• Title/Summary/Keyword: highway survey

Search Result 196, Processing Time 0.026 seconds

DEVELOPMENT OF STATEWIDE TRUCK TRAFFIC FORECASTING METHOD BY USING LIMITED O-D SURVEY DATA (한정된 O-D조사자료를 이용한 주 전체의 트럭교통예측방법 개발)

  • 박만배
    • Proceedings of the KOR-KST Conference
    • /
    • 1995.02a
    • /
    • pp.101-113
    • /
    • 1995
  • The objective of this research is to test the feasibility of developing a statewide truck traffic forecasting methodology for Wisconsin by using Origin-Destination surveys, traffic counts, classification counts, and other data that are routinely collected by the Wisconsin Department of Transportation (WisDOT). Development of a feasible model will permit estimation of future truck traffic for every major link in the network. This will provide the basis for improved estimation of future pavement deterioration. Pavement damage rises exponentially as axle weight increases, and trucks are responsible for most of the traffic-induced damage to pavement. Consequently, forecasts of truck traffic are critical to pavement management systems. The pavement Management Decision Supporting System (PMDSS) prepared by WisDOT in May 1990 combines pavement inventory and performance data with a knowledge base consisting of rules for evaluation, problem identification and rehabilitation recommendation. Without a r.easonable truck traffic forecasting methodology, PMDSS is not able to project pavement performance trends in order to make assessment and recommendations in the future years. However, none of WisDOT's existing forecasting methodologies has been designed specifically for predicting truck movements on a statewide highway network. For this research, the Origin-Destination survey data avaiiable from WisDOT, including two stateline areas, one county, and five cities, are analyzed and the zone-to'||'&'||'not;zone truck trip tables are developed. The resulting Origin-Destination Trip Length Frequency (00 TLF) distributions by trip type are applied to the Gravity Model (GM) for comparison with comparable TLFs from the GM. The gravity model is calibrated to obtain friction factor curves for the three trip types, Internal-Internal (I-I), Internal-External (I-E), and External-External (E-E). ~oth "macro-scale" calibration and "micro-scale" calibration are performed. The comparison of the statewide GM TLF with the 00 TLF for the macro-scale calibration does not provide suitable results because the available 00 survey data do not represent an unbiased sample of statewide truck trips. For the "micro-scale" calibration, "partial" GM trip tables that correspond to the 00 survey trip tables are extracted from the full statewide GM trip table. These "partial" GM trip tables are then merged and a partial GM TLF is created. The GM friction factor curves are adjusted until the partial GM TLF matches the 00 TLF. Three friction factor curves, one for each trip type, resulting from the micro-scale calibration produce a reasonable GM truck trip model. A key methodological issue for GM. calibration involves the use of multiple friction factor curves versus a single friction factor curve for each trip type in order to estimate truck trips with reasonable accuracy. A single friction factor curve for each of the three trip types was found to reproduce the 00 TLFs from the calibration data base. Given the very limited trip generation data available for this research, additional refinement of the gravity model using multiple mction factor curves for each trip type was not warranted. In the traditional urban transportation planning studies, the zonal trip productions and attractions and region-wide OD TLFs are available. However, for this research, the information available for the development .of the GM model is limited to Ground Counts (GC) and a limited set ofOD TLFs. The GM is calibrated using the limited OD data, but the OD data are not adequate to obtain good estimates of truck trip productions and attractions .. Consequently, zonal productions and attractions are estimated using zonal population as a first approximation. Then, Selected Link based (SELINK) analyses are used to adjust the productions and attractions and possibly recalibrate the GM. The SELINK adjustment process involves identifying the origins and destinations of all truck trips that are assigned to a specified "selected link" as the result of a standard traffic assignment. A link adjustment factor is computed as the ratio of the actual volume for the link (ground count) to the total assigned volume. This link adjustment factor is then applied to all of the origin and destination zones of the trips using that "selected link". Selected link based analyses are conducted by using both 16 selected links and 32 selected links. The result of SELINK analysis by u~ing 32 selected links provides the least %RMSE in the screenline volume analysis. In addition, the stability of the GM truck estimating model is preserved by using 32 selected links with three SELINK adjustments, that is, the GM remains calibrated despite substantial changes in the input productions and attractions. The coverage of zones provided by 32 selected links is satisfactory. Increasing the number of repetitions beyond four is not reasonable because the stability of GM model in reproducing the OD TLF reaches its limits. The total volume of truck traffic captured by 32 selected links is 107% of total trip productions. But more importantly, ~ELINK adjustment factors for all of the zones can be computed. Evaluation of the travel demand model resulting from the SELINK adjustments is conducted by using screenline volume analysis, functional class and route specific volume analysis, area specific volume analysis, production and attraction analysis, and Vehicle Miles of Travel (VMT) analysis. Screenline volume analysis by using four screenlines with 28 check points are used for evaluation of the adequacy of the overall model. The total trucks crossing the screenlines are compared to the ground count totals. L V/GC ratios of 0.958 by using 32 selected links and 1.001 by using 16 selected links are obtained. The %RM:SE for the four screenlines is inversely proportional to the average ground count totals by screenline .. The magnitude of %RM:SE for the four screenlines resulting from the fourth and last GM run by using 32 and 16 selected links is 22% and 31 % respectively. These results are similar to the overall %RMSE achieved for the 32 and 16 selected links themselves of 19% and 33% respectively. This implies that the SELINICanalysis results are reasonable for all sections of the state.Functional class and route specific volume analysis is possible by using the available 154 classification count check points. The truck traffic crossing the Interstate highways (ISH) with 37 check points, the US highways (USH) with 50 check points, and the State highways (STH) with 67 check points is compared to the actual ground count totals. The magnitude of the overall link volume to ground count ratio by route does not provide any specific pattern of over or underestimate. However, the %R11SE for the ISH shows the least value while that for the STH shows the largest value. This pattern is consistent with the screenline analysis and the overall relationship between %RMSE and ground count volume groups. Area specific volume analysis provides another broad statewide measure of the performance of the overall model. The truck traffic in the North area with 26 check points, the West area with 36 check points, the East area with 29 check points, and the South area with 64 check points are compared to the actual ground count totals. The four areas show similar results. No specific patterns in the L V/GC ratio by area are found. In addition, the %RMSE is computed for each of the four areas. The %RMSEs for the North, West, East, and South areas are 92%, 49%, 27%, and 35% respectively, whereas, the average ground counts are 481, 1383, 1532, and 3154 respectively. As for the screenline and volume range analyses, the %RMSE is inversely related to average link volume. 'The SELINK adjustments of productions and attractions resulted in a very substantial reduction in the total in-state zonal productions and attractions. The initial in-state zonal trip generation model can now be revised with a new trip production's trip rate (total adjusted productions/total population) and a new trip attraction's trip rate. Revised zonal production and attraction adjustment factors can then be developed that only reflect the impact of the SELINK adjustments that cause mcreases or , decreases from the revised zonal estimate of productions and attractions. Analysis of the revised production adjustment factors is conducted by plotting the factors on the state map. The east area of the state including the counties of Brown, Outagamie, Shawano, Wmnebago, Fond du Lac, Marathon shows comparatively large values of the revised adjustment factors. Overall, both small and large values of the revised adjustment factors are scattered around Wisconsin. This suggests that more independent variables beyond just 226; population are needed for the development of the heavy truck trip generation model. More independent variables including zonal employment data (office employees and manufacturing employees) by industry type, zonal private trucks 226; owned and zonal income data which are not available currently should be considered. A plot of frequency distribution of the in-state zones as a function of the revised production and attraction adjustment factors shows the overall " adjustment resulting from the SELINK analysis process. Overall, the revised SELINK adjustments show that the productions for many zones are reduced by, a factor of 0.5 to 0.8 while the productions for ~ relatively few zones are increased by factors from 1.1 to 4 with most of the factors in the 3.0 range. No obvious explanation for the frequency distribution could be found. The revised SELINK adjustments overall appear to be reasonable. The heavy truck VMT analysis is conducted by comparing the 1990 heavy truck VMT that is forecasted by the GM truck forecasting model, 2.975 billions, with the WisDOT computed data. This gives an estimate that is 18.3% less than the WisDOT computation of 3.642 billions of VMT. The WisDOT estimates are based on the sampling the link volumes for USH, 8TH, and CTH. This implies potential error in sampling the average link volume. The WisDOT estimate of heavy truck VMT cannot be tabulated by the three trip types, I-I, I-E ('||'&'||'pound;-I), and E-E. In contrast, the GM forecasting model shows that the proportion ofE-E VMT out of total VMT is 21.24%. In addition, tabulation of heavy truck VMT by route functional class shows that the proportion of truck traffic traversing the freeways and expressways is 76.5%. Only 14.1% of total freeway truck traffic is I-I trips, while 80% of total collector truck traffic is I-I trips. This implies that freeways are traversed mainly by I-E and E-E truck traffic while collectors are used mainly by I-I truck traffic. Other tabulations such as average heavy truck speed by trip type, average travel distance by trip type and the VMT distribution by trip type, route functional class and travel speed are useful information for highway planners to understand the characteristics of statewide heavy truck trip patternS. Heavy truck volumes for the target year 2010 are forecasted by using the GM truck forecasting model. Four scenarios are used. Fo~ better forecasting, ground count- based segment adjustment factors are developed and applied. ISH 90 '||'&'||' 94 and USH 41 are used as example routes. The forecasting results by using the ground count-based segment adjustment factors are satisfactory for long range planning purposes, but additional ground counts would be useful for USH 41. Sensitivity analysis provides estimates of the impacts of the alternative growth rates including information about changes in the trip types using key routes. The network'||'&'||'not;based GMcan easily model scenarios with different rates of growth in rural versus . . urban areas, small versus large cities, and in-state zones versus external stations. cities, and in-state zones versus external stations.

  • PDF

Prediction of Concrete Temperature and Its Effects on Continuously Reinforcement Concrete Pavement Behavior at Early Ages (초기재령에서 연속철근콘크리트포장 거동에 콘크리트 온도의 영향과 예측)

  • Kim Dong-Ho;Choi Seong-Cheol;Won Moon-Cheol
    • International Journal of Highway Engineering
    • /
    • v.8 no.2 s.28
    • /
    • pp.55-62
    • /
    • 2006
  • Transverse cracks in continuously reinforced concrete pavement (CRCP) occur at early ages due to temperature and moisture variations. The width and spacing of transverse cracks have a significant effect on pavement performance such as load transfer efficiency and punchout development. Also, crack widths in CRCP depend on 'zero-stress temperature,' which is defined as a temperature where initial concrete stresses become zero, as well as drying shrinkage of concrete. For good long-term performance of CRCP, transverse cracks need to be kept tight. To keep the crack widths tight throughout the pavement life, zero-stress temperature must be as low as practically possible. Thus, temperature control at early ages is a key component In ensuring good CRCP performance. In this study, concrete temperatures were predicted using PavePro, a concrete temperature prediction program, for a CRCP construction project, and those values were compared with actual measured temperatures obtained from field testing. The cracks were also surveyed for 12 days after concrete placement. Findings from this study can be summarized as follows. First, the actual maximum temperatures are greater than the predicted maximum temperature in the ranges of 0.2 to 4.5$^{\circ}C$. For accurate temperature predictions, hydration properties of cementitious materials such as activation energy and adiabatic constants, should be evaluated and accurate values be obtained for use as input values. Second, within 24 hours of concrete placement, temperatures of concrete placed in the morning are higher than those placed in the afternoon, and the maximum concrete temperature occurred in the concrete placed at noon. Finally, from the 12 days of condition survey, it was noted that the rate of crack occurrence in the morning placed section was 25 percent greater than that in the afternoon placed section. Based on these findings, it is concluded that maximum concrete temperature has a significant effect on crack development, and boner concrete temperature control is needed to ensure adequate CRCP performance.

  • PDF

Experimental Study on the Determination of Slope and Height of Curbs Considering the VRUs (교통약자를 고려한 보도의 경사도와 높이 결정을 위한 실험연구)

  • Kim, Hyunjin;Lim, Joonbeom;Choe, Byongho;Oh, Cheol;Kang, Inhyeng
    • International Journal of Highway Engineering
    • /
    • v.20 no.1
    • /
    • pp.107-115
    • /
    • 2018
  • PURPOSES : As the population of the mobility handicapped, who are classified as the disabled, the elderly, pregnant women, children, etc., has increased, the voices for guaranteeing their rights have been increasing as well. Thus, the design manuals for roads and sidewalks for the mobility handicapped were developed by the local government, such as the Ministry of Land, Transport, and Tourism, in Seoul City. However, according to the 2013 survey results of the Seoul Metropolitan City, the mobility handicapped still feel uncomfortable with the sidewalks, and particularly request for the improvement of the step and slope of the sidewalk curb. Therefore, in this study, we conducted an empirical experimental study to determine the slope of the sidewalk curb and height of the steps considering the mobility handicapped and analyzed whether there is a statistically significant difference. METHODS : The methodology of this study is an empirical experimental one. In the study, five non-disabled people, 10 wheelchair users, and 10 eye patch and stick users walked about 2-3 min on the sidewalk plates of the sloped type (0%, 5%, 6.3%, 8.3%) and stepped type (0 cm, 1 cm, 3 cm, 6 cm), and their human physiological responses, such as the skin temperature, volume of perspiration on forehead and chest, and heart rate, were measured and recorded. After combining the data, we conducted a nonparametric test, ANOVA, or t-test to determine whether there was a statistically significant difference according to each slope and step type. RESULTS : It was found that for the non-disabled, there was no significant difference in human physiological responses according to the slope and steps of the sidewalk. It can be said that the non-disabled do not feel much physiological discomfort while walking. In the case of the sloped sidewalk plate, the heart rate of the wheel chair users increased when the slope was 6.3%. In the case of the eye patch and stick users, the volume of perspiration on the chest increased at a slope of 5.0%. In general, it is judged that a sidewalk with a slope that is less than 5% does not cause a change in the physiological response. In the case of a stepped sidewalk plate, when 0 cm, 1 cm, and 3 cm were compared for wheelchair users, the amount of forehead perspiration increased from 1 cm. Meanwhile, in the case of the eye patch and stick users, when 0 cm and 6 cm were compared, the amount of perspiration on the forehead and chest as well as the heart rate all increased at 6 cm. Taken together, in the case of wheelchair users, a difference was shown when the height of the step of the sidewalk plate was 1 cm, suggesting that installing it at 0 cm does not cause any physiological discomfort. Moreover, in the case of the eye patch and stick users, when comparing only 0 cm and 6 cm, 0 cm was considered to be suitable, as there was a difference in physiological response at 6 cm. CONCLUSIONS : In this study, we set the human physiological responses such as chest skin temperature, amount of perspiration, and heart rate as evaluation items, and our study was considered to be a meaningful experiment that targeted wheelchair users as well as eye patch and stick users. The validity of the evaluation items was confirmed, as the results of human physiological responses were significant. As for the sidewalk design, according to the experiment result, it is considered that differential application should be implemented according to the type of mobility handicap, rather than uniformly applying a sidewalk step of 2 cm and sidewalk slope of 1/25, which are the current legal standards.

Study of Downward Speed Limit of Main Roads on Traffic Accident and Effect Analysis - In Busan Metropolitan City - (간선도로 최고속도제한 하향이 교통사고에 미치는 영향 및 효과분석 - 부산광역시를 중심으로 -)

  • Lim, Chang-Sik;Choi, Yang-Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.1
    • /
    • pp.81-90
    • /
    • 2018
  • The purpose of this study is to evaluate the effect of downward speed limit of urban arterial roads at 29 sites in Busan Metropolitan Police Agency to reduce road traffic accidents from '10 to '15. As a result of analyzing the traffic accidents occurred for 1~3 years after the decrease in the speed limit, the number of traffic accidents decreased by 3.09% and the number of injured persons decreased by 8.76%, but the number of deaths decreased by 36.73% The results of this study are as follows. The average speed reduction rate of 6.31km/h was decreased by investigating the change of the vehicle speed before and after the downward speed limit, and the change of average speed was statistically significant in most of the sections. The rate of compliance with the speed limit increased by 10.26% p, which is considered to have greatly improved overall traffic safety. A survey conducted by residents near the target area with a lower speed limit showed that 57.9% of the respondents felt the driving speed of the vehicle was lowered. However, this project was focused on vehicles with limited speed road signs and traffic safety signs, Only 25.8% of respondents said walking safety was improved. In the future, it is necessary to consider the safety of pedestrians by improving roads around roads such as road curvature and separation. In addition, there is a clear positive result in terms of decreasing the fatal accidents in the downward speed limit zone of Busan Metropolitan Subway. However, more detailed analysis is needed for the 29 accidents. Therefore, it is expected that traffic practitioners will be able to utilize it as a basis to increase the accident reduction effect by setting an appropriate speed limit based on the easy and objective grounds.

Tie Spatial Structure of Ch'ang-ts'ai-ts'un Village A Case Study on a Rural Village of Korean Immigrants in Yen-pien Area of China (중국(中國) 연변지구(延邊地區) 조선족(朝鮮族)마을의 구성(構成) 룡정시 지신향 장재촌을 대상으로)

  • Lee, Kyu Sung
    • Journal of architectural history
    • /
    • v.3 no.1
    • /
    • pp.83-99
    • /
    • 1994
  • Ch'ang-Ts'al-Ts'un is a rural Village near Lung-jing City in Yen-pien Korean Autonomous Province of China. It was formed about 100 years ago by Korean Immigrants and has been developed maintaing the characteristics of traditional Korean architecture. Therefore investigating the spatial structure of this village is a meanigful work to confirm and explore one branch of Korean architecture. This study aims at analyzing the spatial structure of the village using direct data collected from the field work and indirect data from books and maps. The field work consists of on-the-site survey of the village layout, interviews of residents, observation notes and photography. Ch'ang-Ts'ai-Ts'un is located 360-370 m high above the sea level and at the side of a long valley. A river flows in the middle of the valley and relatively flat arable land exists at the both sides of the river. The location of the village related to the surrounding river and mountains suggests that the site of the village was chosen according to Feng-Shui, Chinese and Korean traditional architectural theory. The main direction of the house layouts is South-western. The village has been growing gradually until today. Therefore it is meaningful to make the village layout before Liberation(1946 A.D.) because the characteristics of Korean architecture prevailed more in that period. The area of the previous village is limited to the west side of the creek. New houses were later added to the east of the creek, forming a 'New Village'. Previously the village was composed of 3 small villages: Up, Middle and Down. Also the main access roads connecting the village with the neighboring villages were penetrating the village transversely. Presently the main access road comes to the village longitudinally from the main highway located in front of the village. The retrospective layout shows the existence of well-formed Territory, Places and Axes, thus suggesting a coherent Micro-cosmos. The boundary of imaginery territory perceived by present residents could be defined by linking conspicous outside places sorrounding the village such as Five-mountains, Front-mountain, Shin-dong village, Standing-rock, Rear-mountain and Myong-dong village. Inside the territory there are also the important places such as Bus-stop, Memorial tower of patriots, Road-maitenance building and the village itself. And inside it 5 transverse and 1 longitudinal axes exist in the form of river, roads and mountains. The perceived spatial structure of the village formed by Places, Axes and Territory is geometrical and well-balanced and suggests this village is fit for human settlement. The administrative area of the village is about 738 ha, 27 % of which is cultivated land and the rest is mountain area. Initially the village and surrounndings were covered with natural forest But the trees have been gradually cut down for building and warning houses, resulting in the present barren and artificial landscape with bare mountains and cultivated land. At present the area of the village occupied by houses is wedge-shaped, 600 m wide and 220 m deep in its maximum. The total area of the village is $122,175m^{2}$. The area and the rate of each sub-division arc as follow. 116 house-lots $91,465m^{2}$ (74.9 %) Land for public buildings and shops $2,980m^{2}$ (2.4 %) Roads $17,106m^{2}$ (14.0 %) Creek $1,356m^{2}$ (1.1 %) Vacant spaces and others $9,268m^{2}$ (7.6 %) TOTAL $122,175m^{2}$ (100.0 %) Each lot is fenced around with vertical wooden pannels 1.5-1.8 m high and each house is located to the backside of the lot. The open space of a lot is sub-divided into three areas using the same wooden fence: Front yard, Back yard and Access area. Front and back yards are generally used for crop-cultivation, the custom of which is rare in Korea. The number of lots is 116 and the average size of area is $694.7m^{2}$. Outdoor spaces in the village such as roads, vacant spaces, front yard of the cultural hall, front yard of shops and spacse around the creek are good 'behavioral settings' frequently used by residents for play, chatting, drinking and movie-watching. The road system of the village is net-shaped, having T-junctions in intersections. The road could be graded to 4 categories according to their functions: Access roads, Inner trunk roads, Connecting roads and Culs-de-sac. The total length of the road inside the village is 3,709 m and the average width is 4.6 m. The main direction of the road in the village is NNE-SSE and ESE-WNW, crossing with right angles. Conclusively, the spatial structure of Ch'ang-Ts'ai-Ts'un village consists of various components in different dimensions and these components form a coherent structure in each dimension. Therefore the village has a proper spatial structure meaningful and appropriate for human living.

  • PDF

Mitigation of Insufficient Capacity Problems of Central Bus Stops by Controlling Effective Green Time (유효녹색시간 조정을 활용한 중앙버스정류장 용량 부족 완화 방안 연구)

  • Koo, Kyo Min;Lee, Jae Duk;Ahn, Se Young;Chang, Iljoon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.21 no.1
    • /
    • pp.35-50
    • /
    • 2022
  • After the introduction of the central bus lane system, bus traffic was prioritized. This resulted in improved trust from bus users. However, the low capacity at the central bus stop reduces traffic speed and punctuality. In addition, physical constraints are inevitable because the construction of central bus lanes and bus stops considers the city's road geometry. Therefore, this study attempted to optimize the effective green time of the traffic signal system at the entrance and exit of the central bus stop to remedy its insufficient operational capacity. The Transit Capacity and Quality of Service Manual and Korea Highway Capacity Manual were used as the analysis methodologies. The number of stop areas for central bus stops to be built was determined by excluding variable physical factors, and field survey data collected from nine randomly selected central bus stops currently installed in Seoul were used. A scenario analysis was conducted on the central bus stops with insufficient capacity by adjusting the effective green time, and the capacity of the central bus stop was set as the dependent variable. According to the results, 26.7 percent of the central bus stops with insufficient capacity can solve the problem of insufficient capacity. Therefore, the results of this study can be verified by improving the operation level, and it can be effective even if the number of central bus stops calculated by engineering is not guaranteed during the planning stage of the central bus stop. As the number of central bus stops is expected to increase further as the number of central bus stops increases, it is necessary to improve the number of central bus stops. Therefore, it is hoped that the results presented in this study will be used as basic data for the improvement plan at the operational level before introducing the physical improvement plan.