• Title/Summary/Keyword: government constructions

Search Result 74, Processing Time 0.025 seconds

Constructional Activities by the Buddhist Craftsmen of Bumeo-sa at Dongrae Province in the Late Period of Chosun Dynasty (조선후기(朝鮮後期) 범어사(梵魚寺) 승인공장(僧人工匠)의 동래지역(東萊地域) 조영활동(造營活動))

  • Seo, Chi Sang
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.39-52
    • /
    • 2003
  • The purpose of this study is to show the constructional activities conducted by the Buddhist craftsmen of Bumeo-sa, especially to focus on the government constructions at Dongrae province in the 1700s. The result is as follows: 1) In the early 1700s, Bumeo-sa developed to become a great Buddhist temple and was be able to possess a large number of workers and craftsmen. On the base of these workforce and skill, the Buddhist craftsmen of Bumeo-sa played the most leading roles for the government constructions until the late of 1700s. 2) Though the conditions of finance and workforce at Dongrae province were not good enough at that time, several huge government constructions could be promoted successively, owing to Bumeo-sa's supports. 3) Above all, the Buddhist craftsmen in Bumeo-sa monopolized the construction of Dongrae Hyangyo in the middle of the 1700s. But the private craftsmen got replaced their main roles in the government and temple constructions since the late of the 1700s.

  • PDF

The Problems and Reform Measures of Conflict Resolutions related to Constructions through ADR (ADR 에 의한 건설분쟁해결의 문제점과 개선방안)

  • Kim, Sang-Chan
    • Journal of Arbitration Studies
    • /
    • v.21 no.1
    • /
    • pp.87-107
    • /
    • 2011
  • There are two methods to resolve conflicts related to constructions which are through lawsuits and ADR (Alternative Dispute Resolution) just like any other conflicts. Along with the special characteristics pertaining to the conflicts related to constructions, the advantages that ADR is in possession of such as its cost, duration and professionalism, resolving conflicts through ADR has been considered to be more logical than any other options recently. In Korea's case at present, the resolution of conflicts regarding constructions through ADR is mostly dependent on administrative mediation or through arbitration. However, in the case of the administrative mediation, its usage rate is very low due to problems caused by problems in its running and effectiveness. In the case of arbitration, the services of the Korean Commercial Arbitration Board is comparatively used more but because of the fact that arbitration relies on a single trial system and the fact that its executive powers while having the same effectiveness as the final ruling does not get acknowledged leads to the phenomena of avoiding its usage. In addition, in relation to the selective arbitration clause, the problem of effectiveness of the arbitrative agreement is becoming a hindrance to the activation and promotion of the arbitration process. Furthermore, in the case where the ordering body is the government, the public servant involved in the case avoiding the arbitration process because of concerns of being penalized by the internal and external audit within the institution is becoming a problem as well. These problems are not only limited to conflicts regarding constructions and there needs to be actions taken to promote the activation of ADR by enacting a basic law. The more important issue at hand however is offering a resolution measure that would be the most appropriate for users and this could probably be done only through actions such as implementing the American partnering system or the dispute adjudication board system so that they can supervise the resolution of conflicts through mediation, arbitration, and assistance as well as offering consultations regarding conflicts related to constructions.

  • PDF

A Study on Operation Systems of Preservation & Repair Expenses for Architectural Heritage in Japanese Colonial Era - Focused on Classification of Preservation Cost Construction & Preservation Cost-Aided Construction - (일제강점기 「고건축물」 보존수리 공사비용 운용시스템에 관한 연구 - 「보존비공사」와 「보존비보조공사」 분류체계에 대하여 -)

  • Seo, Dong-Chun
    • Korean Journal of Heritage: History & Science
    • /
    • v.50 no.4
    • /
    • pp.82-103
    • /
    • 2017
  • Systems operating construction expenses for preservation and repair of the architectural heritage may be divided into two in the Japanese colonial era. They are preservation cost nd preservation cost-aided constructions, according to the ownership of a building. Preservation cost construction refers to preservation and repair of government-owned buildings that Japanese Government General of Korea had the ownership and the right of management, and preservation cost-aided construction means preservation and repair of private buildings such as Buddhist temples. In the case of preservation and repair of buildings owned by the government, it was done by the Japanese Government General of Korea, so the same agent executed the budget and managed the properties. They included royal tombs and relics, old government offices, Hyanggyo and some Seowon. On the other hand, in the case of preservation and repair of private buildings, they were private properties, so Japanese Government General of Korea had rights only for permission of preservation and repair. If there was a request for .preservation and repair by an owner, the Japanese Government General of Korea decided on whether it would support its expenses or not and played a role of management and supervision. It applied to Buddhist shrines and pagodas owned by Buddhist temples and shrines and temples owned by individuals and families. Hence, in the case of government-owned buildings, because the preservation cost was spent from the Japanese Government General of Korea's budget for investigation expenses of historical remains or repair expenses of Jeolleung and ruins, they were classified into preservation cost constructions. As for private buildings, the cost was spent from their budget for aiding preservation expenses, so they were classified into preservation cost-aided constructions. Because preservation cost construction and preservation cost-aided construction were conducted by two different agents, there were a little difference in procedures for executing a construction. There was no big difference in the general progress of constructions but was an administrative difference in the kinds of documents submitted and the roles of field supervisors. Such dual systems remained unimproved throughout the Japanese colonial era. The Japanese Government General of Korea was the colonial government so much influenced by the Japanese Government. Most Japanese architectural heritage was owned by Buddhist temples and Shinto shrines and there was almost no building owned by the government, resulting in a unitary system unlike Korea. Heritage system by the Japanese Government General of Korea was established under the influence of Japan regardless of the situation in Korea. Accordingly, Japanese Government General of Korea could not present a definite solution in the bisected system of preservation and repair expenses for the heritage. It shows the limits of the Japanese Government General of Korea in the colonial era.

A Study on the Supply System of Iron Materials and the Tools in Government Constructions in the Late of Joseon Dynasty (조선후기 관영건축공사에 있어서 철물과 철제 연장의 공급체계에 관한 연구 -영건의궤(營建儀軌) 기록을 중심으로-)

  • Lee, Kweon-Yeong;Kim, Wang-Jik
    • Journal of architectural history
    • /
    • v.16 no.3
    • /
    • pp.95-114
    • /
    • 2007
  • Since the 17th century, the society of Joseon dynasty belongs to a period of rapid transition in many fields. As the building is a result to be produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Especially, a study on the material supply system of economic base in a process of building construction is one of vely important factors in an understanding or estimate of a building. On the premise, this paper is to examine the supply system of iron materials and the tools in the construction of the government managed buildings in the late of Joseon dynasty on a viewpoint of productivity. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. 1) The general supply method of iron materials for a large-scale government construction was based on 'byulgong', that is, a kind of tribute. 2) Various methods were selected in the supply method of iron materials for government use in the late of Joseon dynasty. The priority order of choice in its government policy was put on an easiness of amount security, on a minimum of expenditure, and on an efficiency of construction execution. 3) The manufacturing technique of weaponry was used in the production method of iron materials and the tools for government use. The cooperation of the official, the army, and the merchant had improved the manufacturing technique of building construction.

  • PDF

A Study on the Existence of Lime Plaster Wall in the Joseon Dynasty, Based on the Analysis of Construction Reports of 'Sanleong-Uigwe' & 'Yeonggeon-Uigwe' - Emphasized on the Government Building Constructions - (산릉.영건의궤 분석을 통한 조선시대 건축에서 회벽의 존재 여부 고찰 -조선 후기 관영건축을 중심으로-)

  • Lee, Kweon-Yeong
    • Journal of architectural history
    • /
    • v.19 no.3
    • /
    • pp.89-106
    • /
    • 2010
  • Since the 1970's, UNESCO and ICOMOS have adopted or emphasized on the principles of historic preservation. One of them is what to require a repair should not be repaired beyond the limits of the features and techniques which had been adopted in those days of establishment. On the premise, this paper is to examine the materials and technique of wall plaster work in the government building constructions in the Joseon dynasty. The result of this examination shall come up with a basic conformity in the case of repairing the building established in the late of Joseon dynasty. This paper is carried out for the proper repair and restoration of architectural cultural properties. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. The materials and technique which applied to wall plaster work in those days were quite different from the present. The technique that was used to wall plaster of government buildings in those days was not a lime wall plaster, but sand coat one. The kinds of material for setting of the sand coat wall plaster had been revised with the change of the times or constructions. The main kinds of material were composed of sand, white clay, paper fiber, and cereal starch. However, the present materials were composed of sand, white clay. Therefore, the present materials and technique which applied to wall plaster work for the repair and restoration of architectural cultural properties have to be revised and corrected.

Drilled Shaft Designs and Constructions using Pile Load Tests at the Government-Financed Section of Incheon Bridge (재하시험을 활용한 인천대교 국고구간 현장타설말뚝의 설계와 시공)

  • Cho, Sung-Min;Jeon, Byeong-Seob;Chung, Il-Hwan;Choi, Go-Il
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.10a
    • /
    • pp.562-573
    • /
    • 2006
  • Incheon Bridge which will be the world's 5th long cable-stayed bridge in 2009 has been built under the management by Korea Highway Corporation. Incheon Bridge consists of several special-featured bridges and construction sections are divided into two groups, the private investment section with the foreign concessionaire and the government-financed section. 8 pile load tests were performed to investigate the behavior of rock-embedded large-diameter drilled shafts at both sections. Among these, 4 tests at the government-financed section have been utilized to adjust the detailed designs that were carried out individually as well as to find the actual bearing capacity of the ground prior to the commencement of constructions under the joint control of all contractors. Comprehensive procedures of the design and the construction of foundations using pile load tests were introduced.

  • PDF

A Study on the Procurement of Iron Materials and the Production of Ironwork in Constructions of Royal Tombs in the Later Joseon Period -Focused on Sanneung-uigwes- (조선후기 산릉공역의 철물 조달과 철제품 제작 -산릉의궤를 중심으로-)

  • Lee, Sang-Myeong
    • Journal of architectural history
    • /
    • v.25 no.5
    • /
    • pp.27-40
    • /
    • 2016
  • The purpose of this study was to comprehend the procurement system of iron materials and the production process of ironwork in royal tombs constructions in the later Joseon period. For this purpose, sixteen Sanneung-uigwes were analyzed. The following conclusions have been reached through the study. First, it was procuring five types of iron materials in constructions of royal tombs. Sincheol had been supplied up to the mid-18th century. On the other hand, the amount of jeongcheol was increased rapidly. Because of the procurement system of initial tools was changed from bokjeong(a kind of tribute) to self-production in the Noyaso. Second, the government stockpiles were utilized as much as possible than bokjeong to manage the limited construction period and sudden construction start. Third, before moving the site of tombs, the melting furnace was installed in the Gungisi(armament factory). The amount of the melting furnace was increased from 5 to 8 since producing the initial tools in the Noyaso. Fourth, six kinds of master artisans were worked in the field of producing ironwork. Metal worker was assigned to one person per melting furnace. Fifth, the quality of final iron materials was controlled by use. Since the 19th century, it had been produced enhanced ironwork.

Efficacy of Development Control as a Tool for Monitoring Building Developments in Kenya

  • Omollo, Wilfred Ochieng
    • Journal of Construction Engineering and Project Management
    • /
    • v.9 no.1
    • /
    • pp.1-17
    • /
    • 2019
  • This study examined the efficacy of development control in the monitoring of building developments in Kenya, a case study of Kisii Town. It focused on the extent to which the 1968 Building Code was enforced by the County Government of Kisii in an attempt to promote quality assurance. The target population comprised 7,430 residential developments from where a sample size of 364 was proportionately and randomly drawn. Research findings indicated that 39% of developers were unaware that their developments should have been inspected during construction. Similarly, awareness of building inspection significantly predicted if developers issued Notices of Inspection to the planning authority to facilitate inspections. Consequently, developers who were unaware that their building constructions required inspection were 99.9% less likely to issue such notices. Moreover, developers who did not obtain development permission were correspondingly 99.9% less likely to issue Inspection Notices. As a result, those who did not issue Notices of Inspection were 99.8% less likely to have their buildings inspected during construction due to lack of records indicating when such constructions had commenced. The study concludes that although the County Government of Kisii is lawfully mandated to monitor building developments in Kisii Town, the function is not well executed. This gap affords developers with an opportunity of not conforming to the approved building plans.

Improvement of Technical Proposal Tendering Evaluation Criteria for Small and Medium sized Construction Projects (중·소형 건설공사를 위한 기술제안입찰 평가기준 개선)

  • Yu, Jun-Hyeok;Hyun, Chang-Taek;Moon, Hyun-Seok;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.95-105
    • /
    • 2012
  • The government introduced the technical proposal drafting system in September 2007, as a new method to stimulate technical competence among construction companies to require ingenuity, creativity, artistic sense, and high-level technology. However, an examination of instances has shown that this system has been applied only to large scale constructions worth 30 billion won or more, and not to small and medium constructions worth less than 30 billion won. This is because the evaluation criteria of the system is structured in a manner that makes it difficult to apply to small and medium constructions. This study presented methods to improve the evaluation factors, categories, and scoring scheme of the technical proposal creation system for medium to small scale constructions to be able to further apply the current system to small and medium constructions. The technical proposal evaluation criteria presented in this study was significant in that it enabled the technical proposal creation system that was mainly used for large scale constructions to be further applied to medium to small scale constructions. And it also contributes to the establishment and settlement of a new technical proposal tendering for medium to small scale constructions.

A Study on the Time-periodic Characteristics of Multi-Family Housing in Cheongju (청주지역 공동주택의 시기별 특성에 관한 연구)

  • Han, Jo-Dong;Rhee, Kang-Hoon
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.3 no.3
    • /
    • pp.57-67
    • /
    • 2001
  • The evolution of multi-family housing in Cheongju can be divided by four stages which are a introduction period from 1972 to 1980, a popularization period from 1981 to 1989, a expansion period from 1990 to 1997, and a stagnation period after 1998. In the introduction period, the multi-family housings were mainly low-rise buildings because a government policy which focused on extension of the apartments for the low-income influenced multi-family housing constructions. During the popularization period, the multi-family housings were still low-rise but houses in various sizes were introduced. That was because the Housing Site Developments were started and private companies' participations followed them increasingly. As a result of vigorous participations of private companies and massive developments of housing sites, the multi-family housings in the expansion period started to show constructions of complex and trends of high density and high rising. Finally, in the stagnation period, a rate of the supply of the small houses, whose size was below $60m^2$ of exclusive, area was increased and extreme high-rise apartments emerged. High rising and density were the mainstream of the construction concepts. During this period, the growth of multi-family housing marked low. The reason was that a downturn in economy led private companies to shrink their constructions.

  • PDF