Design Method of Spread Footing Reinforced by Geosynthetics (토목섬유를 이용한 확대기초의 설계법 연구)

  • 주재우;이승은;서계원;박종범;최현기
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.10a
    • /
    • pp.659-664
    • /
    • 2002
  • New design method about the spread footing was developed using only soil and geosynthetics. This footing will be able to replace the concrete footing at constructing the foundation of small structures. As shown in Fig-3(b), after excavating the ground in semicircular shape, geosynthetics is layed on the semicircular shape of ground and let the soil filled. Geosynthetics of upper side are fixed tightly each other It can be thought to be a kind of great bag with semicircular shape. We performed two kinds of experiments to investigate the deformation and the failure shape of spread footing reinforced by geosynthetics. First, after making model ground with aluminium rods, the lattice point of 1cm ${\times}$ 1cm size of the side of aluminium rods have been painted with various kinds of colors. We have observed the movement of painted rods during loading. Second, we have taken pictures about failure process using B-shutter method. Analysing the behavior of model ground reinforced in a semicircular shape, we could know the reinforced one has much greater and wider plastic area than unreinforced one at failure. Based on the experimental results, new design method was proposed, which has a possibility to apply at the field works.

  • PDF

Estimation Of Footing Settlement In Sand (사질토 지반에서의 얕은기초 침하량 해석)

  • Lee, Jun-Hwan;Park, Dong-Gyu
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2004.03b
    • /
    • pp.44-49
    • /
    • 2004
  • The settlements of footings in send are often estimated based on the results of in-situ tests, particularly the standard penetration test (SPT) and the cone penetration test (CPT). In this paper, we analyze the load-settlement response of vertically loaded footings placed in sands using both the finite element method with a non-linear stress-strain model and the conventional elastic approach. Calculations are made for both normally consolidated and heavily overconsolidated sands with various relative densities. For each case, the cone penetration resistance qc is calculated using CONPOINT, a widely tested program that allows computation of qc based on cavity expansion analysis. Based on these analyses, we propose a procedure for the estimation of footing settlement in sands based on CPT results.

  • PDF

The Reliability of SIP Pile in Layered Ground (다층토 지반에서 매입말뚝(SIP)의 신뢰성 연구)

  • 이민선;황의석;이봉열;김학문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.567-574
    • /
    • 2002
  • Rapid urbanization of many cities require large scale constructions such as high rise buildings in difficult ground conditions. SIP(Soil-cement Injected Precast pile) type piles are tile most popular choice of foundation method in soft ground as well as layered ground in many cities in Korea since SIP offer negligible amount of noise and vibration. But SIP method of construction provide wide range of pile capacity depending on the construction method, equipment, ground conditions and quality control method etc. Therefore this paper intend to investigate the reliability of SIP pile in layered ground through a comparison of existing design formulars and SIP pile load test.

  • PDF

3-D Numerical Analysis for the Verification of Bearing Mechanism and Bearing Capacity Enhancement Effect on the Base Expansion Micropile (선단 확장형 마이크로파일의 3차원 수치해석을 통한 지지 메커니즘 및 지지력 증대효과 검증)

  • Lee, Seokhyung;Han, Jin-Tae;Jin, Hyun-Sik;Kim, Seok-Jung
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.2
    • /
    • pp.19-31
    • /
    • 2021
  • Micropiles are cast-in-place piles with small diameters. The advantage of micropile is low construction expense and simple procedures, so it is widely applied to existing buildings and structures for the reinforcement of foundation and seismic performances. The base expansion structure has been developed following the original mechanism of horizontal expansion steps under compressive loading. This kind of structure can be installed at the pile end to improve the bearing capacity by tip area enlargement and horizontal force increment to the pile surface area. However, 'Micropile with base expansion structure' cannot be put into practical use, because detailed verification for the developed technique has not been conducted so far. In this research, 3-D numerical analysis was conducted to figure out the bearing mechanism of base expansion micropile and to verify the bearing capacity improvement compared to the general micropiles. 3-D modelling of micropile with base expansion structure was carried out and input parameter was determined. Bearing mechanism induced by base expansion structure was analyzed by lab-scale modelling, and bearing capacity improvement was verified by field-scale analysis.

A Review of Instrumentation System and Construction of Korea Highway Test Road (시험도로 건설과 계측시스템 구축)

  • 최준성;김도형;김성환
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.11a
    • /
    • pp.603-606
    • /
    • 2000
  • The cost needed for the construction and management of highways in the whole nation is rapidly growing so the research that can decrease the cost is required. However, most of the highway specs have simply converted from those of other countries, including USA. Therefore, some of our design and construction specs were not the optimum ones based on our own situation, requiring a research under the actual traffic and environment of our nation. The use of test road develops many aspects of highway engineering. Those are evaluation of construction materials, a general overview of korea pavement design and serviceability under the actual traffic and environmental condition of the nation. It is also economical and efficient compared to the trial construction of each item in spreaded form. A test road, 7.7km long with two lanes, is being constructed on the Inner Central Expressway. In this test road, 2.7km is planned for asphalt pavement and 3.4km is planned for concrete pavement. Three test bridges and five earth retaining structures will be included in the test road. Based on the master plan, the major performance was progressing such as detailed research modules of each area, preliminary research for the future research, sensor surveys for the behavior analyses of pavements and structures with installation methods and data acquisition systems, the foundation research of Integrated Instrumentation System and the Management Plan for automated measurement. Some area(structure research division, geotechnical research division) was designed the instrumentation plan because some instrument sensors must be installed during the construction of the test road. And then the instrumentation plan of each area was enforcing because a large majority of the instrument sensors must be installed after the construction of the test road. The field surveys with material property tests and pilot instrumentation test with sensor tests was also performing in accordance with the construction in the field.

  • PDF

Rock cavern stadium. A research program related to public use of Underground caverns

  • Meland, Oystein
    • Tunnel and Underground Space
    • /
    • v.2 no.1
    • /
    • pp.95-101
    • /
    • 1992
  • Norwegian technology related to preinvestigations, planning, design and construction of large underground caverns is wellknown worldwide. However, so far this technology is only slightly verified through scientiffic reports and documentation. The "Rock cavern stadium" research program is an interdisciplinary program related to the ongoing building and future use of Gjovik Olympic Subsite which is the largest cavern in the world for public purposes with a span of 61 meters and a height of 25 meters. The estimated budget for this program is about USD 4 million which is made possible through grants from The Royal Norwegian Council for Scientific and Industrial Research as well as through contributions from Norwegian and Swedish companies that are participating. The program is carried out in collaboration with The Foundation for Scientific and Industrial Research at the Norwegian Institute of Technology. The Norwegian Geotechnical Institute and The Eastern Norway Research Center. The research program will continue until the end of 1994 to ensure that input comes from a full period of use in this stadium with different activities like exhibitions, conferences, concerts etc being included as verification through full-scale measurements and observations. The research program has five subtasks. Three of these are related to subjects like Energy consumption. HVAC installations. Fire safety design, Engineering geology and Rock mechanics, Environmental aspects. The fourth subtask is concerned with the collection of basic data, results and experience from these three subtasks to provide a basis for national Norwegian guidelines related to this interdisciplinary subject area. The guidelines will first be presented as a manual for planning and engineering purposes. The realization of this research program is a unique opportunity to enhance the expertise that has been acquired from this cavern stadium. By involving research in this extraordinary project from the excavation and building phase to its subsequent use. this will give the participants know-how and expertise which is very much in demand internationally. The coordination of the international activities between the participants as well as preparation of participations and presentations in international conferences and symposium are included in the fifth task of this national research program.

  • PDF

Bolted Bonding Method of Steel Pipe Pile and Cap (볼트식 강관말뚝 머리보강 방법)

  • 박영호;김성환;장용채
    • Geotechnical Engineering
    • /
    • v.14 no.6
    • /
    • pp.57-71
    • /
    • 1998
  • Present bonding methods which connect steel pipe and spread footing in pile foundation have been generally used. These methods however showed lots of difficulties in the quality control. A new bonding method, which is called 'Bolted Bonding Method(BBM)' , is developed. This method uses factory-made parts so that it may increase the degree of quality, and workability, and is being adopted in the Held concerned. The method is verified by the structural analysis and laboratory test and then a new design formula is proposed. In addition, a comparison test of the present methods and BBM are conducted to observe the applicability and economy of the latter. As results, it is observed that BBM shows 5 to 10 times faster in Held work and 9% to 50% cheaper in construction cost than the existing methods.

  • PDF

Effect of Wind Load on Pile Foundation Stability in Solar Power Facilities on Slopes (풍하중이 경사지 태양광 발전시설의 기초 안정성에 미치는 영향 분석)

  • Woo, Jong-Won;Yu, Jeong-Yeon;Song, Ki-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.39 no.12
    • /
    • pp.47-60
    • /
    • 2023
  • At present, in South Korea, there is a growing concern regarding solar power facilities installed on slopes because they are prone to damage caused by natural disasters, such as heavy rainfall and typhoons. Each year, these solar power facilities experience soil erosion due to heavy rainfall and foundation damage or detachment caused by strong wind loads. Despite these challenges, the interaction between the ground and structures is not adequately considered. Current analyses primarily focus on the structural stability under external loads; the overall facility site's stability-excluding the solar structures-in relation to its surrounding slopes is neglected. Therefore, in this study, we use finite-difference method analysis to simulate the behavior of the foundation and piles to assess changes in lateral displacement and bending stress in piles, as well as the safety factor of sloped terrains, in response to various influencing factors, such as pile diameter, spacing between piles, pile-embedding depth, wind loads, and dry and wet conditions. The analysis results indicate that pile spacing and wind loads significantly influence lateral displacement and bending stress in piles, whereas pile-embedding depth strongly influences the safety factor of sloped terrains. Moreover, we found that under certain conditions, the design criteria in domestic standards may not be met.

Evaluation of Applicability of CMD-SOIL using the Deep Mixing Method in Ulsan Area for the Construction of Coastal Structure Foundation (해안구조물 기초의 건설을 위해 울산지역에서의 심층혼합공법을 사용한 CMD-SOIL의 적용성 평가)

  • Jae-Hyun Park;Kwang-Wu Lee;Kyong-Ju Mun;Dae-Sung Cho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.22 no.3
    • /
    • pp.61-69
    • /
    • 2023
  • As global trade and maritime port environments change, the need to respond to larger and faster ships is increasing. Accordingly, new ports are being built around metropolitan cities such as Busan and Ulsan. In general, a compaction method using sand or gravel is applied to the construction of a new port. However, due to the lack of sand or gravel and the difficulty in securing economic feasibility due to the increase in unit price, the deep mixing method has recently been used. Therefore, in this study, CMD-SOIL using circulating resources was applied to the Ulsan area, and the applicability was determined by analyzing the laboratory mixing test and boring results at in-situ. As a result of the test, it was analyzed that it showed more than the design mixing strength, and it was possible to secure the similar performance as blast furnace slag cement. In addition, it was analyzed that the design standard strength can be sufficiently secured as a result of in-situ boring. Therefore, considering the field applicability in the Ulsan, it is judged that the use of CMD-SOIL is possible.

Design of Pile Foundations Considering Negative Skin Friction (부마찰력을 고려한 말뚝기초 설계)

  • Kim Ju-Hyong;Kwon Oh-Sung;Kim Myoug-Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.5
    • /
    • pp.65-74
    • /
    • 2005
  • The negative skin friction on piles, which are installed in currently consolidating soft deposits, creates significant problems on the stability of pile foundations. This study investigated whether or not the pile foundation designs were appropriate in soft deposits with large amount of consolidation settlement. The final settlements of the grounds along the pile depth were estimated by the soil parameters obtained from the laboratory tests and by the field-measured settlement curves, if they were available. The displacement of the piles along the pile depth was estimated by both the load transfer method and the numerical method. Both methods gave similar locations of neutral planes and magnitudes of the maximum axial forces on the piles. The movements of the ground and the piles were compared to calculate the down drag acting on piles. For the piles whose bearing capacities were less than the design loads including the down drag, slip layer coatings and/or incrementing of the pile penetration depth into the bearing stratum were proposed to improve the pile capacities.