• Title/Summary/Keyword: geotechnical application

Search Result 866, Processing Time 0.03 seconds

Geotechnical Engineering Progress with the Incheon Bridge Project

  • Cho, Sung-Min
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.133-144
    • /
    • 2009
  • Incheon Bridge, 18.4 km long sea-crossing bridge, will be opened to the traffic in October 2009 and this will be the new landmark of the gearing up north-east Asia as well as the largest & longest bridge of Korea. Incheon Bridge is the integrated set of several special featured bridges including a magnificent cable-stayed girder bridge which has a main span of 800 m width to cross the navigation channel in and out of the Port of Incheon. Incheon Bridge is making an epoch of long-span bridge designs thanks to the fully application of the AASHTO LRFD (load & resistance factor design) to both the superstructures and the substructures. A state-of-the-art of the geotechnologies which were applied to the Incheon Bridge construction project is introduced. The most Large-diameter drilled shafts were penetrated into the bedrock to support the colossal superstructures. The bearing capacity and deformational characteristics of the foundations were verified through the world's largest static pile load test. 8 full-scale pilot piles were tested in both offshore site and onshore area prior to the commencement of constructions. Compressible load beyond 30,000 tonf pressed a single 3 m diameter foundation pile by means of bi-directional loading method including the Osterberg cell techniques. Detailed site investigation to characterize the subsurface properties had been carried out. Geotextile tubes, tied sheet pile walls, and trestles were utilized to overcome the very large tidal difference between ebb and flow at the foreshore site. 44 circular-cell type dolphins surround the piers near the navigation channel to protect the bridge against the collision with aberrant vessels. Each dolphin structure consists of the flat sheet piled wall and infilled aggregates to absorb the collision impact. Geo-centrifugal tests were performed to evaluate the behavior of the dolphin in the seabed and to verify the numerical model for the design. Rip-rap embankments on the seabed are expected to prevent the scouring of the foundation. Prefabricated vertical drains, sand compaction piles, deep cement mixings, horizontal natural-fiber drains, and other subsidiary methods were used to improve the soft ground for the site of abutments, toll plazas, and access roads. Light-weight backfill using EPS blocks helps to reduce the earth pressure behind the abutment on the soft ground. Some kinds of reinforced earth like as MSE using geosynthetics were utilized for the ring wall of the abutment. Soil steel bridges made of corrugated steel plates and engineered backfills were constructed for the open-cut tunnel and the culvert. Diverse experiences of advanced designs and constructions from the Incheon Bridge project have been propagated by relevant engineers and it is strongly expected that significant achievements in geotechnical engineering through this project will contribute to the national development of the longspan bridge technologies remarkably.

  • PDF

Evaluation of Lateral Flow in Soft Ground under Embankment (성토하부 연약지반의 측방유동 평가)

  • Hong, Won-Pyo;Cho, Sam-Deok;Lee, Jae-Ho;Lee, Kwang-Wu
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.10
    • /
    • pp.93-100
    • /
    • 2006
  • The lateral soil movement in soft grounds undergoing improvement with application of vertical drains is analyzed on the basis of monitoring data at three fields, in which fifty six monitoring sites are located. Based on the investigations, the criterions are suggested to predict the lateral soil movement. In order to predict the lateral soil movement in the improved soft grounds by using the dimensionless parameter R suggested by Marche & Chapuis (1974), it is desirable that the maximum lateral displacement in the soft ground below the toe of embankment should be applied to calculate R instead of the lateral displacement at the toe of embankment. The lateral soil movement may increase rapidly, if the safety factor of slope is less than 1.4 in case of high ratio of H/B (Thickness of soft ground/Embankment width) such as 1.15 or is less than 1.2 in case of low ratio of H/B such as 0.05. Also, the graph suggested by Tschebotarioff (1973), which illustrates the relationship between the maximum height of embankments and the undrained shear strength of soft grounds, can be applied to the evaluation for the possibility of the lateral soil movement due to embankments on soft grounds.

Development of Risk Analysis Structure for Large-scale Underground Construction in Urban Areas (도심지 대규모 지하공사의 리스크 분석 체계 개발)

  • Seo, Jong-Won;Yoon, Ji-Hyeok;Kim, Jeong-Hwan;Jee, Sung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.26 no.3
    • /
    • pp.59-68
    • /
    • 2010
  • Systematic risk management is necessary in grand scaled urban construction because of the existence of complicated and various risk factors. Problems of obstructions, adjacent structures, safety, environment, traffic and geotechnical properties need to be solved because urban construction is progressed in limited space not as general earthwork. Therefore the establishment of special risk management system is necessary to manage not only geotechnical properties but also social and cultural uncertainties. This research presents the technique analysis by the current state of risk management technique. Risk factors were noticed and the importance of each factor was estimated through survey. The systemically categorized database was established. Risk extraction module, matrix and score module were developed based on the database. Expected construction budget and time distribution can be computed by Monte Carlo analysis of probabilities and influences. Construction budgets and time distributions of before and after response can be compared and analyzed 80 the risks are manageable for entire whole construction time. This system will be the foundation of standardization and integration. Procurement, efficiency improvement, effective time and resource management are available through integrated management technique development and application. Conclusively decrease in cost and time is expected by systemization of project management.

Estimation of Weight Distribution of Rockfall Block by Joint Measurement And Study on Its Application to Rockfall Simulation (절리조사결과에 의한 현장 낙석무게분포추정 및 추정결과의 낙석시뮬레이션 적용성 검토)

  • Kim, Dong-Hee;Ryu, Dong-Woo;Kim, Su-Chul;Yoon, Sang-Kil;Lee, Woo-Jin
    • Journal of the Korean Geotechnical Society
    • /
    • v.23 no.11
    • /
    • pp.67-76
    • /
    • 2007
  • The characteristics of rockfall are determined by virtually all factors and conditions e.g. the physical figure of the slope such as inclination, height, roughness, the elemental figure of the slope such as vegetation and material deposited, and the shape and weight of the rockfall itself. Although it is one of the major factors to be considered in rockfall simulation, little attention has been given to the weight of the rockfall. And, since the size of the rockfall is dominated by joint spacing, the distribution of the rockfall block weight can be predicted as a function of the joint spacing. In this study, the weight distribution of rockfall was estimated by using the method of volumetric joint count, $J_{\nu}$, based on joint spacing, and $RQD-J_{\nu}$. The results indicate that the weight distributions were analogous in two methods, and the distribution was to be $75.3{\sim}76.7%$ for 200 kilograms or lesser, $15.0{\sim}16.6%$ for $200{\sim}400$ kilograms, and $6.7{\sim}9.7%$ for 400 kilograms or more, which show good matches with the actual on-site weight distribution. Therefore, the weight distribution of rockfall suggested in this paper is able to be considered as appropriate data for rockfall simulation.

Deep Learning based Estimation of Depth to Bearing Layer from In-situ Data (딥러닝 기반 국내 지반의 지지층 깊이 예측)

  • Jang, Young-Eun;Jung, Jaeho;Han, Jin-Tae;Yu, Yonggyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.3
    • /
    • pp.35-42
    • /
    • 2022
  • The N-value from the Standard Penetration Test (SPT), which is one of the representative in-situ test, is an important index that provides basic geological information and the depth of the bearing layer for the design of geotechnical structures. In the aspect of time and cost-effectiveness, there is a need to carry out a representative sampling test. However, the various variability and uncertainty are existing in the soil layer, so it is difficult to grasp the characteristics of the entire field from the limited test results. Thus the spatial interpolation techniques such as Kriging and IDW (inverse distance weighted) have been used for predicting unknown point from existing data. Recently, in order to increase the accuracy of interpolation results, studies that combine the geotechnics and deep learning method have been conducted. In this study, based on the SPT results of about 22,000 holes of ground survey, a comparative study was conducted to predict the depth of the bearing layer using deep learning methods and IDW. The average error among the prediction results of the bearing layer of each analysis model was 3.01 m for IDW, 3.22 m and 2.46 m for fully connected network and PointNet, respectively. The standard deviation was 3.99 for IDW, 3.95 and 3.54 for fully connected network and PointNet. As a result, the point net deep learing algorithm showed improved results compared to IDW and other deep learning method.

Statistical Analysis of Geometric Parameters and Rock Conditions of Pick Cutters for Roadheaders (로드헤더용 픽커터의 형상변수와 암반조건에 대한 통계적 분석)

  • Soo-Ho Chang;Tae-Ho Kang;Chulho Lee;Soon-Wook Choi
    • Tunnel and Underground Space
    • /
    • v.33 no.5
    • /
    • pp.414-424
    • /
    • 2023
  • In this study, a total of 326 data on a variety of geometric parameters of pick cutters and the corresponding cuttable rock conditions were collected and built as a database. Statistical analysis of the database showed that there is a significant positive correlation between the parameters that define the geometry of a pick cutter, especially between the parameters related to the length of a pick cutter and the geometry of a tungsten carbide insert. The diameter of a pick cutter shaft was also strongly correlated with the geometry of the inserts. On the other hand, it was difficult to find a clear correlation between the parameters for the rock conditions defined by the four conditions and the geometric parameters of pick cutters, which may be due to the uncertainty of the rock mass and the fact that the application of a pick cutter is presented as a range rather than a numerical single value. However, the mean values of geometric parameters of pick cutters tend to increase as a rock mass becomes harder. However, the pick length parameters are found to decrease as a rock mass becomes harder, which may be a way to reduce the moments that can occur when using long pick cutters in a hard rock condition.

Development and Application of TDR Penetrometer for Evaluation of Soil Water Content of Subsoil (지반의 함수비 평가를 위한 관입형 TDR 프로브의 개발 및 적용)

  • Hong, Won-Taek;Jung, Young-Seok;Lee, Jong-Sub;Byun, Yong-Hoon
    • Journal of the Korean Geotechnical Society
    • /
    • v.31 no.2
    • /
    • pp.39-46
    • /
    • 2015
  • Dielectric constant depends on the variation of soil water content, and the estimation of soil water content using time domain reflectometry (TDR) has been studied by many researchers. The purpose of this study is the development and application of TDR penetrometer (TDRP) in order to evaluate the soil water content according to the penetration depth. The TDRP consists of cone, sleeve, driving rod, hammer, and guide. Three electrodes, which are used to measure the dielectric constant of soils, are mounted on the surface of sleeve and, in turn, connected with coaxial cable and time domain reflectometer. To establish the relationship between the volumetric water content and dielectric constant, several laboratory tests by using the TDRP are performed in the specimens with a variety of volumetric water content. The experimental results show that the dielectric constant is strongly correlated to volumetric water content as polynomial equations with an order of 3. In addition, the volumetric water content calculated from the dielectric constant is similar to that obtained from the sample weight. In the field, a small sampler is used to compare the volumetric water content calculated from the dielectric constant with the volumetric water content obtained from the sample. The results of field application demonstrate that the volumetric water content estimated by the TDRP shows similar trend to the gravimetric water content of sample. This study suggests that the TDRP is effectively used to evaluate the volumetric water content of unsaturated soils according to the penetration depth.

A Study for on Application of Bamboo Soil Nailing System (대나무 쏘일네일링의 적용성에 관한 연구)

  • Bang Yoon-Kyung;Kim Hong-Taek;Yoo Si-Dong;Yoo Chan-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.6
    • /
    • pp.31-40
    • /
    • 2005
  • In this study, a newly modified soil nailing technology which uses bamboo, rich natural material growing in southern areas, is developed to prevent the soil pollution and to overcome the difficulty of excavation near existing structures. Experimental and analytical studies were performed to confirm application possibility of bamboo taking the place of existent reinforcement material, that is steelbar, FRP and etc. In experimental study, strength characteristics of bamboo material were analyzed, and pull-out resistance of bamboo soil nailing system by field pull-out tests was examined. In analytical study, limit equilibrium analysis and displacement analysis were performed, and application possibility of bamboo soil nailing system was analyzed. As the result of this study, bamboo has comparatively good strength and pull-out resistance characteristics. It is expected that bamboo can be used as satisfactory reinforcement material by selecting bamboo with reguired diameter and by controlling the number of bamboo strips. Bamboo is an alternative for the reinforcement of soil nailing system, especially temporary support system in excavation near the existing structures.

A Study of Correlation between SPT N-value and Exerted Electrical Energy Required for Ground Drilling II : Application Study (Field Pilot Test) (지반굴착에 소요되는 전기에너지와 표준관입시험 N값과의 상관관계 연구 II : 적용성 평가(현장시험시공))

  • Choi, Changho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.11 no.4
    • /
    • pp.55-62
    • /
    • 2012
  • In this application study, field pilot tests were performed to evaluate the validity of a proposed formula between the exerted electrical energy and SPT N-value based on the result of the basic study. Measurement sensors and recording system were developed to obtain exerted motor current and drilling depth in a field. By using the correlation formula proposed in the basic study, the measured motor current and boring speed were applied to predict SPT N-value and the predicted N-values were compared to SPT N-value of site exploration. From the comparisons it is verified that the exerted electrical energy to bore ground might be used to predict SPT N-value and pile tip location.

Application of Navigation System on the Cut Slope Management (네비게이션을 이용한 절토사면 데이터 관리 시스템 (Slope-Navi) 구현)

  • Bae, Sang-Woo;Bautista, Ferdinand E.;Koo, Ho-Bon;Lee, Yun-Rae
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.1274-1281
    • /
    • 2010
  • Cut Slope Management System(CSMS) is a systematic maintenance and management system designed to prevent the collapse of cut slopes located along national roads and to minimize damages caused by slope collapse related accidents. In order to implement a maintenance and management system that will ensure safe road operation, the Korean government has started the inventory of cut slopes and developed a cut slope database since 2006. The study on the application of cut slope database is on-going and part of this study is the development of cut slope database management system (Slope-navi) using GIS technology and navigation system for the effective and efficient cut slope management using Information Technology. Using the Navigation Cut Slope Data Management System the previously developed database was checked and verified. The converted cut slope inventory data and field investigation reports of about 20,000 cut slopes were loaded in the navigation map. Through the development of the navigation's cut slope data search system, a systematic and efficient cut slope database management and operation in the prevention of slope collapse and remedial measure selection was established.

  • PDF