• 제목/요약/키워드: high speed catenary system

Search Result 184, Processing Time 0.036 seconds

경부고속철도 운행구간의 전차선로와 표정속도 향상에 대한 연구 (Study on Commercial speed up and Catenary System in Gyeongbu High Speed Line)

  • 안영훈;최종복;박현웅
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2011년도 정기총회 및 추계학술대회 논문집
    • /
    • pp.2306-2309
    • /
    • 2011
  • With the opening of 1st phase and 2nd phase in Gyeongbu High Speed Line, KTX(The Korea Train Express) and Sancheon(2nd generation of High Speed Train) are operating commercially on entire line. Gyeongbu High Speed Line can be separated as several sections. In this entire line, a few types of train has operating by it's own pattern. However, commercial speed of the line compared with the maximum speed of Train is rather slow. Through this study, I found the reason of the slow speed on the Catenary system and suggested a solution.

  • PDF

A Test Study on Interface Dynamics of Current Collection System in High Speed Trains

  • Kim, Jung-Soo;Han, Jae-Hyun
    • International Journal of Railway
    • /
    • 제4권2호
    • /
    • pp.34-41
    • /
    • 2011
  • Using a test run data, the dynamics of the interface between the catenary and pantograph constituting the current collection system in high-speed trains are investigated. The test run signals are analyzed to determine the dynamic parameters critical to the current collection performance. There are found to be frequency components of the pantograph motion that are dependent on train speed as well as components that are stationary such as the resonant mode of the panhead suspension in the pantograph. From contact force measurement using load cell, the mean contact force was found to be stable while the fluctuating component was found to be dependent on the range of the frequency of the pantograph motion taken into account. The finding implies that numerical investigations reported in the literature that are based on lumped element models of the catenary and/or pantograph provide accurate predictions on the mean value but are of limited use in estimating fluctuation of the contact force. It is concluded that simulation studies based on lumped-element models which do not incorporate panhead structural vibration modes is inaccurate at high train speeds.

350km/h 전차선로 집전성능 시험 및 결과 분석 (Analysis of Current Collection Performance Testing and Result of 350[km/h] Catenary System)

  • 허용석;이인희
    • 전기학회논문지
    • /
    • 제65권2호
    • /
    • pp.365-369
    • /
    • 2016
  • The 350[km/h] catenary system was successfully opened in Honam high speed line. This 350[km/h] catenary system is firstly constructed in South Korea. Therefore the current collection performance of this system should be tested and evaluated by the authority. This paper describes the testings by running of HEMU-430X train and the evaluation criteria and result analysis to determine whether the performance of the catenary is good or not as a verification of catenary-pantograph interface. In detail, the contact force by pantograph, arcs by loss of contact and uplift amount of the catenary support were measured and discussed as a category of the current collection performance.

Harmonic Analysis on the Korean AC Railway System

  • Lee, Han-Min;Kim, Gil-Dong;Oh, Kwang-Hae;Jang, Gil-Soo;Kwon, Sae-Hyuk
    • KIEE International Transactions on Power Engineering
    • /
    • 제5A권3호
    • /
    • pp.235-243
    • /
    • 2005
  • Line constants of the catenary system are estimated. The harmonic current that the Korean Train Express (KTX) injects into the catenary is measured to precisely analyze the harmonic effects. The Korean high-speed railway system is modeled by estimated and measured results. The system model is applied for predicting the harmonic effects. The simulation results from the system model are compared to field test data concerning the total harmonic distortion (THD). The reliability of the system model is verified.

순환전류에 대한 전철설비 보호카바 개선 연구 (A study on better wire protector of equipment on the Circulating Current in Catenary System)

  • 강승욱;김인철;김효진;김대식;백성현;한상옥
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.375-378
    • /
    • 2007
  • In these days, Korea Railway apply simple catenary system to general lines and high speed lines of Korea Electric Railway. Circulation Current in catenary system frequently bring undesirable consequences. Namely, the Connector wire has many problems according to a flow of excessive circulation (or traction current) and a sudden rise of temperature on catenary when electric car or locomotive is running in high speed. The occurrence of events by the load increasement do considerable damages to peoples, organizations and systems. On a case by case accidents, the reeltype protective cover as part of various methods has some problems. In this project, we proposed the improved changes on the catenary system of a improvement and change of a messenger wire protector, improvement of connector wire's institution angle and of a replacement the connector wire with a dropper. Its tridimensional space limitation dictated the scale of the $32{\times}{\Phi}55$ to be as small as possible. It is easier to install than work by the existing cover on the messenger wire.

  • PDF

고속전차선로 상세설계 자동차 소프트웨어 개발 (Development of Detail Design Software for High Speed Catenary System)

  • 김주락;이기원;창상훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.257-259
    • /
    • 2002
  • This study presents a development of DeCatS which is software to design high speed catenary system automatically. This is developed by KRRI with the support of KHSR. This paper presents a process of developing this S/W and a comparison with LEXCAT is demonstrated a preciseness of this.

  • PDF

고속전차선로 설계자동화를 위한 자재관리 D/B의 설계 및 개발 (A Development of Automatic materials management D/B for High-speed catenary system)

  • 이기원;김주락;창상훈
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 춘계학술대회 논문집 전기기기 및 에너지변환시스템부문
    • /
    • pp.263-265
    • /
    • 2002
  • This paper presents a design method of database to manage materials having hierarchical structure on Kyungbu high-speed catenary system. Through this method, the automatic management software was developed. The software can get to find out assemblies as well as single fittings used in a section.

  • PDF

가선계의 강성변화와 판토그래프의 집전성능 (Time-varying Stiffness of Catenary System and its Effect on Current Collection by Pantograph)

  • 최연선
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2000년도 춘계학술대회 논문집
    • /
    • pp.598-605
    • /
    • 2000
  • The design of a current collection system of high speed train requires the fundamental understandings fer the dynamic characteristics of a catenary system and pantograph. The stiffness of the catenary system of high speed train has the varying characteristics for the change of the contact point with a pantograph, since the supporting pole and hanger make the different boundary conditions for the updown stiffness of a trolley wire. The variation of stiffness results in Mathiue equation, which characterizes the stability of the system. However, the two terms variation of the stiffness due to span length and hanger distance cannot be solved analytically. In this paper, the stiffness variations are calculated, and the physical reasoning of linear model and one term Mathieu equation are reviewed. And the numerical analysis for the two term variation of the stiffness is done for the several design parameters of the pantograph.

  • PDF

전차선과 팬터그래프 사이의 동적 상호작용 시뮬레이션 (Simulation of the Dynamic Interactions between Catenary and Pantograph)

  • 권삼영;김길상
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 1995년도 하계학술대회 논문집 A
    • /
    • pp.455-459
    • /
    • 1995
  • Catenary/pantograph system consists of overhead lines which have non-uniform elasticity and pantographs which move at high speed and give force to the lines, therefore happen to be failed in contacts between both from time to time. In this study, as the first step to develop a dynamic simulation program, the general theory is discussed for catenary/pantograph system and appropriate modelling. And comparison is conducted with the references after making a program which referred to the contact force equation algorithm. On this algorithm, the unknown contact force is computed by the equations which was induced as combining catenary and pantograph motion equations expressed in finite difference form. Another simulation program based on the assumed contact forces algorithm was developed. In this algorithm, numerical integraion of both the overhead line and pantograph equations, which without combining, are effected for two assumed values of contact force. The correct contact force is then obtained from these two sets of results by linear interpolation to satisfy the contact condition. Through the comparative review on the outputs from this program, it is verified that this algorithm is reliable.

  • PDF

저속풍동실험 및 유동해석을 통한 고속전철 판토그라프의 유동소음 해석 (Prediction of Aeroacoustics Noise of Pantograph via Low Speed Wind Tunnel Test and Flow Simulation)

  • 조운기;이종수
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2001년도 추계학술대회논문집 II
    • /
    • pp.1207-1214
    • /
    • 2001
  • The paper deals with the computational approach in analysis and design of pantograph panhead strips of high-speed railway in aerodynamic and aeroacoustic concerns. Pantograph is an equipment such that the electric power is supplied from catenary system to train. Due to the nature of complexity in high-speed fluid flow, turbulence and downstream vortices result in the instability in the aerodynamic contact between panhead strips and catenary system, and consequently generate the considerable levels of flow-induced sound. In this paper, based on the preceding low speed wind-tunnel test and simulations, the aerodynamic and aeroacoustic characteristics in low speed are analyzed.

  • PDF