• Title/Summary/Keyword: hazard

Search Result 6,435, Processing Time 0.028 seconds

Construction of Multi-purpose Hazard Information Map Based on Digital Image Using Geospatial Information (지형공간정보를 활용한 수치영상기반의 다목적 재해정보지도 구축)

  • Yun, Hee-Cheon;Min, Kwan-Sik;Kim, Min-Gyu
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.13 no.3
    • /
    • pp.91-101
    • /
    • 2010
  • As global warming has caused the number of abnormal changes in climate to increase throughout the world, much damage has occurred recently in Korean Peninsula which results from unexpected heavy rains, landslides, and floods from typhoons. To prevent and cope with these annually repeated natural hazards, the overall improvements are needed, including systematic management of the existing natural hazard information and improvement of hazard information. In this study, multi-purpose hazard information map based on digital image was constructed as an effective way to enhance hazard management considering regional characteristics and hazard response capabilities in the field. Multi-purpose hazard information map with a new concept by fusion of geospatial information and hazard attribute information is able to support quick decision for hazard management making and development of hazard information system.

Analysis of Uniform Hazard Spectra for Metropolises in the Korean Peninsula (국내 주요 광역 도시에 대한 등재해도 스펙트럼 분석)

  • Rhee, Hyun-Me;Kim, Min Kyu;Sheen, Dong-Hoon;Choi, In-Kil
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.17 no.2
    • /
    • pp.71-77
    • /
    • 2013
  • The uniform hazard spectra for seven major cities in Korea, Seoul, Daejeon, Daegu, Busan, Gwangju, Ulsan, and Inchon are suggested. Probabilistic seismic hazard analyses were performed using the attenuation equations derived from seismology research in Korea since 2000 and the seismotectonic models selected by expert assessment. For the estimation of the uniform hazard spectra, the seismic hazard curves for several frequencies and PGAs were calculated by using the spectral attenuation equations. The seismic hazards (annual exceedance probability) calculated for the 7 metropolises ranged from about $1.4305{\times}0^{-4}/yr$ to $1.7523{\times}10^{-4}/yr$ and averaged out at about $1.5902{\times}10^{-4}/yr$ with a log standard deviation of about 0.085 at 0.2 g. The uniform hazard spectra with recurrence intervals of 500, 1000, and 2500 years estimated by using the calculated mean seismic hazard on the frequencies presented peak values at 10.0 Hz, and the log standard deviations of the difference between metropolises ranged from about 0.013 to 0.209. In view of the insignificant difference between the estimated uniform hazard spectra obtained for the considered metropolises, the mean uniform hazard spectrum was estimated. This mean uniform hazard spectrum is expected to be used as input seismic response spectrum for rock sites in Korea.

Hybrid Hazard Analysis for Improving Safety of Railway System (철도 시스템의 안전성 향상을 위한 하이브리드 위험원 분석)

  • Jeong, Daehui;Kwon, Gihwon
    • The Journal of Korean Institute of Information Technology
    • /
    • v.16 no.11
    • /
    • pp.133-144
    • /
    • 2018
  • IEC 62278, the Railway System Safety Standard, requires for hazard analysis to prevent or control the hazard that the railway system may have. If hazard analysis is not performed sufficiently, there is a high probability that accidents will occur. For this reason, hazard analysis methods are actively studied. In this paper, we propose the hybrid hazard analysis method to combine two representative hazard analysis methods: reliability-based and system-theoretic. As the proposed method is complementary to existing ones, it covers both the hazard caused by failure of components and the hazard occurred from the unintended control between components. It applies to the development of a safety protection mechanism for multiple cruise control system that automatically control the speed of trains to avoid the collision among trains. As a result, we drive more safety requirements than the existing analysis methods and it turns out that the safety requirements protect the trains with respect to the identified hazards.

Comparison of Hazard Analysis for Medical Device System (의료기기 시스템의 해저드 분석 기법 비교)

  • Choi, Bo-yoon;Lee, Byong-gul;Han, Hyuk-soo
    • Journal of Internet Computing and Services
    • /
    • v.19 no.6
    • /
    • pp.133-145
    • /
    • 2018
  • Medical systems incurred accidents may result in significant damage for human being. Therefore, performing hazard analysis is important for medical system which is to identify hazard for preventing the accidents and minimizing the potential harm. Hazard analysis that is applied medical systems are difficult to apposite selected, because difference of analysis methods and applied development lifecycle is caused by objective of hazard analysis. It is required to select appropriate hazard analysis at concept phase during development lifecycle, owing to basic requirement elicitation to mitigate or prevent hazard based on identified hazard at concept phase. In this paper, hazard analysis methods, PHA and STPA, are compared at concept phase in which both methods have been applied on the medical system. As a result of compared methods, hazard analyst can be selected optimized hazard analysis methods for concept phase of the medical systems.

Categorization of Hazard Chemicals Potentially Discharged into Water System (수계 유출가능성이 있는 유해화학물질 분류화)

  • An, Youn-Joo;Nam, Sun-Hwa;Lee, Jae-Kwan
    • Journal of Korean Society on Water Environment
    • /
    • v.24 no.2
    • /
    • pp.247-259
    • /
    • 2008
  • The utilization of a variety of hazard chemicals bears risks to human health and ecosystem. The increasing usage of various chemicals indicates the greater emission of those chemicals to water system, and the subsequent deterioration of water quality. Water system is vulnerable to many pollutants, however, there are limitations of managing a range of hazard chemicals based on insufficient legal foundations. Therefore it is needed to select hazard chemicals that can be potentially discharged into water system, and subsequently to classify a wide range of existing chemicals for better management of those chemicals. In this study, the 259 candidate chemicals of concern were selected from the lists of the toxic released inventory chemicals (148), hazard concern candidate chemicals (106), and wastewater effluent standard candidate chemicals (116). We suggested the category 1, 2, 3 and 4 of hazard chemicals potentially discharged into water system. The assessment factors considered for the classification were hazard potential, persistence and emission to water body. This work was conducted as a part of the project entitled 'Development of integrated methodology for evaluation of water environment', and the results were used to develop the monitoring lists of hazard chemicals in four major rivers in Korea.

A study on chemical hazard communication for workers exposed to N, N-dimethylformamide (N, N-dimethylformamide 취급근로자의 유해위험 정보 인식도 조사)

  • Yang, Jeong Sun;Lim, Cheol Hong;Lee, Hae Jin
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.21 no.2
    • /
    • pp.103-109
    • /
    • 2011
  • Object: we investigated some factors which can affect workers' comprehension of chemical hazard information and their actions to protect themselves from the hazard. Method: Comprehension score of chemical hazard information and the rate of wearing personal protective equipment (PPE) was surveyed for the 109 workers from 15 factories who were exposed to N, N-dimethylformamide. Difference of the worker's comprehension score of hazard information was analyzed by education interval, work duration and the way of occupational safety and health management between self-managed or sub-contracted. Result: Mean comprehension score of N, N-dimethylformamide hazard, which was given as a short quiz composed of 10 "true" or "false" problems, was 65%. Mean percentage of wearing PPE was improved as the education program was done within a month but decreased after 6 months. Eighty seven % of workers got the chemical hazard information from the material safety data sheet placed at workplace. Conclusion: Education interval and comprehension score affected the rate of wearing PPE. The way of occupational safety and health management self-managed or sub-contracted did not affect the workers' comprehension score on hazard information nor the rate of wearing PPE.

A STUDY ON THE SAFETY INFORMATION SYSTEM TO PREVENT HAZARD OF BUILDING CONSTRUCTION

  • Han-Min Lee;Seong-Seok Go;Hyuk Song;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1048-1052
    • /
    • 2005
  • In Korean cases, the occupation of building construction is below 10% of the total industry workers but from a accident rate point of view, it is a risk serious industry and it's hazard is very considerable which accident rate is up to 30% of the total industry workers. The reason of high accident rate of the building construction is its own characteristic, hazard of the work in which is implicated and the shortage of safety counter plan and information, so it is most required to the building construction that educating, training, short and long period approaching to prevent the hazard. The safety information of building construction which is related to safety accident is divided into human and material such as hazard, work situation, cause and counter plan. The existing hazard cases imply all of the information about the work type and work progress of the building construction, so if the research of the every fact is well accomplished, we can obtain the useful information and prevent the hazard of building construction. From this point of view, the emphasis of this study is based on analyzing the cause of hazard first, suggesting the safety information each part of work type and work progress second, and finally making the all existing hazard cases to the Data Base and developing the safety information system.

  • PDF

Risk Assessment of Submerged Floating Tunnels based on Fuzzy AHP (퍼지 AHP를 이용한 수중터널의 재해위험도 분석)

  • Han, Sang-Hun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.7
    • /
    • pp.3244-3251
    • /
    • 2012
  • In the construction and operation of large marine structure, hazard risk analysis is one of important factors. Therefore, this paper investigates the hazard risk indexes and evaluates the risk level in the construction and operation of SFT on the basis of expert survey and Fuzzy analytic hierarchy process. Hazard risk is divided into natural hazard risk (earthquake, typhoon, tsunami, and ice collision) and human factor hazard risk (fire, explosion, traffic accident, ship or submarine collision). Also, the influence of hazard risk indexes on SFT was evaluated in tunnel tube, supporting system, ventilation tower, foundation, and connection part. As the hazard risk level of SFT is compared with those of bridge, underwater tunnel, and immersed tunnel, the intrinsic risk level of SFT was evaluated. Tsunami and earthquake had higher risk level in natural hazard risk, and the risk levels of fire and explosion were higher in human factor hazard risk. Hazard risk level of SFT was 1.4 times higher than immersed tunnel, and 3.2 times higher than bridge.

Development of Disaster Prevention Information System using Disaster Prevention Map Based on Digital Image (수치영상 기반의 방재지도를 활용한 방재정보시스템 개발)

  • Park, Joon-Kyu
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.19 no.4
    • /
    • pp.47-53
    • /
    • 2011
  • As global warming and has caused the number of abnormal changes, much damage has occurred recently in Korean Peninsula from natural disaster. To prevent and cope with these annually repeated natural hazards, scientific analysis are needed in Disaster Management, including systematic management. In this study, As part of scientific disaster prevention measures, digital image based hazard map for solution to overcome the existing hazard map with schematic representation was constructed. which was combined digital image, digital map and hazard information, and than hazard information system was developed using the hazard map. The hazard information map and hazard information system are able to provide great service to the public and to support quick decision making for hazard management and analysis of natural hazard damage.

Study on Mapping Methodof Liquefaction hazard Potential in Korea (국내의 액상화 구역도 작성 기법에 관한 연구)

  • 강규진
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2000.04a
    • /
    • pp.141-150
    • /
    • 2000
  • In this study liquefaction hazard potential was assessed by modified Seed and Idriss method and maps of liquefaction hazard potential utilized by LPI(Liquefaction Potential Index) and FE(Equivalent Liquefaction Factor of Safety) were constructed in two dimensional space, Comparisons of liquefaction hazard maps assessed by LPI and FE are represented to verify the FE method proposed in this study. Based on the results of comparing liquefaction hazard map using LPI and FE there is similar distribution trend of zonation indices. from the result of comparison of liquefaction hazard maps of FE base using Hachinohe and ofunato PGA(Peak ground Acceleration) data at one site of port and harbor in Korea the values of FE in liquefaction hazard map using Hachinohe data are underestimated. And in the view of quantitative analysis FE is more convenient than LPI because types of results from FE are factor of safety that widely used in geotechnical practice and aseismic design standard for port and harbor in Korea.

  • PDF