• Title/Summary/Keyword: high-speed railway system

Search Result 1,182, Processing Time 0.035 seconds

Field Measurements and Review of the Curve Squeal Noise of Urban Railways (도시철도 차량 주행시 곡선스킬소음 실험 및 고찰)

  • Kim, Jae-chul;Kim, Kwanju;Lee, Junheon;Kim, Jiyong
    • Journal of the Korean Society for Railway
    • /
    • v.20 no.2
    • /
    • pp.165-172
    • /
    • 2017
  • High frequency squeal noise can be generated when a railroad vehicle runs a sharp curved section; this noise causes environmental complaints and excessive wear on the wheel and the railroad track. In this paper, curved squeal noise experiments on a commercial railway were carried out to investigate this phenomenon. The relationship of the squeal noise pressure level, the frequency characteristics, the railway running speed, and the modal behavior of the wheel were investigated. At the same time, the lateral motion of the wheel relative to the rail was captured using a video camera; wheel movement was calculated when the noise was generated. queal noise occurred at the highest level at the inner front wheel; this phenomena is considered to be related to the lateral vibration response characteristics of the wheel. It can be seen that the magnitude of this squeal noise is not directly related to the increase in vehicle speed.

Simulation of Noise and Vibration around the Improved Turnout System (개량분기기 인근의 소음진동 시뮬레이션)

  • Eum, Ki-Young;Um, Ju-Hwan;Lee, Chin-Hyung
    • Journal of the Korea Society for Simulation
    • /
    • v.15 no.4
    • /
    • pp.119-128
    • /
    • 2006
  • A turnout system which permits trains to pass from one track to another is a combination of the switch, the crossing, lead rails which are necessary to connect the switch and the crossing, two guard rails and a switch machine for operating the switch. A turnout is the sole moving part among the railway components and has complex configuration, so the safety has always been raised an issue. In Korea, it is planned to adopt the high speed tilting train, which operates at the maximum speed of 200km/h, at conventional lines by the year of 2010. However, for the application of the tilting train to conventional lines, it is prerequisite to establish a stable turnout system allowing the tilting train to pass through it without reducing speed. Therefore, the improved turnout system for the speed-up of conventional lines has been developed and the prototype of the turnout system has been constructed. In this study, simulation of noise and vibration around the improved turnout system was performed in order to predict the generation level of noise and vibration due to passing of the tilting train through the turnout system.

  • PDF

Preliminary Field Trial of Improved Train Control System Using on-board Control (선로변 시설물 차상 제어를 위한 차상중심 열차제어시스템 예비 현장시험)

  • Park, Chul Hong;Choi, Hyeon Yeong;Baek, Jong-Hyen
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.39C no.3
    • /
    • pp.298-306
    • /
    • 2014
  • The railway signalling system for safe train operation regulates the train speed to ensure the safety distance between consecutive trains by using wayside facilities such as track circuits and interlocking systems. In addition, this signalling system controls the trackside equipment such as a railway point along the train line. This ground-equipment-based train control systems require high CAPEX and OPEX. To deal with these problems, the train control system using the on-board controller has been recently proposed and its related technologies have been widely studied. The on-board-controller-based train control system is that the on-board controller can directly control the trackside equipment on the train line. In addition, if this system is used, the wayside facilities can be simplified, and as a result, the efficient and cost-effective train control system can be realized. To this end, we have developed the prototypes of the on-board controller and wayside object control units which control the point and crossing gate and performed the integrated operation simulation in a testbed. In this paper, before the field test of the on-board-controller-based train control system, we perform the preliminary field trial including the installation test, wireless access test, interface test with other on-board devices, and normal operation test.

Evaluation of Optimal Time Between Overhaul Period of the First Driving Devices for High-Speed Railway Vehicle (고속철도차량 1차 구동장치에 대한 완전분해정비의 최적 주기 평가)

  • Jung, Jin-Tae;Kim, Chul-Su
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8700-8706
    • /
    • 2015
  • The first driving device of the power bogies for the Korean high-speed railway vehicle consists of the traction motor (TM) and the motor reduction gears unit (MRU). Although TM and MRU are the mechanically integrated structures, their time between overhauls (TBO) have two separate intervals due to different technical requirements(i.e. TBO of MRU: $1.8{\times}10^6km$, TBO of TM: $2.5{\times}10^6km$). Therefore, to reduce the unnecessary number of preventive maintenances, it is important to evaluate the optimal TBO with a viewpoint of reliability-center maintenance towards cost-effective solution. In this study, derived from the field data in maintenance, fault tree analysis and failure rate of the subsystem considering criticality of the components are evaluated respectively. To minimize the conventional total maintenance cost, the same optimal TBO of the components is derived from genetic algorithm considering target reliability and improvement factor. In this algorithm, a chromosome which comprised of each individual is the minimum preventive maintenance interval. The fitness function of the individual in generation is acquired through the formulation using an inverse number of the total maintenance cost. Whereas the lowest common multiple method produces only a four percent reduction compared to what the existing method did, the optimal TBO of them using genetic algorithm is $2.25{\times}10^6$km, which is reduced to about 14% comparing the conventional method.

Development of a Pegging Plan Program (I) (전주 위치 설계 지원 프로그램 개발 (I) - 유기적 3차원 설계 기법을 중심으로 -)

  • Lee, Ki-Won;Cho, Yong-Hyeon;Kwon, Sam-Young;Lee, Tae-Kwon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1991-1996
    • /
    • 2011
  • The detail design of overhead line can be dievided into a pegging plan and MD(Mounting Diagram) process. A program can perform a MD process was already developed and used in Honam High-Speed project. In this study, a pegging plan program which can perform mast distribution automatically is developed. The system is developed based on dot net framework 4.0 and Civil3D 2012 and used spread 4.0 component for grid UI. It can not be directly used a rail horizontal alignment and long-section profile together on drawing. Therefore using Civil3D, mathematical alignment and profile of rail can be accomplished. And this program has an advantage of user friendly operation because of close relationship between the two.

  • PDF

Estimation of track irregularity using NARX neural network (NARX 신경망을 이용한 철도 궤도틀림 추정)

  • Kim, Man-Cheol;Choi, Bai-Sung;Kim, Yu-Hee;Shin, Soob-Ong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.275-280
    • /
    • 2011
  • Due to high-speed of trains, the track deformation increases rapidly and may lead to track irregularities causing the track stability problem. To secure the track stability, the continual inspection on track irregularities is required. The paper presents a methodology for identifying track irregularity using the NARX neural network considering non-linearity in the train structural system. A simulation study has been carried out to examine the proposed method. Acceleration time history data measured at a bogie were re-sampled to every 0.25m track irregularity. In the simulation study, two sets of measured data were simulated. The second data set was obtained by a train with 10% more mass than the one for the first data set. The first set of simulated data was used to train the series-parallel mode of NARX neural network. Then, the track irregularities at the second time period are identified by using the measured acceleration data. The closeness of the identified track irregularity to the actual one is evaluated by PSD and RMSE.

  • PDF

A Study on the Fracture Cause of Dropper Wire in Catenary System for Korea High Speed Railway (고속철도 전차선로 드롭퍼 와이어 파단원인 연구)

  • Lee, Tae-Hoon;Jeon, Yong-Joo;Lee, See-Bin;Choi, Kyoung-Il;Han, Sang-Gil;Park, Young-Sik;Park, Ki-Bum
    • Proceedings of the KIEE Conference
    • /
    • 2009.07a
    • /
    • pp.1205_1206
    • /
    • 2009
  • 고속철도 전차선로에 설치된 드롭퍼의 와이어가 파단되어 원인을 분석하기 위해 드롭퍼의 구간별/설치위치별/지역별 단선현황 분석, 파단면 SEM(Scanning Electron Microscope) 분석, 미세조직 분석 및 드롭퍼에 작용하는 정적하중을 계산하였다. 또한 고속철도 전차선로에서 드롭퍼의 정적 및 동적하중 측정과 분석을 통하여 드롭퍼의 피로하중 특성을 확인하였고, 지지점의 압상량을 측정 및 분석하였다.

  • PDF

Dynamic Analysis of a Moving Vehicle on Flexible beam Structure (II) : Application

  • Park, Tae-Won;Park, Chan-Jong
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.3 no.4
    • /
    • pp.64-71
    • /
    • 2002
  • Recently, mechanical systems such as a high-speed vehicles and railway trains moving on flexible beam structures have become a very important issue to consider. Using the general approach proposed in the first part of this paper, it is possible to predict motion of the constrained mechanical system and the elastic structure, with various kinds of foundation supporting conditions. Combined differential-algebraic equation of motion derived from both multibody dynamics theory and finite element method can be analyzed numerically using a generalized coordinate partitioning algorithm. To verify the validity of this approach, results from the simply supported elastic beam subjected to a moving load are compared with the exact solution from a reference. Finally, parametric study is conducted for a moving vehicle model on a simply supported 3-span bridge.

The impact of TGV on the mobility (TGV의 개통효과 : 유동성 변화를 중심으로)

  • Lee Kyung-Chul
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.375-379
    • /
    • 2004
  • The purpose of this study is to analyze the evolution of mobility after the commercial opening of french TGV through an examination on the precedent studies. The result of this study is as follows: Firstly, the TGV is competitive against the airplanes and automobiles within the 2 or 3 hours' service area, especially in the business trip markets. But in the recreational trips over this service area, 3 or 4 hours, the TGV remains as an important mode of transportation. Secondly, in a range within approximately 200 km, 1 hour by TGV, the french high speed train is not competitive against the automobiles by the lack of flexibility and commodity which are normally providing by the automobiles. This study shows the importance of permanent monitoring system on the KTX travellers' behavior to strengthen the market share of KTX.

  • PDF

Tribological Approach on the Stress Distribution of Wheel-Rail Contact (차륜과 레일 사이의 접촉응력에 관한 트라이볼로지적 해석)

  • 황재용;김기환;김청균
    • Proceedings of the Korean Society of Tribologists and Lubrication Engineers Conference
    • /
    • 1997.04a
    • /
    • pp.210-217
    • /
    • 1997
  • This paper presents the numerical results of the stress analysis of wheel-rail contact problems. Two models which have straight and tapered(1:20) contact geometries between the wheelset and rail are analyzed using the finite element approach. From the simulation results we found that the tapered geometry of wheel-rail contact base line showed very stable contact stress distributions for a whole contact position between the wheel and rail in a curved rail section. The FEM computed results may present an optimized geometry of wheel-rail contact in a high-speed railway system.

  • PDF