• Title/Summary/Keyword: incremental launching method

Search Result 24, Processing Time 0.021 seconds

Simplified Analysis Formula for the Interaction of the Launching Nose and the Superstructure of ILM Bridge (압출추진코와 ILM 교량 상부구조 상호작용 해석식의 단순화)

  • Lee, Hwan-Woo;Jang, Jae-Youp
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.25 no.3
    • /
    • pp.245-258
    • /
    • 2012
  • ILM(incremental launching method) is a way of construction, installing a girder producing spot behind the abutment, making the bridge girder infilled with concrete continuously and launching with using by jack. The superstructure of the bridge constructed by this method is temporarily located on the center of the span and the supporting points under construction. Therefore, the sections are structurally undergone maximum positive moment, maximum negative moment, and maximum shear force arising from self weight. On the other hand, launching nose is attached to the front of the girder to decrease the cantilever effect. The magnitude of this temporary stress creating on the upper section is dependent upon the launching nose's characteristics. This study has proposed an analysis formula simplified on the assumption that the launching nose section is a quasi-equivalent section(rigid; equivalent section, weight; tapered section) in order to ensure the accuracy of the analysis formula and improve its usage with reference to the interaction between the launching nose and the upper section; and a prismatic analysis formula modified by displacing a diaphragm's weight by a concentrated load in order to improve the accuracy of the existing analysis formula that assumes the launching nose section as the equivalent section. To judge the accuracy and usage of two analysis formulas proposed, we have compared and analyzed computational structural analysis programs and existing analysis formulas based on actual ILM bridge data. As a result, all of two reveal the superior accuracy and also their usage has been improved by the simplification of analysis formulas.

Design Formula for Launching Nose of ILM Bridge Considering the Interaction Behavior with Superstructure Sections (상부단면과의 상호작용을 고려한 ILM 교량용 압출추진코의 최적화 설계식)

  • Lee, Hwan-Woo;Jang, Jae-Youp
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.23 no.1
    • /
    • pp.53-60
    • /
    • 2010
  • In constructing ILM(Incremental Launching Method) bridges, a launching nose is generally used in order to absorb temporary stress occurring during launching. The sectional forces of superstructure of ILM bridges, which occurs during launching, varies significantly according to the length, weight and stiffness of the launching nose. Thus in order to guarantee the safety of section of ILM bridges, the change of stress according to interaction behavior between launching nose and superstructure should be considered. However, the span division and span length are often decided based on previous cases in practice. It makes the design sections of launching nose are similar in spite of different projects. The designer's anxiety to optimize the launching nose to affect the optimum design of superstructure is also weak. In this study, an design formular to optimize the nose is proposed by using the analysis formular of nose-deck interaction and the design level of ILM bridges constructed on 00 Expressway is examined. According to the result of this study, the proposed design formulas are expected to make a significant contribution to section design that is economically efficient and at the same time guarantees the safety of the superstructure and launching noses of ILM bridges regardless of span length.

Techniques of Optimizing the Launching Nose under Conditions of Minimizing the Launching Bending Moment (압출가설시 발생하는 휨모멘트의 최소화 조건을 통한 압출노즈의 최적설계)

  • Choi, Hang Yong;Suh, Suk Koo;Oh, Myung Seok;Oh, Sae Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.4A
    • /
    • pp.487-495
    • /
    • 2008
  • The behavior of nose-deck system during launch was examined by three dimensionless launching parameters, such as the relative flexural stiffness, the relative nose weight, and the relative nose length. The techniques of optimizing the launching nose were illustrated and equations of relationship between relative nose weight and relative nose length were derived under minimum conditions of the launching negative and positive moment. Equations of maximum positive and negative moment were suggested under the conditions. The optimum design method of the launching nose was proposed in launched continuous girder bridges. It was found that the ideal launching nose was to design that with the relative nose weight of 0.167 and the relative nose length of 0.836 to minimize absolute values of the positive and negative moment during launch.

Simplified computational methodology for analysis and studies on behaviour of incrementally launched continuous bridges

  • Sasmal, Saptarshi;Ramanjaneyulu, K.;Srinivas, V.;Gopalakrishnan, S.
    • Structural Engineering and Mechanics
    • /
    • v.17 no.2
    • /
    • pp.245-266
    • /
    • 2004
  • Incremental launching method is one of the highly competitive techniques for construction of concrete bridges. It avoids costly and time consuming form work and centralizes all construction activities in a small casting yard, thus saving in cost and time against conventional bridge construction. From the quality point of view, it eliminates the uncertainty of monolithic behaviour by allowing high repetitiveness and industrial environment. But, from analysis and design point of view, the most characteristic aspect of incrementally launched bridges is that, it has to absorb the stresses associated with the temporary supports that are gradually taken on by the deck during its launch. So, it is necessary to analyse the structure for each step of launching which is a tedious and time consuming process. Effect of support settlements or temperature variation makes the problem more complex. By using transfer matrix method, this problem can be handled efficiently with minimal computational effort. This paper gives insight into method of analysis, formulation for optimization of the structural system, effect of support settlement and temperature gradient, during construction, on the stress state of incrementally launched bridges.

Development of the Approximate Cost Estimating Model Using Statistical Inference for PSC Box Girder Bridge Constructed by the Incremental Launching Method (통계적 기법을 활용한 ILM압출공법 교량 상부공사 개략공사비 산정모델 개발 연구)

  • Kim, Sang-Bum;Cho, Ji-Hoon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.2
    • /
    • pp.781-790
    • /
    • 2013
  • This research focuses on development of the conceptual cost estimation models for I.L.M box girder bridge. The current conceptual cost estimation for public construction projects is dependent on governmental average unit price references which has been regarded as inaccurate and unreliable by many experts. Therefore, there have been strong demands for developing a better way of conceptual cost estimating methods. This research has proposed three different conceptual cost estimating method for a P.S.C. girder bridge built with the I.L.M method. Model (I) attempts to seek the proper breakdown of standard works that are accountable for more than 95 percentage in total cost and calculates the amount of standard work's materials from the standard section and volume of I.L.M box girder bridge. Model (II) utilizes a correlation analysis (coefficient over 0.6 or more) between breakdown of standard works and input data that would be considered available information in preliminary design phase. Model(III) obtains conceptual estimating through multiple-regression analysis between the breakdown of standard works and all of input data related to them. In order to validate the clustering of coverage in the preliminary design phase, the variation of I.L.M cost coverage from multiple-regression analysis[model(III)] has been investigated which result in between -3.76% and 11.79%, comparing with AACE(Association for the Advancement of Cost Engineering) which informs its variation between -5% and +15% in the design phase. The model proposed from this research are envisioned to be improved to a great distinct if reliable cost date for P.S.C. girder bridges can be continually collected with reasonable accuracies.

Design Analysis of Launching Noses by the Proposed Design Equation (최적설계 제안식을 이용한 ILM 압출추진코의 설계분석)

  • Lee, Hwan-Woo;Ahn, Tae-Wook;Jang, Jae-Youp
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2009.04a
    • /
    • pp.404-407
    • /
    • 2009
  • ILM(incremental launching method) 교량공법은 품질확보에 효과적인 프리스트레스 콘크리트 교량공법으로 인정받고 있다. 이 공법에 의해 시공되는 교량의 상부단면은 시공 중에 지간의 중앙부와 지점부에 일시적이나마 모두 위치하게 된다. 앞선 연구에서 압출 중인 ILM 교량의 상부단면에 발생하는 단면력의 변화를 간편하게 예측할 수 있는 해석식을 개발하였다. 그리고 개발된 해석식을 이용하여 매개변수들의 변화에 따른 상호작용의 영향을 분석하여 많은 대안들이 검토되는 초기 설계단계에 유용한 설계식도 제안하였다. 본 논문에서는 압출중인 ILM 교량의 상부단면에 발생하는 단면력을 효과적으로 제어위해 유도된 해석식을 이용하여 현재 국내 공용중인 ILM 교량의 설계수준을 검토하였고, 상부구조의 최적설계를 위한 방안을 제시하였다.

  • PDF

Simplified Analysis Formula for the Launching Superstructure of ILM Bridge (압출가설시 ILM교량 상부구조의 단순 해석식)

  • Moon, Seung-Il;Jang, Jae-Youp;Lee, Hwan-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2011.04a
    • /
    • pp.450-453
    • /
    • 2011
  • 압출공법(incremental launching method)은 교대 배후에 거더 제작장소를 설치하고, 콘크리트를 이어쳐서 교량거더를 제작하고, 이것을 잭(jack)으로 밀어내는 가설방법이다. 이 공법에 의해 시공되는 교량의 상부단면은 시공 중에 지간의 중앙부와 지점부에 일시적이나마 모두 위치하게 된다. 따라서 단면들은 자중에 의해 발생되는 최대 정모멘트와 최대 부모멘트, 그리고 최대 전단력을 모두 경험하게 되는 구조적 특성을 가지고 있다. 한편 거더의 캔틸레버 작용을 감소시키기 위하여 거더의 선단에 압출추진코(launching nose)를 부착시킨다. 상부단면에 발생하는 이 일시적인 응력의 크기는 압출추진코의 단면특성에 따라 달라진다. 본 논문에서는 압출추진코와 상부단면의 상호작용에 관한 해석식의 정확성을 유지하고, 활용도를 높이기 위해서 압출추진코를 유사등단면(강성;등단면, 중량;변단면)으로 가정하여 단순화된 해석식을 제안하였고, 압출추진코의 단면이 등단면으로 가정한 기존 해석식의 정확성을 향상시키기 위해서 다이아프램의 중량을 집중하중으로 치환시켜 변형된 등단면 해석식을 제안하였다. 그리고 제안된 2개의 해석식의 정확성과 활용성을 판단하기 위해 실제 ILM교량 설계자료들을 통해 전산구조해석 프로그램과, 기존 해석식들과 비교 분석 하였다.

  • PDF

Ultimate Flexural Strength Evaluation of Construction Joints in PSC Bridge Girders (PSC 교량 부재의 시공이음부의 극한 휨강도 평가)

  • 채성태;오병환;김병석;이상희
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2002.05a
    • /
    • pp.279-284
    • /
    • 2002
  • Prestressed concrete(PSC) bridge structures with a number of continuous spans has been segmentally built in many countries. These methods include incremental launching method, movable scaffolding method, full staging method and balanced cantilever method. In these segmentally constructed prestressed concrete bridges, many construction joints exist and these construction joints are weak points in PSC bridges. The prestress force can be introduced prestress force continuously through the construction joints of PSC bridge superstructure using tendon couplers. The main objective of this study is to evaluate the structural behavior and ultimate flexural strength of construction joints in PSC girder bridge members. To this end, a comprehensive experimental program has been set up and a series of full-scale tests have been performed. Ultimate flexural strength of construction joint in PSC members with tendon couplers is decreased by approximately 10% for non-coupled members.

  • PDF

Design and Safety Control in Construction Stage of Prestressed Concrete Box Girder Bridge with Corrugated Steel Web (파형강판 PSC 박스거더 교량의 설계 및 시공중 안전관리)

  • Kim, Kwang-Soo
    • Journal of the Korean Society of Safety
    • /
    • v.23 no.2
    • /
    • pp.87-97
    • /
    • 2008
  • The Ilsun Bridge is the world's longest box girder bridge(801m) with corrugated steel webs and has the widest width($21.2{\sim}30.9m$: tri-cellular cross section) among these kinds of composite girder bridges. It has fourteen spans(50m, 10 at 60m, 50m, 2 at 50.5m) where twelve spans are erected by the incremental launching method and two spans by full staging method. Special topics related to the structural safety of prestressed concrete box girder bridge with corrugated steel web in construction stage and service were reviewed. Investigations focus on the span-to-depth ratio, shear stress of corrugated steel webs and optimization of tile length of steel launching nose. The span-to-depth ratio of Ilsun bridge has been found to be well-planned while the corrugated steel web has been designed highly conservative and it has been observed that the conventional nose-deck interaction equation do not fit well with corrugated steel web bridges. As a result, detailed construction stage analysis was performed to check the stress levels and the safety of preceding design conditions. Finally, from the design review of Ilsun bridge, this study suggests optimal design issues which should be of interest in designing a prestressed concrete box girder bridge with corrugated steel webs.

Development of an Activity-Based Conceptual Cost Estimating Model for P.S.CBox Girder Bridge (대표공종 기반의 P.S.C 박스 거더교 개략공사비 산정모델 개발 -상부공사 중심으로-)

  • Cho, Ji-Hoon;Kim, Sang-Bum
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.197-201
    • /
    • 2008
  • Conceptual cost estimates for domestic highway projects have generally been conducted using governmental unit-price references. Inaccuracies in governmental unit-price data has repeatedly addressed in the Korean construction industry which often lead to poor decision making and cost management practices. Thus, needs for developing a better way of conceptual cost estimating has been widely recognized. This research is considered as the first step in developing such model using real-world cost data based on actual construction activities. The data analyzed in this paper includes 41 P.S.C (Prestressed Concrete) Box bridges which broke into 4 categories based on construction methods such as I.L.M(Incremental Launching Method), M.S.S(Movable Scaffolding System), F.S.M(Full Staging Method), and F.C.M(Free Cantilever Method). Actual design documents; including actual cost estimating documents, drawings and specifications were carefully reviewed to effectively break down cost structures for PSC girder bridges. Among more than 40 cost categories for each P.S.C girder bridge type, 7 of them were identified which accounted for more than 95% of total construction cost (ILM: 99.47%, MSS: 99.22%, FSM: 98.18%, and FCM: 98.12%). In order to validate the clustering of cost categories, the variation of each cost category has been investigated which resulted in between -1.16 % and 0.59%.

  • PDF