• Title/Summary/Keyword: government construction

Search Result 2,116, Processing Time 0.037 seconds

A Study on Direction of Regulation Policies by Classification of Government Regulation in Construction Industry;Focus on Subcontract or Specialty Contractor (정부규제의 유형분석을 통한 규제정책의 접근방법 연구;하도급 및 전문건설업을 중심으로)

  • Lee, Jong-Gwang;Jo, Sung-Yeon;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.440-443
    • /
    • 2006
  • The purpose of this study is to classify government regulations and to present the direction of regulation policy in korean construction industry with focus on subcontract or special contractor. The literature research and type analysis are adopted as research method. And the results of this study are as followed. The study has shown the type of government regulations related with subcontract or specialty contractor in korean construction industry. Also, Having shown the institutional function of the regulations in the market. And the study has presented the approach to reform government regulations in construction industry. First, government must recognize not only economic efficiency but also social equity as equivalent policy values. Second, government must evaluate the benefit and cost of policy group as regulations have changed. Third, government must analysis the functions and effects of regulation reform in comparison with existing regulation.

  • PDF

A study on the construction of government office in Dongnaebu at 19c (19세기 동래부(東萊府)의 관사영선(官舍營繕)에 관한 연구(硏究))

  • Kim, Sookyung;Kim, Soon il
    • Journal of architectural history
    • /
    • v.12 no.3
    • /
    • pp.87-100
    • /
    • 2003
  • This study is on the construction of government office of Dongnaebu through researching the construction reports and historical documents in 19century. Especially it focuses on the local construction system and operation for the government office. Main contents of the study are 1) Scope and process of construction, 2) Architectural administration and official notes, 3) Organization of participants and the feature, 4) Felling trees and transport, 5) Monetary of construction The results are summarized as follows. 1) Repair office customary were the courtesy new provincial man. Government building were inspected and repaired periodically. 2) Administrative system of construction have been operated. There are official notes which are about application, permition and order, concerned works such as logging at the bongsan, means of transport, paying wages and progressing works. 3) Organization of construction was made up of an officer and sangnee to supervise and supply. 4) Due to financial difficulty, local government reserved and appropriated funds with moneylending for building office.

  • PDF

PROGRAM MANAGEMENT STRATEGY FOR THE MaCC PROJECT

  • Boknam Lee;Wooyoung Kim;Seokin Choi;Hyounseung Jang;Bonsang Koo
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1582-1590
    • /
    • 2009
  • In 2006, Korean Government decided to relocate the several Government bodies and public institutes. They include total of 49 central Government agencies, semi-government agencies, and 17 national research institutes. The completion of the relocation program has been set to be final in 2030. The target population for the city plan is set to be 500,000. The goal of MAC is first to complete the first phase of the program by 2014 within the budget. In order to achieve the goal, considerable time has been spent to properly establish the program management system. The success of MAC's Multi-function Program Administration System is too early to determine as it is still in progressive. The success depends on the operations not the development.

  • PDF

Case Study of Local Government Homepage for Integrated Construction Information Management (건설정보공유를 위한 정부기관 통합 홈페이지 구축사례 연구)

  • Kang, Leen-Seok;Lee, Hong-Gi;Kim, Hyun-Soo;Kwon, Jung-Hui
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.563-566
    • /
    • 2006
  • Generally, integrated information of construction project is managed by government. However, homepage cases for operating each construction project by government are still unusual in the construction site. This study introduces a case study of construction project homepage for the integrated project information, and then suggests an improved functions that need in homepage for using construction information in common in local area. The homepage used in the study is operated by Gyeongsangnam-do. The results can be used as improved contents of construction project homepage by local government.

  • PDF

BIM IMPLEMENTATION STRATEGY AND TASKS FOR ARCHITECTURAL INDUSTRY IN KOREA

  • Ki Byung Yoon
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.88-92
    • /
    • 2011
  • Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.

  • PDF

A Study on the Supply System of Iron Materials and the Tools in Government Constructions in the Late of Joseon Dynasty (조선후기 관영건축공사에 있어서 철물과 철제 연장의 공급체계에 관한 연구 -영건의궤(營建儀軌) 기록을 중심으로-)

  • Lee, Kweon-Yeong;Kim, Wang-Jik
    • Journal of architectural history
    • /
    • v.16 no.3
    • /
    • pp.95-114
    • /
    • 2007
  • Since the 17th century, the society of Joseon dynasty belongs to a period of rapid transition in many fields. As the building is a result to be produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Especially, a study on the material supply system of economic base in a process of building construction is one of vely important factors in an understanding or estimate of a building. On the premise, this paper is to examine the supply system of iron materials and the tools in the construction of the government managed buildings in the late of Joseon dynasty on a viewpoint of productivity. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. 1) The general supply method of iron materials for a large-scale government construction was based on 'byulgong', that is, a kind of tribute. 2) Various methods were selected in the supply method of iron materials for government use in the late of Joseon dynasty. The priority order of choice in its government policy was put on an easiness of amount security, on a minimum of expenditure, and on an efficiency of construction execution. 3) The manufacturing technique of weaponry was used in the production method of iron materials and the tools for government use. The cooperation of the official, the army, and the merchant had improved the manufacturing technique of building construction.

  • PDF

Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam

  • Kim, Soo-Yong;Nguyen, Viet Thanh;Luu, Van Truong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.161-165
    • /
    • 2015
  • The delay in construction is the challenge often faced in the course of executing construction projects. To the government projects, the delays become very serious. This problem directly affects the lives, social welfare of the people, and the other negative social impacts. However, the government projects have not been much interest. The questionnaire surveys in Vietnam were conducted to determine the causes of the delay and to find solutions for dealing with the delay. The average index was used to rank the delay factors and the solutions. This study identified the 5 most highly ranked delay factors and the 8 best solutions from a list of 31 delay factors and 19 solutions for the delay. The five most highly ranked delay factors were: information delays and lack of information exchange between the parties; incompetent owner; incompetent supervision consultant; incompetent contractor; and difficulties in financing project by owner. The findings of the study can help the parties involved the government construction projects and practitioners to give appropriate strategies for countering the delay in their projects.

  • PDF

Perception and Evaluation of Construction Management Firms toward Government Policies for Construction Management (CM정책에 대한 CM기업의 인식과 평가에 관한 연구)

  • Jo, You Gyeong;Kim, Han Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.62-69
    • /
    • 2014
  • Since a government policy greatly affects markets and firms, an evaluation on government's policies is recognized as a critical issue. In Korea, two major policy plans on CM(Construction Management) include the Construction Industry Promotion Plan and the Construction Technology Promotion Plan from which Government's CM policies can be understood. The objective of the study is to analyze and discuss CM firm's perception and evaluation toward the Government's CM policies of the two plans based on the Gap analysis. The paper identified that the CM firms perceive that the Government's CM policies properly deal with key issues of the industry. However, they evaluate that the execution of the policies has been overall under-performed. As a way forward, the Government needs to improve on the execution plan and performance measurement rather than to develop new policy agenda.

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site. (소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출)

  • Baek, Nak-Ku;Lee, Mi-Hyeon;Lim, Houng-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF