To elucidate the effects of a hydroelectric dam construction on annual ring growth of Pinus densiflora, the annual ring widths of 68 trees collected from 7 sites were closely examined. The result was analyzed to ask three special questions first, whether there are real effects of dam construction on the radial growth second, would the magnitude of the effect be different due to two periods of under-construction and post-construction the last, would it be different among age classes. Annual ring growth has been significantly enhanced by the dam construction. Specially, its effect was marked after the construction was finished and the reservoir was filled up with water. There was, however, no remarkable evidence that pine growth would be reduced while the dam was under construction, even though there was a minor decreasing trend. The magnitude of the effect was different among age groups. That is, the changed condition after the construction enhanced relatively the growth of aged trees monre. According to other meterological research since the dam was constructed, the reasons of enhancing pine growth assumed to be the increase of daily temperature, the decreased of daily temperature difference and the increased of rainy days.
Hyounseung Jang;Seokin Choi;Boknam Lee;Wooyoung Kim;Chulki Chang;Younghwan Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1426-1432
/
2009
Green growth is summarized as the national growth strategies to enhance the quality of life as a whole by converting not only the lifestyle but the economic and industrial structures into the low carbon and eco-friendly environments with the green growth industries with low carbon as the momentum for new growth, based on green technologies including renewable energy technologies, energy and resource efficient technologies, converging technologies related to technologies to reduce the environmental pollution. Roles of the construction industry along with other industries are very important in securing justifications for the cooperation between our government and industries for challenges to this green growth as well. The national effects of economy are very large from leading the construction industry to the green construction from the national level. Accordingly, this study suggested responsive plans for both government and companies for the activation of green construction by selecting 15 frontier green construction products and analyzing them by the type of strategy in Korea, as well as analyzing recent trends of overseas green construction.
This study considers reliability growth management as the excellent method for construction equipment development with the effect on decreasing COPQ(Cost of Poor Quality Cost) of new products. MIL-HDBK-189A(1981) and RADC-TR-84-20(1984) standards provide a general concept of reliability growth management including to reliability growth test, models and FRACAS(Failure Reporting and Corrective Action System). There is no study how to apply reliability growth management to construction equipment(or machine) development. This paper propose the method to apply it to construction equipment development process from the reliability target setting for developing products to launching them at market. It is expecially showing how to set target reliability for new developing equipment and the development risk to reach the reliability target in detail.
The 3th International Conference on Construction Engineering and Project Management
/
pp.40-40
/
2009
Construction firms have long sought success in the global construction market through diversifying revenue sources and project portfolios. The volume of international contracts has contributed to firms' sustained growth by mitigating the impact of the domestic market's cyclical nature. In spite of the importance of international construction, the uncertainty and dynamic changes surrounding global construction pose serious threats to global contactors. Over the last decade, the international construction industry has changed drastically in many ways, particularly including financial resource diversity, competition rules for the selection of contractors, and the terms of delivery systems requiring more competent total service providers. This paper investigates the important changes for global contractors through various documentation analysis as well as in-depth interviews with industry experts. This paper then analyzes the common strategies and lessons obtained from the cases of leading global contractors that have sustained their growth in the competitive global construction during the last decade. In addition, the authors further analyzed the comparisons between those firms and Korean contractors to discern any difference in sustaining their growth in the competitive market. It was found that those leading firms were quite proactive and responsive to changing markets by diversifying their market revenues to stabilize their revenue structure and enhancing their competency through a wide range of 'business convergence'. In addition, they significantly increased their upstream/downstream functional capabilities; hence becoming more competent service providers, able to grow in these rapidly changing market conditions. Finally, this paper benchmarks the critical strategies that support growth, which in turn can provide a strategic guideline for expansion into the global construction market.
The 6th International Conference on Construction Engineering and Project Management
/
pp.210-212
/
2015
The growth-share matrix is a portfolio planning tool developed by the Boston Consulting Group (BCG) to assist competitive positioning in the international market including those in the construction industry. This matrix is helpful in balancing the firm's cash-flow, and it can suggest strategic directions for each business unit. However, its effectiveness and applicability have long been debated in the academic field due to the complex and unique industrial context of construction. To solve the dispute, this research clarifies the applicability of theories underlying the growth-share matrix to the construction industry. Empirical research based on actual financial data of Korean construction firms is adopted for the statistical analysis including one-way analysis of variance and correlation analysis. The results of this research show that empirical findings on the relationship between performance variables. In this context, this research can provide important insights on the concept of portfolio management in the construction industry.
Kim, Sung-Youn;Jang, Am;Kim, I-Tae;Kim, Kwang-Soo;Kim, In-S.
Environmental Engineering Research
/
제10권6호
/
pp.283-293
/
2005
Characteristics of sulfur-based autotrophic denitrification in a semi-continuous type reactor and the kinetic parameters were studied. Enriched autotrophic denitrifying culture was used for the reactor operation. Biomass growth on sulfur particles and in the liquid medium was monitored using the DAPI staining method. From the result of ion concentration changes and the biomass growth, maximum specific growth rate, ${\mu}_{max}$, and the half velocity constant, $K_M$, were estimated as $0.61\;d^{-1}$ and 3.66 mg/L, respectively. Growth yield coefficient, Y values for electron acceptor and donor were found as 0.49 gVSS/g N and 0.16 gVSS/g S. The biomass showed specific denitrification rate, ranging 0.86-1.13 gN/g VSS-d. A half-order equation was found to best simulate the denitrification process in the packed bed reactor operated in the semi-continuous mode.
The 9th International Conference on Construction Engineering and Project Management
/
pp.50-56
/
2022
Change Orders generally impact cost and schedule performance of highway projects. However, highway projects that do not have any change orders also face cost growth and schedule delays. This study seeks to determine the cost and schedule performance of Texas DOT projects by collecting project data for 120 highway projects completed between 2016 to 2020. For the study, we selected project data that has zero or negative change orders which were then grouped and analyzed based on their Project Types i.e., maintenance works; structural works; restoration and rehabilitation works; and safety works. The study found that performance of Maintenance and Safety type projects had less cost and schedule growth among the data analyzed. Statistical tests also found that even though the projects have no change orders, Rehabilitation and Restoration type projects experienced significant schedule growth compared to others. However, the data did not show any significant cost and schedule growth for the projects when statistical tests were performed on overall data. The study concluded that highway projects are experiencing schedule growth even though the projects had no change orders. Results from the study can help planners, engineers, and administrators to gain better insight on how different types of highway projects are performing in terms of cost and schedule and eventually derive appropriate solutions to minimize cost and schedule growth in such projects.
NGUYEN, Phong Thanh;HUYNH, Vy Dang Bich;NGUYEN, Quyen Le Hoang Thuy To
The Journal of Asian Finance, Economics and Business
/
제8권2호
/
pp.195-200
/
2021
In recent years, Vietnam's economic growth rate has been attributed to the growth of many well-managed industries within Southeast Asia. Among them is the civil construction industry. Construction projects typically take a long time to complete and require a huge budget. Many socio-economic variables and factors affect total construction project costs due to market fluctuations. In recent years, crucial socioeconomic development indicators of construction reached a fairly high growth rate. Also, most infrastructure and construction projects have a high degree of complexity and uncertainty. This makes it challenging to predict the accurate project price. These challenges raise the need to recognize significant factors that influence the construction price index of civil buildings in Vietnam, both micro and macro. Therefore, this paper presents critical factors that affect the construction price index using the fuzzy extent analysis process in an uncertain environment. This proposed quantitative model is expected to reflect the uncertainty in the process of evaluating and ranking the influencing factors of the construction price index in Vietnam. The research results would also allow project stakeholders to be more informed of the factors affecting the construction price index in the context of Vietnam's civil construction industry. They also enable construction contractors to estimate project costs and bid rates better, enhancing their project and risk management performance.
The 6th International Conference on Construction Engineering and Project Management
/
pp.459-462
/
2015
Korean construction industry made a huge growth over several decades. However, domestic construction market has shrunk in recent years due to the domestic political environments and global economic crisis. Today, the international construction markets become more important to be investigated, and demands for international construction study have risen. The purpose of this study is to search for measures to compare the potential of Southeast Asian countries' construction markets and select strategic target countries where the Korean construction companies pursue to explore for future investments. The research team investigated a range of selection factors which can represent the construction market condition of each country. These factors included the size of the construction industry, economic growth potential, current relationship with Korea, the level of infrastructure development, political situation, etc. After collecting data, each selection factor was scored by experts' analyses and the total score was given to each country. As a result, the rating identified attractive countries for future investments: Myanmar, Vietnam, and Sri Lanka. For the target countries, analytical methods were used for in-depth market analysis that can provide comprehensive insight and strategic clue for development of short-/mid-/long-term roadmap and action plans. The research findings would be used to support rational decision making of construction investment advancing to the Southeast Asian economic growth.
최근 건설산업이 자율과 경쟁을 중시하는 시장주의로 전환됨에 따라 건설기업은 변화된 환경에 대응하고자 노력하고 있다. 본 연구는 급변하는 환경 속에서 살아남기 위하여 건설기업이 취하는 전략 및 핵심역량과 기업의 성과인 성장률 및 수익률과의 상호 연관성을 분석하기 위해 수행되었다. 이론적 고찰을 통하여 건설기업의 전략유형 및 핵심역량을 도출하여 설문조사를 실시하였다. 이를 통해 경쟁우위 전략을 취하는 건설기업의 핵심역량이 가장 우수함을 확인할 수 있었다. 그러나 건설기업이 취하는 전략유형과 성장률 및 수익률은 연관성이 없는 것으로 파악되었다. 또한 건설기업의 핵심역량은 수익률과 관련성이 없는 반면, 성장률과는 상관성이 있는 것으로 분석되었다. 따라서 건설기업이 성장하기 위해서는 경쟁우위 전략의 이행 시 요구되는 핵심역량 확보가 필수적임을 알 수 있었다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.