• 제목/요약/키워드: illuminating power

검색결과 1,299건 처리시간 0.024초

전력설비의 전기환경장해 (Electrical Environmental Effects of Power System)

  • 신구용;;이동일;윤진열;김상범;김정부
    • 한국조명전기설비학회지:조명전기설비
    • /
    • 제13권2호
    • /
    • pp.156-156
    • /
    • 1999
  • This paper describes the characteristics and the criteria of electrical environmental effects produced from power system especially transmission line. Audible noise radio and TV interference, electric and magnetic inductions which are main items for optimal conductor selection as well as major contributors to the community complaint of electrical environmental problem, are surveyed and studied comparing with the criteria or the environmental protection regulation of domestic and foreign countries. As a result a domestic criteria of electrical environmental on power system was suggested.

TV 대기모드 효율기준 개발을 위한 대기전력 실태 분석 (Analysis of TV Standby Power for Development of Energy Efficiency Standard)

  • 김익표;노경수
    • 조명전기설비학회논문지
    • /
    • 제26권8호
    • /
    • pp.18-26
    • /
    • 2012
  • Recently, there have been suggestions that power factor should be considered to increase the efficiency of electric power supply when evaluating the performance of the electric appliances in standby mode and the related studies have been conducted to improve the efficiency standard of standby power. But, they lack the analysis of the standby power characteristics with the changes of power factor. This study is conducted to analyze the standby power characteristics of TV which is a typical home appliance and reaches a conclusion that the apparent power can be a more reasonable index which reflects the efficiency of electric power supply. It is also found that LED TVs show the best performance in standby mode. Moreover, an example to set standby power standards on TVs to be applied in the future is suggested, considering the energy efficiency policies for appliances.

최대전력 분석시뮬레이터 개발 및 조명설비 제어 시뮬레이션 (Maximum Power Analysis Simulator Development & Lighting Installation Control Simulation)

  • 장홍순;한영섭;서상현
    • 조명전기설비학회논문지
    • /
    • 제27권3호
    • /
    • pp.95-99
    • /
    • 2013
  • The maximum power analysis simulator took advantage of the facilities and power consumption reduction simulator test scenario development and testing of improvement in the scenario. As a maximum demand power controller, Maximum power analysis simulator performs control and disperasion of maximum demand power by calculating base power, load forecast, and present power which are based on signal of watt-hour meter to keep the electricity under the target. In addition, various algorithms to select appropriate control methode on each of the light installations through the peak demand power is configured to management. The simulation shows the success of control power for the specified target controlled by five sequential lighting installations.

객체지향기법을 이용한 배전계통 조류계산 (Power-Flow by using OOP in Distribution Power System)

  • 서규석;주재현
    • 조명전기설비학회논문지
    • /
    • 제24권9호
    • /
    • pp.20-25
    • /
    • 2010
  • This paper mainly proposes power flow algorithm using OOP(Object-Oriented Programming) in distribution power system. Because the most power system problems are calculated from power flow, it is an important part in power system. Recently, new power generation facilities are steadily installed in the distribution system connected with Microgrid which has been gaining popularity among the industry and utilities. This paper contributes to improve the power flow algorithm using OOP for efficient power flow according to the distribution system configuration fluctuated frequently.

해양 소수력발전용 유도발전기의 최적 무효전력 산정방식에 관한 연구 (A Study on the Optimal Reactive Power Calculation Method of Induction Generator for Marine Small Hydraulic Power)

  • 이원재;오용택
    • 조명전기설비학회논문지
    • /
    • 제27권9호
    • /
    • pp.100-107
    • /
    • 2013
  • Since the West Sea experiences a big difference in tides, the output power of the small marine hydroelectric power plant varies with the tide. When an induction generator is used here for small hydroelectric power, the reactive power capacitor should be installed at the generator main bus to compensate for the changes in power. As such, the sizing method for the power compensation of the induction generator is reviewed and an optimal method for compensation is suggested. The self-excitation minimum capacitor capacity method, which prevents high voltages, and the power factor automatic control method, which retains a power factor of greater than 90% are reviewed. The compensation effect of reactive power is confirmed through a case study.

The Development of a Programmable Single-Phase AC Power Source with a Linear Power Amplifier

  • Jeon, Jeong-Chay;Jeon, Hyun-Jae;Yoo, Jae-Geun;Son, Jae-Hyun
    • 조명전기설비학회논문지
    • /
    • 제21권9호
    • /
    • pp.39-46
    • /
    • 2007
  • This paper presents a programmable single-phase ac power source that provides a sinusoidal output voltage with an adjustable output amplitude and frequency over a wide range as well as an arbitrary waveform. The ac power source under consideration have a linear power amplifier. The desired output values can be programmed with a personal computer. The power source operates at 220[V]/60[Hz] mains and the output voltage is isolated from the input circuit. The system consists mainly of a power converter to generate and amplify the waveform signal, a controller to control the desired output signal and measure the output parameters, and a control program to set the desired output and display the values. The prototype ac power source was constructed and tested with the results demonstrating a good performance.

Improved Evaluation Method of Flicker considering Disturbances of Power System

  • Kim, Jae-Chul;Moon, Jong-Fil;Jung, Seung-Bock;Choe, Kyu-Ha
    • 조명전기설비학회논문지
    • /
    • 제22권3호
    • /
    • pp.8-14
    • /
    • 2008
  • This paper studies a more exact flicker evaluation method by detecting power quality disturbances and excluding the effects of power quality disturbances. Up to the present, power quality disturbances affect flicker evaluation index because power quality problems do not have been considered. However, flick index should represent only flicker without power quality disturbances. Thus, in this paper, we present the improved flicker evaluation method which removing the effects of power quality disturbances such as voltage sag and transient caused by fault and inverter/breaker switching. We detect voltage sag and transient using wavelet transform and remove the effects of power quality disturbances from flicker index.

Power Control and Ground Fault Simulations for a Distribution System with a Fuel Cell Power Plant

  • Hwang, Jin-Kwon;Choi, Tae-Il
    • 조명전기설비학회논문지
    • /
    • 제24권7호
    • /
    • pp.9-19
    • /
    • 2010
  • Fuel cell (FC) distributed generation (DG) is gradually becoming more attractive to mainstream electricity users as capacity improves and costs decrease. New technologies including inverters are becoming available to provide a uniform standard interconnection of DGs with an electric power system. Some of the operating conflicts and the effect of DG on power quality are addressed and investigated through simulations on a real distribution network with an FC power plant. The results of these simulations have proved load tracking capability following the real and reactive power change of the load and have shown the flow of overcurrent from an FC power plant during the ground fault of a distribution line.

상용2회선 수전방식을 적용한 무정전 수변전설비 구축방안 검토·제안연구 (Construction of Uninterruptible Power System by Reliable Incoming Dual-Power Line)

  • 최진성;이상중
    • 조명전기설비학회논문지
    • /
    • 제24권12호
    • /
    • pp.64-70
    • /
    • 2010
  • High capacity UPS and emergency generators are commonly employed at facilities where power interruption is not allowed. Nowadays, combinations of existing commercial incoming power and an emergency generator or combination of multiple generators and CTTS(Closed Transition Transfer Switch) is adopted sometimes for more reliable power supply. In this paper, application of CTTS and STS(Static Transfer Switch) to dual-power line is suggested for highly reliable uninterruptible power. By realizing such a system, construction of incoming power facilities, installation of emergency generator and large capacity UPS can be omitted, through which saving of the installation space and corresponding capital investment can be expected.