The On Line Electric Vehicles(OLEV) that can pick up inductive power from underground coils on driving with high efficiency have been developed this year, and is now proposed in this paper. The IPS(Inductive Power Supply) system consists of power supply inverters, power supply rails, pick up modules, and a regulator. There are 3 generations of IPS have been developed so far, and the $4^{th}$ generation IPS is being developed. The $1^{st}$ generation has been demonstrated this Feb. 27, which is equipped with mechanically auto tracking pick-up module with 1cm air gap, and showed 80% power efficiency. The $2^{nd}$ generation IPS applied to an 120kW (average)/240kW(peak) motor powered electric bus has 17cm air gap with 72% power efficiency. For the $2^{nd}$ generation IPS, the Power supply inverter has 440V, 3phase input and 200A @ 20kHz output. The test power supply rail of 240m long is segmented by 60m each, where newly developed core structure and power cable are constructed under the road covered with asphalt of 5cm thickness. The pick-up modules which consist of core, winding wire, and rectifiers are fixed to the bottom of the bus which can carry more than 40 passengers and can pick up max. 60kW. To remove parasitic component and to transfer maximum power between them resonant circuit topology is applied to the primary and secondary sides. The EMF level is below 62.5mG at 1.75m from the center of the road to meet the regulation. Several effective ways of reducing EMF levels have been developed. In addition, effective ways to solve problems related high frequency power cables buried in ground and it's proof from soil have been studied also. This development shows that the IPS system is capable of supplying enough power to the pick-up of OLEV and can reduce battery size, weight and cost, which means the IPS with OLEV is one of the best candidate for EV.
우리나라에서 개발 중인 저궤도 위성은 아리랑 위성으로, 이제까지 꾸준한 성능향상이 있었다. 이때 탑재체의 성능향상에 따른 탑재체의 전력요구도는 늘어나게 되었고 이에 위성 내부 전력 공급장치의 설계 및 Solar Array의 구성 등 위성 설계가 달라진다. 이에 따라 위성에 전력을 공급하며 위성 통합시험을 진행하는 전력계 전기지상지원장비 설계 시 전력 증가에 따라 많은 고려사항이 필요로 한다. 본 논문은 탑재체에 따른 위성 전력요구도의 변화 및 전력요구도 증가에 따른 전력계 전기지상지원장비 설계 시 고려할 사항에 대해서 다룬다.
본 논문은 낙뢰 Surge 방호를 위하여 독립접지를 공통접지로 개선하는 효율적인 방법을 제안하였다. 낙뢰 Surge 방호를 위해서는 등전위 이론에 근거하는 공통접지방식이 적합하고, 중성선이 있는 전원계통에서는 공통접지방식을 사용하는 것이 국제적으로 통용되는 기술규격이다. 따라서 낙뢰 Surge에 취약한 문제점을 갖고 있는 기존의 중성선이 없는 전원계통의 독립접지방식을 중성선이 있는 전원계통의 공통접지방식으로 개선을 하고, 정전압소자를 이용하여 낙뢰 Surge를 방호하는 효율적인 등전위 시스템 구축 방법을 제안한다.
Grounding fault and short of the DC power supply systems are detected and protected by high-speed circuit breaker, linked breaking device, ground relay and fault selective device, all of which are installed and operated in substaions. however, there have been many cases in which the protective devices did not detect grounding of of the over head catenary systems on concrete support for an extended period of time. Such cases often cause severe damages to the supports with high grounding resistances. If grounding accidents occur repetitively, the earth current and the rise of earth potential can damage not only passenger and staff but also electric facilities and equipment, necessitating high cost and endeavor to restore. The following study points out various problems that can be occurred occur as a result of high impedance grounding accident, and proposes a new system which can protect and intercept them.
Thousands of demersal fishes inhabit in the waters around Korea and most of them are overexploited. One of reasons is technological development, which increases the efficiency of the vessels continuously. The analysis was conducted to identify the change of fishing power index to develop the vessel and gear technology that may have improved the fishing efficiency of the Danish seine fishery from 1960s to 2010s. Gross tonnage was decreased stably, but the horse power was increased annually. The length of ground rope, warp and hand rope was somewhat longer, but changed a little. Color fish finder was utilized from the mid-1960s and positioning system was used five years later. A hydraulic line hauler were introduced in the mid-1980s, and supply rate was gradually increased. Surveys on the supply and upgrading of fishing equipment utilized visiting researchers. Therefore, the relative fishing power index in the Danish seine fishery increased stably from 1.0 in 1970 to 1.0 in 1980, to 1.2 in 1990, to 1.3 in 2000 and to 1.3 in 2010. The results are expected to contribute to reasonable fisheries stock management.
This study is performed to performance of the combined system the GSHP (Ground Source Heat Pump) system with the Earth tube system using EnergyPlus program. The Earth tube system using fan is characteristics as supply lower (higher) air temperature than outdoor air temperature in cooling and heating seasons, the GSHP system is characteristics as small indoor air temperature variation range. As the results of Earth tube + GSHP system simulation, GSHP power can be reduced than the GSHP single operation as 17.3% in cooling seasons and 32.5% in heating seasons, the GSHP design capacity can be replaced more small size.
In this paper, the fault line selection and location problems of single line-to-ground (SLG) fault in distribution network are addressed. Firstly, the adaptive filtering property for empirical mode decomposition is formulated. Then in view of the different characteristics showed by the intrinsic mode functions(IMF) under different fault inception angles obtained by empirical mode decomposition, the sign of peak value about the low-frequency IMF and the capacitance transient energy is chosen as the fault line selection criteria according to the different proportion occupied by the low-frequency components. Finally, the fault location is determined based upon the comparison result with adjacent fault passage indicators' (FPI) waveform on the strength of the interaction between the distribution terminal unit(DTU) and the FPI. Moreover, the logic nodes regarding to fault line selection and location are newly expanded according to IEC61850, which also provides reference to acquaint the DTU or FPI's function and monitoring. The simulation results validate the effectiveness of the proposed fault line selection and location methods.
A power control and distribution unit(PCDU) plays roles of protection of battery against overcharge by active control of solar array generated power, distribution of unregulated electrical power via controlled outlets to bus and instrument units, distribution of regulated electrical power to selected bus and instrument units, and provision of status monitoring and telecommand interface allowing the system and ground operate the power system, evaluate its performance and initiate appropriate countermeasures in case of abnormal conditions. In this work, we perform the preliminary design of a PCDU scheme for the small LEO Satellite applications. The main constitutes of the PCDU are the battery interface module, the auxiliary supply modules, solar array regulators with maximum power point tracking(MPPT) technology, heater power distribution modules, internal converter modules for regulated bus voltage generation. and instrument power distribution modules.
본 논문에서는 전기자동차 배터리의 충전 방안 중 하나로 여겨지는 무선전력전송을 이용할 경우 발생 가능한 보호협조 문제점을 분석한다. 전기충전을 위한 무선전력전송 시스템을 구축하기 위해서는 전원공급장치 개발이 필수적이나, 전원공급장치의 정확한 설치기준이 없기 때문에 운용 시 보호협조 상에 문제점이 발생 할 수 있다. 따라서 본 논문에서는 PSCAD/EMTDC로 무선전력전송 전기충전설비용 전원공급장치를 모델링하여 가능성 있는 사고를 모의해보고, 이를 해결할 수 있는 대안을 제시하고자 한다. 즉, 사고 발생 시, 전원공급장치의 60Hz 대역에서 정격차단용량(12.5kA) 상회 가능성과 20kHz 대역에서의 임피던스 병렬화로 인한 보호기기의 부동작 가능성을 시뮬레이션을 통해 확인하였고, 이에 대한 해결책으로 대칭좌표법을 이용한 사고해석 알고리즘과 사고전류를 저감시킬 수 있는 NGR 산정 알고리즘을 제안하였다. 이를 통해 60Hz 대역에서는 NGR(Neutral Ground Resister)을 도입하여 사고전류를 정격차단용량 이하로 저감시키고, 20kHz 대역에서는 중선선에 CT 설치 및 이에 대한 보호정정을 통해 보호기기 부동작이 방지됨을 확인하였다.
급전시뮬레이션과 함께 수행될 수 있는 '레일 전위 상승 분석을 위한 컴퓨터 알고리즘'이 제안되었다. 본 알고리즘에서 레일전위상승 분석은 2 단계로 진행된다. 첫 단계에서는 급전시스템의 조류해석을 수행하여 차량 및 변전소에서의 인젝션(injection) 전류를 구한다. 두 번째 단계에서는 급전시스템의 등가회로에서 변전소 및 차량을 전류 소스로 대치하고 레일의 대지로의 누설 저항이 삽입된 등가회로를 다시 구성한다. 새로 구성된 등가회로를 해석하여 변전소 및 차량 위치에서의 레일 전위를 구한다. 알고리즘의 타당성을 분석하기 위하여 컴퓨터 프로그램을 작성하여 레일전위상승을 구하였고 동일한 시스템을 대상으로 MatLab 사의 Simulink/SymPowerSystems 소프트웨어를 이용하여 레일전위를 구하였다. 2가지 방법에 의한 결과를 상호 비교 분석한 결과는 그 오차가 허용범위 내에 있음을 보여주었다. 본 알고리즘은 급전시뮬레이션과 연동하여 수행될 수 있는 장점을 가지고 있다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.