The objectives of this study are to investigate input variables of photovoltaic generation programs and to compare their prediction to actual generation of photovoltaic system in the C city hall and the C city sewage treatment plant. We investigated the actual amount of generation, the forecast amount of generation, the amount of solar radiation data, and calculated the relative errors. We simulated the photovoltaic system of C city hall and the C city sewage treatment plant located in Chungju using existing programs, such as SAM, RETSCREEN, HOMER, PV SYST, Solar Pro. The result of this study are as follows : Through examining the relative errors of monthly predicted and actual generation data, monthly generation data showed big errors in winter season?. Except winter season, actual amount of generation and the predicted amount of generation showed no large errors.
In this paper, in order to investigate the efficiency of solar power generation system operation, we have studied operation cases such as generation amount, utilization rate, and generation time, and the following conclusions were obtained. The amount of power generation in 2017 was 1,311.48 MWh, and the amount of power generation in 2018 was 1,226.03 MWh. In 2021, 1,184.28 MWh was generated, and 90.30% compared to 2017, and the amount of power generation decreased by 1.94% every year. The deterioration of photovoltaic modules could be seen as one cause of the decrease in power generation. 1,977.74 MWh was generated in the spring, and 1,621.77 MWh was generated in the summer. In addition, 1,478.87 MWh was generated in the fall, and 1,110.55 MWh was generated in the winter, showing a lot of power generation in the order of spring, summer, fall, and winter. From 2017 to 2022, the seasonal utilization rate, daily power generation time, and daily power generation were investigated, and it could be seen that the spring utilization rate varies from 19.29% to 16.99%. It could be seen that the daily generation time in winter decreased from 2.67 hours to 2.13 hours, and in spring it generated longer than spring from 4.63 hours to 4.08 hours. In addition, the daily power generation in winter also decreased from 2.67 MWh to 2.13 MWh, and in spring it decreased from 4.63 MWh to 4.08 MWh, but it could be seen that it is more than in winter.
Recently, photovoltaic systems have been devolved into much larger systems up to MW-scale. Photovoltaic industry participants give their focus on power generation capability of photovoltaic modules because their benefits can be decided from the amount of generation. The information on long-term performance change of photovoltaic modules helps to estimate the amount of power generation and evaluate the economic cost-benefits. Long-term performance of a PV system has been analyzed with operation data for 12 years from 1999 to 2010. In the first year, the amount of yearly power generation was 57.7 MWh with 13.2% capacity factor. In 2007, the amount of yearly generation was 44.3 MWh with 10.14% capacity factor, and in 2010, the amount was decreased down to 38.1 MWh with 8.7% capacity factor. The result means that long-term capacity factor has been 4.5% decreased for 12 years and that the amount of generation has been decreased 34.0% for 12 years which is 2.8 % per year. The latter capacity factor has been decreased faster than 0.20%, the average rate for 10 years. The performance decrease of the PV system is meant to be accelerated. The decrease of performance and utilization is due to aged deterioration of photovoltaic modules and lowering conversion efficiency of PCS.
In this study, we assessed dependency of small hydropower potentials on the two different runoff such as the estimated runoff based on the rainfall amounts and measured runoff. The hydpropower potentials were evaluated using actural power generations taken from Deoksong, Hanseok, and Socheon small hydropower plants over Han and Nakdong river basins, respectively. As a result of comparing the actual power generation amount with the potential amount based on the rainfall amount and the estimated amount based on the observed flow amount by each small hydroelectric power plant, the degree of latent small hydro energy by the observed flow was confirmed to be high. It is confirmed that the potential hydroelectric power generation rate is estimated to be about average 30%Point higher than the actual generation amount as a result of the measured flow rate rather than using the rainfall amount. Based on this, a method for improving the degree of the actual generation amount is proposed.
The relationship between domain switching and acoustic emission (AE) during poling was investigated using the tetragonal ferroelectric ceramics with composition of (Pb,La)TiO3+0.01MnO2 The amount of AE generation during poling increased with increasing dc electric field and raising temperature. It was confirmed that the change of the amount of AE generation with poling condition resulted from the difference of the amount of 90$^{\circ}$ domain switching and total amount of AE generation for 10 minutes was approximately proportional to the amount of 90$^{\circ}$domain switching. The A generations of two specimens which have different tetragonality rations(c/s rations) 15 at% and 24at% La-doped were also investigated. The sample with c/a ratio of 1.012 where 90$^{\circ}$ domains are dominate had larger amount of AE generation and 90$^{\circ}$ domain switching compared with the sample with c/a ratio of 1.004 where 180$^{\circ}$ domains are dominant.
In this paper presents the MPPT tracking algorithm using angle control of flexible PV in BIPV. The proposed algorithm is based on MPPT tracking algorithm for curtain wall using flexible PV. It is an algorithm to find optimal power generation condition by controlling the angle of flexible PV using the air layer of window. The angle of flexible PV tests the power generation by separating the center of flexible PV into the interior angle in the interior direction and the external angle in the center of flexible PV. When the angle of flexible PV was used as interior angle, the generation amount was increased by 15.79% and increased by 8.45% compared with the external angle. MPPT tracking is performed on the generation amount of the interior angle which has the most power after comparing the generation amount according to the bending shape of the flexible PV. This algorithm can be the most efficient method for the curtain wall using flexible PV because the bending pattern with the greatest amount of power generation may be different because the environment of the building applying the curtain wall is different.
태양광 발전소의 발전량은 기상 조건, 지리적 조건, 태양광 패널 설치 조건과 높은 상관관계를 갖는다. 과거 연구들에서는 발전량에 영향을 미치는 요소를 찾아내었고, 그 중 일부는 태양광 패널이 최대 전력량을 생산할 수 있는 최적의 조건을 찾았었다. 하지만, 태양광발전소 설치 시 현실적 제약을 고려하면 최대 발전량 조건을 만족시키기는 매우 어렵다. 발전소 소유자가 태양광발전소 설치를 검토할 때 태양광 발전량을 예측하기 위해서는 발전량에 영향을 미치는 요인들의 민감도를 알아야 한다. 본 논문에서는 태양광발전소의 발전량과 날씨, 위치, 설치 조건 등 관련 요인들과의 관계를 분석하기 위한 다항회귀분석 방법을 제안한다. 분석자료는 대구, 경북에 설치·운영되는 태양광발전소 11개소로부터 수집하였다. 분석 결과 발전량은 패널 종류, 일사량, 음영 유무에 영향을 받으며 패널 설치 각도와 방향이 복합적인 영향을 주는 것으로 나타났다.
Kim Y.J.;Yun J.H.;Ryou Y.S.;Kang G.C.;Paek Y.;Kang Y.K.
Agricultural and Biosystems Engineering
/
제6권1호
/
pp.22-26
/
2005
A wind-heat generation system was developed and the system consisted of an electric motor, a heat generation drum, a heat exchanger, two circulation pumps and a water storage tank. The heat generation drum is an essential element determining performance of the system. Frictional heat was generated by rotation of a rotor in the drum filled with a working fluid, and the heat stored in the fluid was used to increase water temperature through the heat exchanger. Effects of some factors such as rotor shape, kind and amount of working fluid, rotor rpm and water flow rate in the heat exchanger, affecting the system performance were investigated. Amounts of heat generated were varied, ranging from 126,000 to 32,760 kJ/hr, depending on combination of the factors. Statistical analysis using GLM procedure revealed that the most influential factor to decide the system performance was amount of the fluid in the drum. Experiments showed that the faster the speed of the rotor, the greater heat was obtained. The greatest efficiency of the heat generation system, electric power consumption rate vs gained heat amount of water, was about 70%. Though the heat amount was not enough for plant bed heating of a 0.1-ha greenhouse, the system would be promising if some supplementary heat source such as air- water heat pump is added.
It is needed to classify the kinds of construction and demolition(c&d) debris to 6 catagories of waste concrete, waste asphalt concrete, waste wood, scraps, combustible waste and incombustible waste in order to properly do a separate discharge and to estimate unit generation rate in construction site. Also, in this case, the unit treating cost for mixed wastes should be applied with the unit treating cost for combustible waste. The construction standard materials estimation data is used for basic data for estimating unit generation rate. The mixed wastes in this data should be classified to waste wood, combustible waste and incombustible waste, and their ratio is obtained by using the unit generation rate of Asia Pacific Environment and Management Institute and Seoul Metropolitan Development Institute. The waste amounts generated from newly-built construction can be obtained from multiplying the loss rate by the amount of materials used from construction standard estimation data. Also, those from dismantling construction can be obtained by subtracting waste amount generated during newly-built construction from total input amount of materials in newly-built construction. Those in two cases can be used in construction site. It can be used for estimating the amount generated and establishing the treating plan in the case of setting up the policy of waste management and doing the environment impact assessment.
To solve the problem of conventional fossil energy, utilization of renewable energy is growing rapidly. Solar energy as an energy source is infinite, and a variety of research is being conducted into its utilization. To change solar energy into electrical energy, we need to build a solar power plant. The efficiency of such a plant is strongly influenced by meteorological factors; that is, its efficiency is determined by solar radiation. However, when analyzing observed generation data, it is clear that the generated amount is changed by various factors such as weather, location and plant efficiency. In this paper, we proposed a solar power generation prediction algorithm using geographical factors such as latitude and elevation. Hence, changes in generated amount caused by the installation environment are calculated by curve fitting. Through applying the method to calculate this generation amount, the difference between real generated amount is analyzed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.