1 |
(주)한국항만기술단(2001), 대나무메트를 이용한 초연약지반 호안 및 가설도로의 기초처리공법, 신기술 제290호
|
2 |
Bruce, D. A. and Jewell, R. A., Soil Nailing: Application and Practice Part 2, Ground Engineering, The Journal of the British Geotechnical Society, Vol.20, No.1, 1987, Jan., pp.21-28
|
3 |
Federal Highway Administration (2003), Geotechnical Engineering Circular No.7 Soil Nail Walls, FHWAO-IF-03-017
|
4 |
김홍택 (2001), 'Soil Nailing 공법의 과거, 현재, 미래', 평문각
|
5 |
French National Research Project Clouterre (1991), RECOMMENDATIONS CLOUTERRE 1991
|
6 |
김윤하 (2002), 연약지반상청죽메트 부설지반의 즉시침하량 추정, 전남대학교 대학원 석사학위논문, pp.31-34
|
7 |
김홍택, 정성필, 박시삼, 류정수, 강인규 (2000), 'Design, Construction and Performance of A Removable Soil Nailing System', 한국지반공학회지, pp.107-117
|
8 |
Bruce, D. A. and Jewell, R. A., Soil Nailing: Application and Practice Part 1, Ground Engineering, The Journal of the British Geotechnical Society, Vol.19, No.8, 1986, Nov., pp.10-15
|
9 |
Federal Highway Administration (1998), Manual for Design and Construction Monitoring of Soil Nail Walls, FHWA-SA-96-069
|