• Title/Summary/Keyword: in-line equipment

Search Result 1,014, Processing Time 0.027 seconds

To examine the construction plan of the lightening rod equipment for the J-booster pumping station in and around KEPCO'a high voltage distribution power line (한전 배전선로 주변에 위치한 J가압장의 피뢰설비 구축방안 검토)

  • Hong, Sung-Taek;Lee, Eun-Chun;Shin, Gang-Wook
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.293-295
    • /
    • 2003
  • KEPCO's high voltage distribution power line laid under the ground near to the J-booster pumping station that supply water for living. Lightening rod equipment does not installed at the J-booster pumping station because KEPCO's over head ground wire for protection functions as a lightening rod equipment. In this study, it is concerned whether KEPCO's over head ground wire for protect the distribution power line affect to the J-booster pumping station which is installed for reduce the damage from the direct and indirect lightening. If KEPCO's protection area does not affect to the J-pumping station, it is plan to examine the construction method of lightening rod protection angle and lightening rod equipment and to suggest the optimum protection plan using the surrounding structure based on the suitability of protection area.

  • PDF

FEG Development of MCR HVAC System for NPP (원자력발전소 주제어실 공기조화계통 기능적설비그룹 개발)

  • Hyun, Jin Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.21-25
    • /
    • 2012
  • Functional Equipment Group(FEG) of Nuclear Power Plant(NPP) is the bundling of multiple equipment subcomponents around a major equipment with a common system isolation characteristic or out-of-service consideration. The main purpose of FEG is to reduce out-of-service time to enhance maintenance effectiveness. KHNP(Korea hydro & Nuclear Power Co.) needs to develop these FEGs to successfully perform On-line Maintenance(OLM) which will be expected to institute in the future. Recently, there has been growing interest in OLM in KHNP. The aim of this paper is to suggest the way of FEG development and to build the FEG of MCR(Main Control Room) HVAC(Heat, Ventilation and Air Conditioning) system. The results of this study might be make good use of OLM and be helpful for equipment maintenance for MCR HVAC system.

Construction of Spread Spectrum Power Line Communication Equipment Using Power Line Synchronization (전원동기를 이용한 스펙트럼 확산 전원선 통신장치의 구성)

  • 이동욱;변건식;김명기
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.15 no.6
    • /
    • pp.475-484
    • /
    • 1990
  • This paper proposes a method for the implementation of a power line communication equipment using power line synchronization in a direct-sequence spread spectrum communication system. In order to implement a network using a power line as a transmission channel we have investigated the utilization of direct-sequence speread spctrum which gives such advantages as robustness against narrow-band interference and noise, and realization of multiple access. In a power line, however, complexity of synchronization makes it difficult to realize a multiple access and cost down and system simplification. The proposed technique of power line synchronization makes it possible to get cost down and system size small, and the realization of multiple communication can be achieved by the addition of address setting circuit.

  • PDF

An investigation of data transmission scheme using DSL modem (철도에서 DSL 모뎀을 사용한 데이터 전송에 관한 고찰)

  • Cho B. K.;Choi G. H.;Chang S. G.
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.1446-1448
    • /
    • 2004
  • Communication line used in the rail-road have different use from subscriber line in the public telecommunication. But, when an existing communication equipment is replaced, by applying new high-speed transfer technology, we can anticipate the increase of transmission rate and decrease of waiting time according to high-speed of communication line. cost reduction of infrastructure construction and maintenance/repair according to centralization of communication line and transmission equipment. In this study, the transmission scheme of several xDSL(Digital Subscriber Line) modems were compared and analyzed. The way of applying xDSL modem to the metal cable which is used in the JR(Japan Railroad) is analyzed. In addition, the result tested in railroad communication line was reviewed.

  • PDF

Design of EUT test equipment for EMC Testing (EMC 시험을 위한 EUT 시험장비 설계)

  • Hong-Rak Kim;Youn-Jin Kim;Seong-Ho Park;Man-Hee Lee
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.23 no.4
    • /
    • pp.35-40
    • /
    • 2023
  • For the EMC test, the radiation characteristics and immunity characteristics of the EUT are measured under the condition that the EUT maintains its normal operation. For normal operation of the EUT, it is necessary to operate the EUT and monitor its status through separate equipment outside the anechoic chamber. External equipment operates and monitors the EUT through various communications such as 1553B communication, RS-485 communication, and Ethernet communication. At this time, external equipment can transmit noise through the communication line. This noise is transmitted to the LISN through the connected power cable and measured. It is also radiated through the connection terminal to the LISN. In this case, the communication line is the power line It should be designed so that noise is not transmitted through electromagnetic isolation as much as possible. In addition, noise from external equipment must be suppressed as much as possible from entering the chamber through the communication line. In this paper, external EUT test equipment applied for EMC test It explains the considerations in the design and manufacture of the design and explains the satisfaction of the design through tests including CE and RE.

On-line and Off-line Partial Discharge Monitoring System with HVAC Testing (HVAC에 의한 On-line, Off-line PD 모니터링)

  • Choi, Yong-Sung;Lee, Kyung-Sup
    • Proceedings of the Korean Institute of Electrical and Electronic Material Engineers Conference
    • /
    • 2008.04c
    • /
    • pp.111-114
    • /
    • 2008
  • The paper considers the relation between on-line monitoring and diagnostics on the one hand and high-voltage (HV) withstand and partial discharge (PD) on-site testing on the other. HV testing supplies the basic data (fingerprints) for diagnostics. In case of warnings by on-line diagnostic systems, off-line withstand and PD testing delivers the best possible information about defects and enables the classification of the risk. Because alternating voltage (AC) is the most important test voltage, the AC generation on site is considered. Frequency tuned resonant (ACRF) test systems are best adapted to on-site conditions. They can be simply combined with PD measuring equipment. The available ACRF test systems and their application to electric power equipment -from cable systems to power transformers - is described.

  • PDF

Protecting of Electrical Equipment Faults Caused by Magpie (까치에 의한 전력설비 피해방지 대책)

  • Bang, J.S.;Lee, J.S.;Park, Y.K.;Lim, K.J.;Jeong, K.H.;Choi, S.C.;Sin, S.S.
    • Proceedings of the KIEE Conference
    • /
    • 1998.07e
    • /
    • pp.1663-1665
    • /
    • 1998
  • The power distribution system is 22.9 kV-y neutral point multi-ground one in our country. So, if conducting materials contacted, to the power line electrical equipment faults or stoppage of electrical power supply happened in the line. contacts are caused by magpie or its nest materials, especially, electrical power incidents by magpie from February to May, season layed egg, is high as 30% as. It is important to electrical power supplier to protect electrical power equipment caused by magpie. From now, KEPCO have tried to protect electrical power equipment faults caused by magpie using several methods, but have not acquired good results and continued to withdraw the nest. Recently, nature environment protection expand to around country and KEPCO also changed the nest withdrawal method to new pre-protection method coexisted with magpie, "Environmental Affinitive Pre-protection Counterplan". Therefore, we planned environmental affinitive pre-protection equipment, set test line. Also, after analyzed its effects during 1 year, we satisfied with results, and then expanded to other test lines and regions.

  • PDF

Development of the High-Reliability PLC-CAN Communication Module for Construction Equipment (건설 중장비용 고신뢰성 PLC-CAN 통신 모듈 개발)

  • Ku, Ja-Yl;Jang, Se-Bong
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.51 no.10
    • /
    • pp.228-234
    • /
    • 2014
  • In the case of construction equipment, internal wiring has a very complicated structure such as an electrical wiring and hydraulic equipments. Because of these complex wiring, a lot of time is spent on maintenance and equipment manufacturing. In this paper, we design and implementation of the high-reliability PLC(Power Line Communication) -CAN(Controller Area Network) communication module to reduce electrical wiring of the construction equipment.

Insulation Design of Line and Equipment in Distribution Systems in Case of the Stroke of Direct Lightning Surge (직격뢰 침입시 배전계통에서 선로 및 기기의 절연설계)

  • Jung, Chae-Kyun;Kim, Sang-Kuk;Lee, Jong-Beom;Ha, Dong-Hyuk
    • Proceedings of the KIEE Conference
    • /
    • 2003.07a
    • /
    • pp.449-451
    • /
    • 2003
  • This paper examines the insulation coordination scheme of line and equipment in distribution system when the direct lightning surge strikes. The BIL that is applied in distribution system is not properly considered the performance and operation of arresters. Because of that, the high BIL is being used at partial system. This paper variously analyse the lightning overvoltage of line and equipment with earth of overhead grounding wire and installation types of arrester. Form these result, authors examine the rationality of BIL.

  • PDF

Development of PLC Communication Line Test Simulator (PLC 통신 선로 시험 시뮬레이터 개발)

  • ku, Jayl
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.54 no.4
    • /
    • pp.122-128
    • /
    • 2017
  • In order to simplify the wiring of construction heavy equipment, researches on PLC(Power Line Communication)-CAN(Controller Area Network) communication module are actively proceeding. Even if a PLC-CAN communication module is developed, a simulator capable of judging whether the PLC-CAN communication module is operating normally is needed. In this paper, we designed and developed a simulator that can measure the status of PLC-CAN communication module. We analyzed the characteristics of the power line communication frequency band by analyzing the characteristics of the power line and compared the noise characteristics with the passenger car in order to characterize the heavy equipment noise.