• Title/Summary/Keyword: geotechnical monitoring

Search Result 361, Processing Time 0.024 seconds

High-Current Time-Lapse Electrical Imaging in Marine Sediments Area (해성퇴적층 하부지반 대전류 time-lapse 전기탐사)

  • Jung, Hyun-Key;Geo, Dong-Kweon Lee
    • 한국지구물리탐사학회:학술대회논문집
    • /
    • 2006.06a
    • /
    • pp.109-112
    • /
    • 2006
  • Successful field test results for high-current time-lapse electrical imaging in marine sediments area are discussed. Because field trial by commercially available equipments were failed, self-developed system which supports transmitting current up to 5 ampere was used. Some weak zones due to local fractures were detected, but the weak zone effect in this area by time-lapse measurements from sea level change was minor.

  • PDF

Development of automatic alert populating system of earth structures based on sensor monitoring (센서 모니터링을 활용한 토류구조물 상황전파 자동화 시스템 개발)

  • Kim, Yong-Su;Ahan, Sang-Ro;Jung, Jae-Hyun;Han, Sang-Jea;Jung, Seung-Yong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.667-672
    • /
    • 2009
  • Gathering information and systemization of infrastructure disaster management is to reduce uncertainties in making decisions and maximize the number of alternations. The key objects of a sensor-based progress report and propagation automation systems are to provide objective data, realize and support decision making and deliver them to a certain area, department, manager and other people rapidly. The major findings and results of this study are as follows. 1) Application of international standard-based alerting protocol(CAP; Common Alerting Protocol). 2) Development of database of existing progress report and propagation manual in order to achieve networking of safety management on major social infrastructure of the nation. 3) Development middleware application programs to progress report and propagation data using SMS, FAX, EMS, VMS, MMS.

  • PDF

Application of electrical leakage detection method for waste landfill (매립지 누출위치 실시간 파악을 위한 전극검지법의 적용 사례)

  • Han, Sang-Jae;Kim, Byung-Il;Hong, Kang-Han;Jung, Jae-Hyun;Kim, Soo-Sam
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.798-804
    • /
    • 2009
  • Damaged liners may be detected by using leakage detection systems. For the reason, many types of leakage detection systems are applied to analyze or detect damages of lining system such as electrical detection method for the landfill sites. However, most of them can be applied in the new landfill construction sites because sensors should be installed in the bottom of liner systems. This paper shows a case study reviewing the development of a fence type leakage detection method, monitoring system and pilot plant test results, so that they can be economically and efficiently applied to actual used or in-use sites without a leakage detection system.

  • PDF

Numerical approach on relationship between deformation of artificial crack and stress acting on tunnel shotcrete lining (인공균열 주위의 변형과 터널 숏크리트 라이닝 응력간의 상관관계에 대한 수치해석적 검토)

  • Shin, Hyu-Soung;Kwon, Young-Cheul;Bae, Gyu-Jin;Kim, Kyung-Shin;Kim, Hong-Taek
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.64-71
    • /
    • 2009
  • The stresses acting on shotcrete lining of tunnel have been measured virtually by monitoring instruments installed during construction. However, the malfunction of instrument and the lack of consistency of signal have always been controversial, but re-installation of instrument after construction of tunnel lining is practically impossible. Therefore, authors have carried out the study to develop a new technique for estimating the stress acting on shotcrete lining during and after construction. In the technique, stresses of shotcrete lining can be estimate by the measurement of deformation of free face. Therefore, the relationships between the stresses of shotcrete lining and deformation of free surface are indispensable factor. In this paper, the parametric study using 2D FEM analysis was carried out to estimate the relationships between the stress level acting on the tunnel shotcrete lining and the deformation near the free face (e.g. artificial crack in this study). The distribution of stresses of shotcrete lining is also investigated in this study as the preliminary investigation for the large-scale tunnel lining test and detailed 3D FEM analysis.

  • PDF

Lesson and proposal of revised equations from the Pan method application case for soft clay improvement (PBD 공법 시공사례를 통한 교훈 및 개선안 제안)

  • 유한구;조영묵;김종석;박정규
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2001.10a
    • /
    • pp.147-158
    • /
    • 2001
  • In general, two methods have been used to predict settlement of soft ground. One method is Terzaghi's one dimensional consolidation theory which gives time-settlement relationship using the standard consolidation test results. The other is forecasting method of ground settlement to be occured in the future using in-situ monitoring data. The above both methods have some defects in application manner or in itself especially in very deep and soft clayey ground. In view of the lessons and experiences of soft ground improvement projects, several techniques were proposed for more accurate theorectical calculation of consolidation settlement as follows ; ① Subdivision of soft ground, ② Consideration of secondary compression, ③ Using the modified compression index, etc. And also, revised hyperbolic fitting method was suggested to minimize the error of predicted future settlement. In addition, revised De-Beer equation of immediate settlement of loose sandy soil was proposed to overcome the tendency to show too small settlement calculation results by original De-Deer equation. And also, considering the various effects of settlement delay in the improved ground by vertical drains, time-settlement caculation equation(Onoue method) was revised to match the tendency of settlement delay by using the characteristics of discharge capacity decreases of vertical drain with time elapse by the pattern of hyperbolic equation.

  • PDF

Application of Copper Slag as Sand Substitute in SCP Pilot tests (SCP 현장시험시공을 통한 동슬래그의 모래대체재로서의 적용성 연구)

  • 천병식;정헌철;김경민
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.613-620
    • /
    • 2002
  • Sand Compaction Pile(SCP) is a soil improvement method that a sand charge is introduced into the pipe, and the pipe is withdrawn part away while the sand pile is compacted and its diameter is enlarged. The sand used in this method should be of good quality. In Korea, crushed stone and washed sea sand are used frequently in SCP. However, use of these materials is restricted because of environmental problem and deficiency of supply. In the copper smelting process, about 0.7 million tons of copper slag are produced in Korea. The range of particle size distribution of copper slag is from 0.15mm to 5mm, so it can be a substitute for sand, and the relatively high specific gravity compared with the sand, is its characteristic. Copper slag is hyaline and so stable environmentally that in foreign country, such as Japan, Germany etc., it is widely used in harbor, revetment and offshore structure construction works. Therefore, in this study, the several laboratory tests were peformed to evaluate the applicability of copper slag as a substitute for sand of SCP. From the mechanical property test, the characteristics of sand and copper slag were compared and analyzed, and from laboratory model test, the strength of composite ground was compared and analyzed by monitoring the stress and ground settlement of clay, SCP and copper slag compaction pile. Specially, this study focused on the application of copper slag as sand substitute in SCP pilot tests based on laboratory tests results.

  • PDF

A Study on mine drainage characteristcs as abandoned Coal mine in Gyeongsang province (경상도 일대의 폐탄광 갱내수의 수질 특성 연구)

  • Jung, Young-Kook;Hong, Ji-Hye;Lee, Dong-Jin;Kim, Jeong-Phill;Kim, Dae-Gi;Joo, Sang-Don
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1440-1445
    • /
    • 2008
  • There are 21 abondoned coal mines drained out mine water in gyeong sang do. We monitored the water quality of 31 mine drainage from 1995. The most of mine drainage was neutral as the average pH was 6.22 and Fe, Mn, Al concentration was below 10mg/L. The result showed the tendency of decreasing of flow and metal concentration. The highest Mn concentration was detected in bonghwa area and the hightest Fe concentration was detected in munkyung area. It means that the water quality is closly related to geological features.

  • PDF

Analysis of Real-time monitoring system for The national road cut slope (국도 절토사면 상시계측시스템 현황분석)

  • Shin, Chang-Gun;Kim, Youl;Lee, Jang-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.921-929
    • /
    • 2008
  • 도로절토사면을 지속적으로 관리함에도 불구하고 집중호우 시 도로절토사면 붕괴로 인한 피해가 속출하고 있다. 이러한 절토사면 붕괴에 의한 피해를 최소화 하기위해 각종 신공법들이 개발, 도입되고 있으며 IT와 접목된 상시계측시스템도 많은 현장에 적용되고 있다. 국토해양부 각 지방국토관리청 산하 국도관리사무소에서 관리중인 절토사면 중 현재 상시계측시스템을 운용하고 있는 현장은 총 93개소이며 이들 현장들에 문제가 발생할 시 즉각적으로 경보시스템이 작동하여 붕괴에 의한 피해를 최소한으로 줄일 수 있다. 또한 시스템 작동에 차질이 없도록 정기적인 현장 점검이 이루어지고 있으며 2008년 3월경에 한국건설기술연구원, 한국시설안전공단, (주)GMG에서 합동현장조사를 실시하였다. 이 현장조사 결과를 토대로 전국국도 상시계측시스템의 현황 및 특성, 상시계측시스템의 문제점 및 개선방향에 대하여 분석하였다. 이에 본 연구에서는 전국 국도 사면 중 상시계측 시스템이 설치된 현장에 대하여 암종별, 규모별, 지역별로 분석을 실시하였으며 특히 상시계측시스템이 설치된 현장 중 붕괴발생현장 및 붕괴위험 현장에 대하여 붕괴특성분석, 유지관리 사례분석 등을 실시하였다.

  • PDF

A Case Study on the Field Monitoring of the Deep Rock Excavation Site in Urban Area (도심지 대심도 암반 굴착현장에서의 Face Mapping 적용사례)

  • Kim, Tae-Seob;Kim, Hyung-Min;Jo, Choong-Sick;Kang, Tae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1307-1316
    • /
    • 2009
  • In this case, powerfulness quorum of destruction side which we have expected are supposed general limit value for rock floor when retaining of earth on the section of rock floor in the urban area. For digging in the urban area, there are a lot of dislocations to be disadvantage for safety of digging ants. The displacement of the pondside didn't converged with the phase of the excavation. Also, the speed of displacement got higher than the percentages of risk in the construction. So, we put into operation Face mapping for checking special quality of dislocations which appear on the digging ants. This results were used to decide a destruction in the case of the final excavation by analyzing with other results. It was possible to know the unstable distribution of a fault line in Face Mapping and to get powerful lens of a surface of discontinuity by tests indoors and outdoors. The results were also used to make a solution. Therefore, It's a successful example using the Partial TopDown for stable digging. And it is important that Face Mapping have to be practiced for solving the uncertainty of ground organization when digging design in the urban city.

  • PDF

A Study to Develop Optimal Injection System Using ISIS(the In-situ Soil Injection Simulator) (ISIS 시스템을 이용한 최적 그라우팅 시스템 개발 연구)

  • 천병식;김진춘;김경민;이민호;이정훈;김진수;박종근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.619-626
    • /
    • 2002
  • In this study, a correlation among pressure, time and quantity of injection was organized from the laboratory tests, which were executed many times representing in-situ soil conditions carefully and then it would be applied to the in-situ soil injection simulator which will be developed for optimal injection into the ground. The sort of sample soils were both sand(A specimen) and silty sand(B specimen). Injection tests were gone into operation by compaction state, injection velocity and the depth individually. In the ground improved with permeation Infection, the relation among injection pressure of the same depth, the injected quantities and time were systematic by the depth. By defining the limit range of injection pressure and quantity about the variety of a linear equation obtained from lining each of their trend, the application of laboratory injection monitoring program and the data to evaluate its realization were produced. In the ground improved with root type injection, the relation between injection pressure and the injected quantities was irregular because fracture state occurred quickly.

  • PDF