Probabilistic Reliability Based HVDC Expansion Planning of Power System Including Wind Turbine Generators (풍력발전기를 포함하는 전력계통에서의 신뢰도 기반 HVDC 확충계획)

  • Oh, Ungjin;Lee, Yeonchan;Choi, Jaeseok;Yoon, Yongbeum;Kim, Chan-Ki;Lim, Jintaek
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.1
    • /
    • pp.8-15
    • /
    • 2018
  • New methodology for probabilistic reliability based grid expansion planning of HVDC in power system including Wind Turbine Generators(WTG) is developed in this paper. This problem is focused on scenario based optimal selection technique to decide best connection bus of new transmission lines of HVDC in view point of adequacy reliability in power system including WTG. This requires two kinds of modeling and simulation for reliability evaluation. One is how is reliability evaluation model and simulation of WTG. Another is to develop a failure model of HVDC. First, reliability evaluation of power system including WTG needs multi-state simulation methodology because of intermittent characteristics of wind speed and nonlinear generation curve of WTG. Reliability methodology of power system including WTG has already been developed with considering multi-state simulation over the years in the world. The multi-state model already developed by authors is used for WTG reliability simulation in this study. Second, the power system including HVDC includes AC/DC converter and DC/AC inverter substation. The substation is composed of a lot of thyristor devices, in which devices have possibility of failure occurrence in potential. Failure model of AC/DC converter and DC/AC inverter substation in order to simulate HVDC reliability is newly proposed in this paper. Furthermore, this problem should be formulated in hierarchical level II(HLII) reliability evaluation because of best bus choice problem for connecting new HVDC and transmission lines consideration. HLII reliability simulation technique is not simple but difficult and complex. CmRel program, which is adequacy reliability evaluation program developed by authors, is extended and developed for this study. Using proposed method, new HVDC connected bus point is able to be decided at best reliability level successfully. Methodology proposed in this paper is applied to small sized model power system.

Wind load analysis of Structure for Folding Solar Power System (접이식 태양광 발전 구조물의 풍하중해석)

  • Son, Chang-Woo;Kim, Tae-Kyun;Seo, Tae-Il
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.8
    • /
    • pp.1-7
    • /
    • 2018
  • A folding solar power system is a stand-alone system and is a structure with solar panels attached. It consists of supporting parts and folding parts for ease of movement. While the efficiency of solar panels is also important to produce electricity by maximizing the power efficiency of solar panels, the most important thing is structure stability. The folding solar power structure intended to be developed in this study is a collapsible structure that is easy to move and install into systems that can produce electricity from grid to independent. Since these structures are installed outdoors, wind loads, snow cover, etc. In this paper, the wind loads most affected by the folding solar power generation structure were obtained using the MeshFree Finite Element Method. MeshFree is a program that makes it easier for users to interpret by simplifying the mesh tasks required by an existing analysis. The analysis showed that the greater the angle of inclination of the wind to the ground, the greater the wind load. In addition, reliability was ensured by wind load testing.

A Study on Output Enhancement Method of PV Array Using Electrical Circuit Reconfiguration Algorithm (전기적 회로절체 알고리즘에 의한 태양광 어레이의 출력향상 방안에 관한 연구)

  • Kim, Byung-Mok;Lee, Hu-Dong;Tae, Dong-Hyun;Rho, Dae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.9-17
    • /
    • 2020
  • Recently, RES (renewable energy source) projects have been spreading all over the world as an alternative to solve the shortage of energy and environmental problems caused by fossil fuel consumption. The Korean government also supported the policy and demonstration project to increase the proportion of renewable energy to 63.8[GW] until 2030, which is 20[%] of the total power generation. On the other hand, output loss of a PV array can occur when the surrounding high-rise buildings and trees shade a PV array. Therefore, this paper proposes an algorithm to improve the output loss of a PV array, which electrically changes a circuit configuration of PV modules by wiring and switching devices. Furthermore, this study modeled a PV system based on PSIM S/W, which was composed of a PV array, a circuit configuration device, and a grid-connected inverter. From the simulations results with the modeling and test device, the existing method showed no output when 50% of the shade occurs in PV modules. In contrast, the proposed method could produce the output because the voltage in the PV module could be restored to 246[V], and the operation efficiency of the PV system could be improved by the operation algorithm of the circuit configuration device.

Numerical Study on the Performance Assessment for Defrost and De-Icing Modes (승용차의 제상 및 성에 제거 성능 평가를 위한 수치해석적 연구)

  • Kim, Yoon-Kee;Yang, Jang-Sik;Kim, Kyung-Chun;Ji, Ho-Seong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.35 no.2
    • /
    • pp.161-168
    • /
    • 2011
  • The heating, ventilating, air conditioning (HVAC) system is a very important part of an automotive vehicle: it controls the microclimate inside the passenger's compartment and removes the frost or mist that is produced in cold/rainy weather. In this study, the numerical analysis of the defrost duct in an HVAC system and the de-icing pattern is carried out using commercial CFX-code. The mass flow distribution and flow structure at the outlet of the defrost duct satisfied the duct design specification. For analyzing the de-icing pattern, additional grid generation of solid domain of ice and glass is pre-defined for conductive heat transfer. The flow structure near the windshield, streakline, and temperature fields clearly indicate that the de-icing capacity of the given defrost duct configuration is excellent and that it can be operated in a stable manner. In this paper, the unsteady changes in temperature, water volume fraction, and static enthalpy at four monitoring points are discussed.

Forecast study for active factor of V2B(Vehicle to Building) operation zero energy building using monte carlo method (몬테카를로방법을 이용한 V2B(Vehicle to Building) 운용 제로에너지빌딩의 액티브 요소 예측 연구)

  • Kim, Youngil;Kim, Insoo
    • Journal of Energy Engineering
    • /
    • v.26 no.4
    • /
    • pp.29-34
    • /
    • 2017
  • Factors of Zero-Energy Building are divided into active and passive factor. Passive factor means insulation, heat bridge of building like insulation, windows and doors, awning, outside etc. and active factor means energy output and efficiency coefficient. Energy output of active factor is achieved by new generating energy. This study anticipated how many effects will be produced when not new generating energy but Vehicle to Building; V2B, bi-directional charging and discharging technology, is applied to Zero-Energy Building. In new generating energy, power generation will be anticipated by geography and climate, but in V2B, several input variable like user's discharging intention and number of usable charger etc. should be considered. We can check how much V2B contribute to the Zero-Energy Building by anticipated results, and that results should be anticipated by using probabilitic method because there is few statistical data. This study anticipate change of charging and discharging pattern, based by Demand Response slot, by using monte carlo method among the probabilitic methods.

Effect Analysis for Frequency Recovery of 524 MW Energy Storage System for Frequency Regulation by Simulator

  • Lim, Geon-Pyo;Choi, Yo-Han;Park, Chan-Wook;Kim, Soo-Yeol;Chang, Byung-Hoon;Labios, Remund
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.227-232
    • /
    • 2016
  • To test the effectiveness of using an energy storage system for frequency regulation, the Energy New Business Laboratory at KEPCO Research Institute installed a 4 MW energy storage system (ESS) demonstration facility at the Jocheon Substation on Jeju Island. And after the successful completion of demonstration operations, a total of 52 MW ESS for frequency regulation was installed in Seo-Anseong (28 MW, governor-free control) and in Shin-Yongin (24 MW, automatic generation control). The control system used in these two sites was based on the control system developed for the 4 MW ESS demonstration facility. KEPCO recently finished the construction of 184 MW ESS for frequency regulation in 8 locations, (e.g. Shin-Gimjae substation, Shin-Gaeryong substation, etc.) and they are currently being tested for automatic operation. KEPCO plans to construct additional ESS facilities (up to a total of about 500 MW for frequency regulation by 2017), thus, various operational tests would first have to be conducted. The high-speed characteristic of ESS can negatively impact the power system in case the 500 MW ESS is not properly operated. At this stage we need to verify how effectively the 500 MW ESS can regulate frequency. In this paper, the effect of using ESS for frequency regulation on the power system of Korea was studied. Simulations were conducted to determine the effect of using a 524 MW ESS for frequency regulation. Models of the power grid and the ESS were developed to verify the performance of the operation system and its control system. When a high capacity power plant is tripped, a 24 MW ESS supplies power automatically and 4 units of 125MW ESS supply power manually. This study only focuses on transient state analysis. It was verified that 500 MW ESS can regulate system frequency faster and more effectively than conventional power plants. Also, it was verified that time-delayed high speed operations of multiple ESS facilities do not negatively impact power system operations. It is recommended that further testing be conducted for a fleet of multiple ESSs with different capacities distributed over multiple substations (e.g. 16, 24, 28, and 48 MW ESS distributed across 20 substations) because each ESS measures frequency individually. The operation of one ESS facility will differ from the other ESSs within the fleet, and may negatively impact the performance of the others. The following are also recommended: (a) studies wherein all ESSs should be operated in automatic mode; (b) studies on the improvement of individual ESS control; and (c) studies on the reapportionment of all ESS energies within the fleet.

GPS-based monitoring and modeling of the ionosphere and its applications for high accuracy correction in China

  • Yunbin, Yuan;Jikun, Ou;Xingliang, Huo;Debao, Wen;Genyou, Liu;Yanji, Chai;Renggui, Yang;Xiaowen, Luo
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • v.2
    • /
    • pp.203-208
    • /
    • 2006
  • The main research conducted previously on GPS ionosphere in China is first introduced. Besides, the current investigations include as follows: (1) GPS-based spatial environmental, especially the ionosphere, monitoring, modeling and analysis, including ground/space-based GPS ionosphere electron density (IED) through occultation/tomography technologies with GPS data from global/regional network, development of a GNSS-based platform for imaging ionosphere and atmosphere (GPFIIA), and preliminary test results through performing the first 3D imaging for the IED over China, (2) The atmospheric and ionospheric modeling for GPS-based surveying, navigation and orbit determination, involving high precisely ionospheric TEC modeling for phase-based long/median range network RTK system for achieving CM-level real time positioning, next generation GNSS broadcast ionospheric time-delay algorithm required for higher correction accuracy, and orbit determination for Low-Earth-orbiter satellites using single frequency GPS receivers, and (3) Research products in applications for national significant projects: GPS-based ionospheric effects modeling for precise positioning and orbit determination applied to China's manned space-engineering, including spatial robot navigation and control and international space station intersection and docking required for related national significant projects.

  • PDF

A Study on the Smart Home Safety Management System Based on NIALM (NIALM 기반의 스마트 홈 안전관리시스템에 관한 연구)

  • Jeong, Han-Sang;Sung, Kyung-Sang;Oh, Hae-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.8
    • /
    • pp.55-63
    • /
    • 2017
  • Due to spatial problems and system size,conventional measurement methods used to acquire the information needed for existing electrical energy and management have been limited to new buildings or areas where replacement is possible. This electric load management method is problematic when applying it to energy and safety management of vulnerable areas or existing homes or offices. The problem with installing a measurement module in every branch is that the system is too large. Even if the measurement module is installed, the type of load is not recognized, and efficient management is not performed. In particular, it is very difficult to apply it to traditional markets and backward facilities in Korea. In this paper, we apply NIALM technology and arc detection technology to solve these problems and verify the feasibility of NIALM for normal arc generation. Also, based on the verification results, we propose a new smart home safety management system that can effectively manage electrical safety and that can be applied to conventional market and existing home safety management systems. The proposed system conducts a comparative performance test with an existing safety management system. In addition, it achieves 95% or more load recognition for four loads, which is impossible in 40% of the existing systems, and the arc detection function was confirmed.

3dimension Topography Generation and Accuracy Analysis Using GIS (GIS를 이용한 3차원 지형도 생성 및 정확도 분석)

  • Nim Young Bin;Park Chang suk;Lee Cheol Hee
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.23 no.2
    • /
    • pp.189-196
    • /
    • 2005
  • Recently as map making skills developed and as digital maps prevailed, peoples began to take interest in the realistic 3dimension topography rather than the flat 2 dimension one. The experiment is done by using the topographical information from the digital maps, To analyze the preciseness of this 3dimension topography, analysis of the coordinate-changed standard map image and the location errors of the plane and height from digital values of the map's topography by layers and features, were done. The visual results of locational values differed by every programs of coordinate transformation. Errors of locations also appeared from the methods of correcting the visual sources, when deciding the standard source's datum point. The plan's accuracy of the image data coordinate transformation is about ${\pm}4.1m$. In ground distance, therefore, it is included in the allowed error of the 1:25,000 scale changed map, satisfying the plan's accuracy. Also, by the use of reasonably spaced grid, it satisfied the visual topographical accuracy. Because the 3 dimension topographical map can be produced effectively and rapidly by using various scale's standard map image and the digital map, the further practical use of 3 dimension topographic map made by using the existing topographies and changed maps has high expectations.

Cost Estimation Model for Introduction to Virtual Power Plants in Korea (국내 가상발전소 도입을 위한 비용 추정 모델)

  • Park, Hye-Yeon;Park, Sang-Yoon;Son, Sung-Yong
    • The Journal of Korea Institute of Information, Electronics, and Communication Technology
    • /
    • v.15 no.2
    • /
    • pp.178-188
    • /
    • 2022
  • The introduction of virtual power plants is actively being discussed to solve the problem of grid acceptability caused by the spread of distributed renewable energy, which is the key to achieving carbon neutrality. However, a new business such as virtual power plants is difficult to secure economic feasibility at the initial stage of introduction because it is common that there is no compensation mechanism. Therefore, appropriate support including subsidy is required at the early stage. But, it is generally difficult to obtain the cost model to determine the subsidy level because of the lack of enough data for the new business model. In this study, a survey of domestic experts on the requirements, appropriate scale, and cost required for the introduction of virtual power plants is conducted. First, resource composition scenarios are designed from the survey results to consider the impact of the resource composition on the cost. Then, the cost estimation model is obtained using the individual cost estimation data for their resource compositions using logistic regression analysis. In the case study, appropriate initial subsidy levels are analyzed and compared for the virtual power plants on the scale of 20-500MW. The results show that mid-to-large resource composition cases show 29-51% lower cost than small-to-large resource composition cases.