performance has rarely been analyzed. Using the data obtained from 661 construction projects in the Construction Industry Institute database (359 projects from 38 owners and 302 projects from 29 contractors), this study first diagnoses the implementation status of strategic alliance at both project and company levels. Then, its impact on project performance is quantified and discussed. The descriptive analysis performed in this study revealed that an average of 79% of owner companies and 69% of contractor companies have ever implemented strategic alliance into at least one of their projects. However, both owner and contractor companies did not always use the strategy for all or their projects. Only 33% and 30% of projects reported by owners and contractors have been completed under alliance relationship, respectively. Analyzing the alliance impact on project performance, this study also establishes that strategic alliance positively affects project performance of both owners and contractors while owners should consider and control the level of its use for their projects. Recognizing and understanding the benefits from strategic alliance will be a starting point to produce mutual success among project participants, ultimately allowing the construction industry to go forward to a sustainable industry that transfers success from one project to the other.

  • PDF

Analyzing the Influential Relationship between PMO and Project Performance in Construction Industry: Focusing on Moderation Effect of PM Leadership (건설산업에서 프로젝트관리오피스(PMO)와 프로젝트성과의 영향관계 분석: PM리더십 조절효과 중심으로)

  • Lee, Heonchang;Park, Sohyun;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.133-145
    • /
    • 2021
  • Recently, the importance of project management has increased due to the scale and complexity of the construction projects. Therefore, this study conducted a survey on construction companies and related public institutions to verify the relationship between the role of the Project Management Office(PMO) and PM leadership for project performance. Based on this, the effect of the PMO role on the project performance was identified and the moderating effect of PM leadership was analyzed. As a result, first, the role of the PMO was found to have an influential on the project performance. Second, the PM leadership was verified to has a moderating effect in the relationship between the PMO role and the project performance. The purpose of this study is to analyze the influential of the role of PMO on project performance in the construction industry to suggest the necessity of PMO in the construction industry and the need to adopt PMO in large-scale construction projects and analyze the moderating effect of PM leadership on project performance.

QUANTITATIVE ANALYSIS ON PROJECT PERFORMANCE ANALYSIS AND DELIVERY METHODS

  • Seta Ohanesian;Jin-Lee Kim;Tang-Hung Nguyen;Ok-Kyue Kim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.332-337
    • /
    • 2013
  • Various project delivery methods have been utilized by owners over the years to maximize project performance. The design-build delivery method is being increasingly used due to the advantages it can offer to an engineering construction industry. Numerous studies have advocated the use of design/build over the traditional design/bid/build delivery approach. This study represents comprehensive analysis of 40 projects from the construction industry and shows that design/build method may not provide all the benefits to project performance. This study found timesaving was a definitive advantage of design/build project delivery, but the positive effects of cost changes was not convincing. Based on the results of the study, the project management expertise and experience of the contractor may have a greater impact on project performance outcomes than focusing on project delivery strategy only.

  • PDF

Examining the PMIS Impacts on the Project Performance, User Satisfaction and Reuse Intention among the Project based Industries (프로젝트 성과, 사용자 만족도 및 재사용의도에 미치는 PMIS의 산업별 영향 비교)

  • Park, So-Hyun;Lee, Ayeon;Kim, Seung-Chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.44 no.3
    • /
    • pp.276-287
    • /
    • 2021
  • Project Management Information System (PMIS) is a special purpose information system that is created to provide useful information for project managers and participants to make effective and efficient decision making during projects. The use of PMIS is increasing in project based industries such as construction, defense, manufacturing, software development, telecommunication, etc. It is generally known that PMIS helps to improve the quality of decision making in project management, and consequently improves the project management performance. However, it is unclear what are the difference of PMIS impacts between industries, and still need to be studied further. The purpose of this study is to compare the impact of PMIS on project management performance between industries. We assume that the effects of PMIS will be different depending on the industry types. Five hypotheses are established and tested by using statistical methods. Data were collected by using a survey questionnaire from those people who had experience of using PMIS in various project related industries such as construction, defense, manufacturing, software development and telecommunication. The survey questionnaire consists of 5 point scale items and were distributed through e-mails and google drive network. A total of 181 responses were collected, and 137 were used for analysis after excluding those responses with missing items. Statistical techniques such as factor analysis and multiple regression are used to analyze the data. Summarizing the results, it is found that the impacts of PMIS quality on the PM performance are different depending on the industry types where PMIS is used. System quality seems to be more important for improving the PM performance in construction industry while information quality seems more important for manufacturing industry. As for the ICT and R&D industries, PMIS seems to have relatively lesser impact compared to construction and manufacturing industries.

Improving the Contractor-subcontractor Relationship Through Partnering on Construction Projects in Zambia

  • Mudzvokorwa, Tafadzwa;Mwiya, Balimu;Mwanaumo, Erastus M.
    • Journal of Construction Engineering and Project Management
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2020
  • With the increased dependence on subcontracting in the construction industry, the operational relationship between main contractors and subcontractor plays an imperative role in successful project delivery. Consequently, improving this relationship increases the probability of project success and enhancing project performance. A wide range of research has confirmed that partnering improves the main contractor-subcontractor relationship. Though the positive impact of partnering on project performance is supported by a plethora of evidence, the guiding theory on practical partnering process steps is limited. The study aimed at improving subcontracting in the construction industry through a partnering process relevant to Zambia guided by factors obtained from industry expects. Questionnaire surveys and Semi-structured interview were adopted to investigate the perception of construction industry professionals and academics towards the main contractor-subcontractor relationship along with improvement factors. The findings showed that the relationship between main contractors and subcontractors on most projects in Zambia is unsatisfactory therefore justifying attention. Top factors that can enhance the main contractor-subcontractor relationship were identified. From the factors deduced and guidelines on partnering best practices, a project partnering model was developed.

SELECTING OPTIMUM MANAGEMENT PRACTICES IN PRE-CONSTRUCTION PHASE CONSIDERING PROJECT CHARACTERISTICS

  • Hee-Sung Cha;Ki-Hyun Kim;Young-Jin Ko
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.609-613
    • /
    • 2011
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the difficulties of managing construction project in the construction industry. This research classifies and applies the potential improvement made by the construction practitioners. In order to apply influential factors for success on the construction project, the research identifies the relationship between the factors and performance management practices. In addition, in order to predict the results reflecting the project characteristics which are un-improvable by the construction managers in the initial stage of construction, the effect of project characteristics to the identified management practices have been drawn by performance area. Finally, in order to improve the predicted performance, this research provides a framework in setting valid best practices according to the performance areas through a statistical analysis between the best practices and project characteristics through the industry survey.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

TOWARDS A RELATIONAL CONTRACTING FRAMEWORK IN THE AUSTRALIAN CONSTRUCTION INDUSTRY: AN INITIAL FRAMEWORK

  • Melissa Chan;Bambang Trigunarsyah;Vaughan Coffey
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.117-123
    • /
    • 2011
  • The Australian construction industry is characterized as being a competitive and risky business environment due to lack of cooperation, insufficient trust, ineffective communication and adversarial relationships which are likely lead to poor project performance. Relational contracting (RC) is advocated by literature as an innovative approach to improve the procurement process in the construction industry. Various studies have collectively added to the current knowledge of known RC norms, but there seem to be little effort on investigating the determinants of RC and its impact on project outcomes. In such circumstances, there is lack of evidence and explanation on the manner on how these issues lead to different performance. Simultaneously, the New Engineering Contract (NEC) that embraced the concept of RC is seen as a modern way of contracting and also considered as one of the best approaches to the perennial problem of improving adversarial relationships within the industry. The reality of practice of RC in Australia is investigated through the lens of the NEC. A synthesis of literature views on the concept, processes and tools of RC is first conducted to develop the framework of RC. A case study approach is proposed for an in-depth analysis to explore the critical issues addressed by RC in relation to project performance. Understanding the realities of RC will assist stakeholders in the construction industry with their investment in RC.

  • PDF

Factors Affecting the Success of Construction Projects in Khyber Pakhtunkhwa, Pakistan

  • Musarat, M. Ali;Ahad, M. Zeeshan
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.1-6
    • /
    • 2016
  • Construction industry ranks as the largest industry and imparts a significant part in developing and achieving the aims of society. Due to the involvement of larger number of stakeholders, construction industry is complex in nature. The current study is designed to identify and evaluate the factors affecting the success of construction projects in Khyber Pakhtunkhwa (KP), Pakistan. To carry out the study, a questionnaire was developed in term of interview pilot study. The data from the questionnaire survey was analyzed through SPSS software in five groups to accumulate authenticity of 44 factors. Later on the ranking was done by relative importance index (RII). According to the outcome of the research, "Project Group" stood highest among the five groups with factor of "project size" at the top rank while "Contractor Group" stood lowest with the factor of "client size" at bottom rank. From the study it is concluded that the Project Group is identified as a crucial blockade in success of construction projects. By giving pivotal attention to project group, the projects could be successfully attained from factors of project size, materials and equipment, funds and resources and project planning. To focus on the factors of project group, trust of the province people could be restored in construction of projects.