DOI QR코드

DOI QR Code

Construction of Uninterruptible Power System by Reliable Incoming Dual-Power Line

상용2회선 수전방식을 적용한 무정전 수변전설비 구축방안 검토·제안연구

  • Received : 2008.03.10
  • Accepted : 2010.09.27
  • Published : 2010.12.31

Abstract

High capacity UPS and emergency generators are commonly employed at facilities where power interruption is not allowed. Nowadays, combinations of existing commercial incoming power and an emergency generator or combination of multiple generators and CTTS(Closed Transition Transfer Switch) is adopted sometimes for more reliable power supply. In this paper, application of CTTS and STS(Static Transfer Switch) to dual-power line is suggested for highly reliable uninterruptible power. By realizing such a system, construction of incoming power facilities, installation of emergency generator and large capacity UPS can be omitted, through which saving of the installation space and corresponding capital investment can be expected.

Keywords

References

  1. 2007.9 Korea Electric Power Corporation 고장발생 통계 (’97-’06).
  2. 2003년 11월호 전력기술인 협회지 김보경,목영수,박대희,이관우, “고압및 특고압 전력케이블의 절연진단 및 유지 보수 관리방법”
  3. 월간전기 2005년 11월호 P56-P59 이재봉 “지중배전 케이블의 고장분석 및 품질향상”.
  4. 2006. Korea Electric Power Corporation 추계논문, Y.H Lee. D.H Baek. S.H Jang, “Reliability analysis for substation based on the failure rate data the facilities”.
  5. 2007.9 SD Kim, “Performance based Construction Specifications and Design Criteria”.
  6. Example of A hostpital, 154[kV] rated.
  7. Example of Guachun D Center (22.9[kV]).
  8. Example of government Daeduk 001 Center(22.9[kV]).
  9. Closed Transition switching of Essential loads – IEEE Conference Paper.
  10. “한국전력공사 홈페이지” http://www.kepco.co.kr/.