• 제목/요약/키워드: government construction

검색결과 2,116건 처리시간 0.031초

정부규제의 유형분석을 통한 규제정책의 접근방법 연구;하도급 및 전문건설업을 중심으로 (A Study on Direction of Regulation Policies by Classification of Government Regulation in Construction Industry;Focus on Subcontract or Specialty Contractor)

  • 이종광;조승연;김용수
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.440-443
    • /
    • 2006
  • The purpose of this study is to classify government regulations and to present the direction of regulation policy in korean construction industry with focus on subcontract or special contractor. The literature research and type analysis are adopted as research method. And the results of this study are as followed. The study has shown the type of government regulations related with subcontract or specialty contractor in korean construction industry. Also, Having shown the institutional function of the regulations in the market. And the study has presented the approach to reform government regulations in construction industry. First, government must recognize not only economic efficiency but also social equity as equivalent policy values. Second, government must evaluate the benefit and cost of policy group as regulations have changed. Third, government must analysis the functions and effects of regulation reform in comparison with existing regulation.

  • PDF

19세기 동래부(東萊府)의 관사영선(官舍營繕)에 관한 연구(硏究) (A study on the construction of government office in Dongnaebu at 19c)

  • 김숙경;김순일
    • 건축역사연구
    • /
    • 제12권3호
    • /
    • pp.87-100
    • /
    • 2003
  • This study is on the construction of government office of Dongnaebu through researching the construction reports and historical documents in 19century. Especially it focuses on the local construction system and operation for the government office. Main contents of the study are 1) Scope and process of construction, 2) Architectural administration and official notes, 3) Organization of participants and the feature, 4) Felling trees and transport, 5) Monetary of construction The results are summarized as follows. 1) Repair office customary were the courtesy new provincial man. Government building were inspected and repaired periodically. 2) Administrative system of construction have been operated. There are official notes which are about application, permition and order, concerned works such as logging at the bongsan, means of transport, paying wages and progressing works. 3) Organization of construction was made up of an officer and sangnee to supervise and supply. 4) Due to financial difficulty, local government reserved and appropriated funds with moneylending for building office.

  • PDF

PROGRAM MANAGEMENT STRATEGY FOR THE MaCC PROJECT

  • Boknam Lee;Wooyoung Kim;Seokin Choi;Hyounseung Jang;Bonsang Koo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1582-1590
    • /
    • 2009
  • In 2006, Korean Government decided to relocate the several Government bodies and public institutes. They include total of 49 central Government agencies, semi-government agencies, and 17 national research institutes. The completion of the relocation program has been set to be final in 2030. The target population for the city plan is set to be 500,000. The goal of MAC is first to complete the first phase of the program by 2014 within the budget. In order to achieve the goal, considerable time has been spent to properly establish the program management system. The success of MAC's Multi-function Program Administration System is too early to determine as it is still in progressive. The success depends on the operations not the development.

  • PDF

건설정보공유를 위한 정부기관 통합 홈페이지 구축사례 연구 (Case Study of Local Government Homepage for Integrated Construction Information Management)

  • 강인석;이홍기;김현수;권중희
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.563-566
    • /
    • 2006
  • 일반적으로 건설정보 통합제공은 정부차원으로 이루어지고 있으며, 전국의 산재된 현장을 관리하고 통합된 건설정보를 제공하는 정부차원의 홈페이지 구축은 미흡한 것으로 판단된다. 본 연구는 지자체 최초로 구축하고 운영되고 있는 경상남도 건설정보 통합 홈페이지 구축사례를 소개하며, 이를 통하여 건설정보 홈페이지가 갖추어야 할 기본적 기능을 제시한다. 또한 유사 건설관련 홈페이지의 컨텐츠 비교분석을 통해 건설정보를 통합적으로 제공하기 위한 주요 요구정보를 파악하였다. 본 연구에서는 향후 유사 사이트 구성을 위한 개선사항을 제안하며, 이러한 결과는 정부기관 건설정보 공유를 위한 기반정보로 활용될 수 있다.

  • PDF

BIM IMPLEMENTATION STRATEGY AND TASKS FOR ARCHITECTURAL INDUSTRY IN KOREA

  • Ki Byung Yoon
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.88-92
    • /
    • 2011
  • Even though attempts are made to transform from 2D CAD to BIM representation for building design and construction, it were not so successful for practical implementation until recently in construction industry in Korea. However, there is a dramatic change for the use of BIM by collaboration among government, independent organizations as well as industry itself. Government reckons that BIM is an important tool for environment friendly construction and industry competitiveness. The government not only makes national BIM standards and push policies in order to make market environment. Independent organizations such as BuildingSMART Korea does active role to stimulate the transformation process successfully. They act as opinion leaders for the Government to consider BIM implementation for industry competitiveness issue. They make roadmap as well as technical standards and guidelines. It also leads technical developments and supports for its implementation. Government supports researches for the implementation of BIM. The research includes BIM standards, guidelines, linking with existing Architectural Administrative Information Systems, making libraries as well as education. Government makes policy for BIM as a compulsory data for bidding process of newly designed government buildings. Private sector not only agrees BIM as a tool to adapt but also essential methods for its survival in domestic and foreign construction market. Architectural design companies and constructions companies currently develop technical skills and implement BIM for new projects such as Dongdaemoon Plaza that cannot be successfully drawn by conventional methods.

  • PDF

조선후기 관영건축공사에 있어서 철물과 철제 연장의 공급체계에 관한 연구 -영건의궤(營建儀軌) 기록을 중심으로- (A Study on the Supply System of Iron Materials and the Tools in Government Constructions in the Late of Joseon Dynasty)

  • 이권영;김왕직
    • 건축역사연구
    • /
    • 제16권3호
    • /
    • pp.95-114
    • /
    • 2007
  • Since the 17th century, the society of Joseon dynasty belongs to a period of rapid transition in many fields. As the building is a result to be produced on the basis of a society and economy, the general transition in a society is to be reflected into a process of building construction. Especially, a study on the material supply system of economic base in a process of building construction is one of vely important factors in an understanding or estimate of a building. On the premise, this paper is to examine the supply system of iron materials and the tools in the construction of the government managed buildings in the late of Joseon dynasty on a viewpoint of productivity. Construction reports and other documents in those days are examined for the study. Following conclusions have been reached through the study. 1) The general supply method of iron materials for a large-scale government construction was based on 'byulgong', that is, a kind of tribute. 2) Various methods were selected in the supply method of iron materials for government use in the late of Joseon dynasty. The priority order of choice in its government policy was put on an easiness of amount security, on a minimum of expenditure, and on an efficiency of construction execution. 3) The manufacturing technique of weaponry was used in the production method of iron materials and the tools for government use. The cooperation of the official, the army, and the merchant had improved the manufacturing technique of building construction.

  • PDF

Delay Factors Affecting the Completion of the Government Construction Projects in Vietnam

  • Kim, Soo-Yong;Nguyen, Viet Thanh;Luu, Van Truong
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.161-165
    • /
    • 2015
  • The delay in construction is the challenge often faced in the course of executing construction projects. To the government projects, the delays become very serious. This problem directly affects the lives, social welfare of the people, and the other negative social impacts. However, the government projects have not been much interest. The questionnaire surveys in Vietnam were conducted to determine the causes of the delay and to find solutions for dealing with the delay. The average index was used to rank the delay factors and the solutions. This study identified the 5 most highly ranked delay factors and the 8 best solutions from a list of 31 delay factors and 19 solutions for the delay. The five most highly ranked delay factors were: information delays and lack of information exchange between the parties; incompetent owner; incompetent supervision consultant; incompetent contractor; and difficulties in financing project by owner. The findings of the study can help the parties involved the government construction projects and practitioners to give appropriate strategies for countering the delay in their projects.

  • PDF

CM정책에 대한 CM기업의 인식과 평가에 관한 연구 (Perception and Evaluation of Construction Management Firms toward Government Policies for Construction Management)

  • 조유경;김한수
    • 한국건설관리학회논문집
    • /
    • 제15권1호
    • /
    • pp.62-69
    • /
    • 2014
  • 정부정책은 시장과 기업에 많은 영향력을 행사하기 때문에 정부정책에 대한 평가는 중요한 현안이다. 현재 우리나라에서 CM정책을 제시하는 대표적인 자료는 건설산업기본계획과 건설기술진흥기본계획으로 이를 통해 정부의 CM정책을 이해할 수 있다. 본 연구의 목적은 제3차 건설산업기본계획과 제4차 건설기술진흥기본계획에 제시된 CM정책항목을 중심으로 CM정책에 대한 CM기업의 인식과 평가를 Gap 분석기법을 활용하여 중요도와 실행도의 관점에서 분석하고 주요 특징 및 시사점을 도출하는데 있다. 본 연구를 통해 나타난 주요 결과는 정부가 제시한 CM정책항목에 대해서는 전반적으로 중요하다고 CM기업이 인식하고 있는 반면 실행도에 대해서는 낮은 평가를 내리고 있다는 것이다. 향후 정부는 새로운 CM정책항목의 발굴보다는 이미 발굴되어 있는 CM정책항목의 이행전략과 성과점검에 보다 노력을 경주할 필요가 있는 것으로 나타났다.

건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案) (The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work)

  • 최병주;최현;최석우;김옥규
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

소규모 건설현장의 재해저감을 위한 정부지원 사업 분석 및 개선요구사항 도출 (Analysis and Improvement Plan of Government Support Project for Reducing Disaster in Small Construction Site.)

  • 백낙규;이미현;임형철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2018년도 춘계 학술논문 발표대회
    • /
    • pp.116-117
    • /
    • 2018
  • The government and the Korea Occupational safety & Health Agency have continuously carried out safety activities such as supervision, inspection, technical guidance and financial support in order to reduce safety accidents at the construction site. However, the number of disasters at construction sites is increasing every year. So analyze the results of the supervision and inspection of the Ministry of Employment and Labor, the projects related to the small-scale construction work of the Safety and Health Corporation, and the technical guidance project of the disaster prevention technology guidance organization. It is also necessary to establish an improvement plan for the disaster reduction of the small-scale construction work site for this project.

  • PDF