To place concrete overlays has become a standard application in the strengthening and rehabilitation of concrete structures such as bridges, tunnels, parking decks and industrial buildings. In general, connectors are used to ensure a monolithic behavior of the two concrete layers. Within the framework of the development of a new connector wedge splitting tests and shear tests were performed, in addition nonlinear finite element analyses were applied to investigate the load transfer behavior of the connectors for different prototypes. The numerical simulation results were compared to experimental data. The computed load-displacement curve demonstrates good correspondence with the curves obtained in the experiments, and the experimental crack patterns are reasonably simulated by the computed crack propagation. Both numerical and experimental investigations on the wedge splitting test and on the shear test served as basis for the development of new type of connectors.
In the web environment for general information seeking and business-to-customer and business-to-business electronic commerce, users are customers. Understanding their expectations and how they feel about the web sites they use is becoming a very serious concern. While the success of a company or an organization is dependent on many factors, its web site plays a central role. This paper described the use of WebQual2.0 to evaluate the various web sites of B2B and B2C. WebQual2.0 has been extended and refined to encompass an interaction-quality literature. Furthermore, this paper described the use of Kano model to evaluate the various web sites which classified by internet business types. The result showed that the inherent characteristics of B2B and B2C web site should be considered in initial site construction. Further, customers in a web domain do not regard all quality factors as equally important and the rankings of important quality factors differ from one web domain to another. This study was focused on the identifying the weights of web quality factors according to the each web site of the internet business types.
Korean Journal of Construction Engineering and Management
/
v.12
no.4
/
pp.88-96
/
2011
Schedule control is an exceedingly fundamental and important construction business function. Even though enormous research efforts have been exerted in this area, there has been no comprehensive and quantitative study exploring detailed cost control practice of construction companies in terms of practical patterns and trends. In this context, this paper surveyed the patterns and trends of schedule control practice of Korean general contractors. Schedule control process as compared to schedule reduction is focused in this paper. The variables for practical schedule control process were identified first. A survey questionnaire was then developed and used in order to collect data from Korean general contractors. Survey results analyzing responses from 45 companies show that scheduling processes in practice have been significantly enhanced in terms of software tools, manuals, and capabilities of engineers.
Journal of Construction Engineering and Project Management
/
v.3
no.4
/
pp.26-34
/
2013
Customer satisfaction and customer relationship are crucial aspect in any enterprises including housing construction projects. In general, the housing developers are facing a number of new challenges in different countries including Libya. The construction industries/housing developers need to continuously improve their products and services to meet customers' satisfaction desires and to remain in the current competitive market. This paper focuses on analysing the satisfaction factors of customers including qualityaspects of products and services in the construction projects. A framework was developed to evaluate the dynamics relationship between customer satisfaction and quality products or services, aiming to help companies' managers and policy makers to understand the needs and points of view of their customers. Apragmatic analysis was conducted to explore and analyse the customer satisfaction factors in construction industry considering different aspect of customer groups in Libya. Results indicate that there is a high demand of improvements in the contractor's performance in terms of cost, time and quality of products. It was also found that Libyan construction companies have been forced to transform their policies after on Libyan war 2011 to focus on client and customer satisfactory policies, or say centric for the purpose of improving client requirements and turn the business into more advantageous for any company.
The business's paradigm is rapidly changing from product-out to market-in due to Open-door, intensive competitiveness, the variety of the customer's need. Starting from this needs of the times, CRM based on the understanding which company's value coming from the customers is in everyone's mouth. But it can said that it stay in the Immature level at the understanding of this Importance, strategic approach Therefore, the basic objective of this study is to grope the strategic approach that can stand out basic competitive power of department store during the construction of CRM in department store. To achieve the objective of this study, first, we will find out the general error which companies commit during the construction of CRM, second, we will consider the grafting possibility with e-CRM in the case of the CRM's construction in department store. Finally, we will exhibit the conceptual model of department store's CRM which apply the membership card for effectiveness of the Customer Relationship Management.
Journal of the Korean Professional Engineers Association
/
v.34
no.5
/
pp.77-81
/
2001
The industrial accident in subway of late is increasingly coming to the front as a serious problem of society because a scale of industrial accident is a large size, and powerfulness, while the percent of accident is decreasing as a result of industrial facilities with the largeness of equipment, automation, and high horse-powering. In this paper, a study on the estimation of accident loss prevention cost and risk analysis in subway construction is proposed as an alternative to the techniques currently used in the general construction projects safety. Then the concept of risk evaluation using a risk assessment model is presented to drive value of risk and numerical example for risk analysis. A means for this does grasp the importance of educational factor by way of analyzing the causes of accident through statistical data of labor department, emphasizing the necessity and the importance of safety education, being helpful to act safety by decreasing insecure activity which ranks the majority of accident causes with putting the education program, form, method into practice that are suitable for a place of business.
Today, apartment houses account for a very high proportion of the types of residence. This study analyzed the difference between the bidding construction cost using the long-term repair allowance and using the general repair cost, and analyzed the difference of factors affecting the amount of use of these two items. For this purpose, related data on apartment housing complexes located in seven representative districts of Busan from 2017 to 2021 were collected and analyzed from the apartment housing management information system. As a result of statistical analysis, the type of bidding variable had the greatest negative(-) effect on the bidding construction cost, and the next factor that affected was different between the amount of long-term repair allowance used and general repair cost used. In addition, there was a difference in statistical significance in the type of bidding by construction year for the number of bidding works between the case of using the long-term repair allowance and the case of using the general repair cost. The results of this analysis will help to find ways to reduce bidding construction costs. However, it is expected to find additional meaning by including more detailed variables such as technical ability.
The process for establishment of Operational Continuity Management Plan is organized repeatedly of Business Risk Assessment, Crisis Analysis, Business Impact Analysis, Establishing Business Recovery Strategies, Detailed Planning, Plan Execution, Test and Maintenance(Including Monitoring). Therefore, in this paper in response to global environmental change and the construction and operation of social security systems to maximize operational continuity management, crisis management and crisis management systems, building integrated systems for building technology in general and operational continuity management within an organization to understand developed to provide a framework for implementing operational continuity management in terms of crisis management has proposed to build an integrated system.
Journal of the Korean Professional Engineers Association
/
v.15
no.2
/
pp.52-59
/
1982
This is to intent of the reinforcement proposal for current P.E., qualification code in necessity of improving the foreign technology inducement & technology export between advanced Country and developing or undeveloping Country as Technological Cooperation for mutual benefit. A prosal contains internationally recogniyed general term & conditions of Standard Contract form for Engineering jobs, construction works includings of plant exportation as for additional new basic knowledge for roling of business promotion & finalization in urging of more current jobs internationally to be increment of technological cooperation.
Journal of the Korean Institute of Landscape Architecture
/
v.44
no.5
/
pp.81-91
/
2016
The study shows solutions of long-term unexecuted urban park and activation plans to facilitate the business promotion of Private Park Developers. This study conducted a feasibility analysis to determine if the business of a special case is applicable. The result of this study is as follows about three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park. First, the three long-term unexecuted urban parks in Gwangju Metropolitan City's City Park are the forest type Neighborhood Parks. Businesses of a special case's park developing cost(average 0.4%) have a relatively low percentage. It is most affected by Land Compensation(average 33.8%) and building construction expenses(average 59.1%). Second, long-term unexecuted urban parks' Land Compensation and building construction expenses seed capital are excessive. The Bongsan Park balance floor space index is 179 percent; a reasonable profit floor space index is 220 percent. The Mareuk Park balance floor space index is 351 percent; a reasonable profit floor space index is 420 percent. The Jungoe Park balance floor space index is 327 percent; a reasonable profit floor space index is 400 percent. Third, to facilitate the business of special cases in deliberating, Bongsan Park should change its second class general residential area. Jungoe Park must change the quasi-residential area and semi-residential area. Mareuk Park must change the general commercial area. In this way, the feasibility of promoting private park projects will be improved.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.