1 |
Cho, C. W. (2010), Piling Engineering Practice, Engineer Book, pp.46-60.
|
2 |
Choi, C., Cho, J., Chung, H., Lee, Y. (2007a), "SPT N-value Estimation from Exerted Electrical Motor Energy for Preboring Pile Installation," Proceedings of 7th Japnanese-Korean-French Seminar on Geo-Environmental Engineering, Grenoble, France, pp.293-298.
|
3 |
Choi, C. (2012), "A Study of Correlation between SPT N-value and Exerted Electrical Energy Required for Ground Drilling : Basic Study (Laboratory Soil Box Test)", Journal of Korean Geosynthetics Society, under review process.
|
4 |
Geotechnical Engineering Research Group (2003), Plan, design, and construction of pile foundation in practice, Gunsul-JeongBo, pp.456-463.
|
5 |
Korea Nation Housing Cooperation (2004), Solutions of Structural Problems for Engineers, pp.40-48. (in Korean)
|
6 |
Korea Patent (2006), Apparatus for measuring excavation depth for ground excavation equipment, Patent No.556673.
|
7 |
Park, Y.-H., Kim, N.-Y. and Yook, J.-H. (2004), Design and Construction of SIP Method(II), Korea Expressway Corporation Research Report, pp.35-39.
|
8 |
Architectural Institute of Korea (2004), Recommendations for Design of Building Foudnations-Japan Architecture, Originally published in Japan in 2001 by Architectural Institute of Japan, pp.389-391.
|
9 |
Bowles, J. E. (1996), Foundation Analysis and Design, 5th Ed., McGraw-Hill, pp.154-162.
|