Proceedings of the Korean Institute of Building Construction Conference
/
2015.05a
/
pp.126-127
/
2015
New technologies using a CNC machine to reduce the production cost of free-form buildings are being developed. To produce free-form members with such technologies, a vast free form building should be first divided into multiple panels that can be produced. Considering the curved surface of free-form buildings, the shape and size of divided freeform panels vary, which will lead to a great deal of errors. Currently, the engineers and designers complete the panelizing work through trials and errors even in large-scale projects, which results in increased construction duration and cost. Thus, it is necessary to develop a freeform panelizing technology to maximize the economic effects of free-form concrete member production technology. The purpose of the study is to analyze influence factors on panelizing of free-form buildings, which is a preceding research for development of a panelizing technology. The influence factors drawn will provide a core basis for development of panelizing technologies for free-form buildings.
International conference on construction engineering and project management
/
2015.10a
/
pp.425-428
/
2015
New technologies using a CNC machine are being developed to reduce the production cost of free-form buildings. For production of free-form members using such technologies, vast free-form buildings should be first split into multiple panels that are productible. Taking into consideration of the curved surface of free-form members, the segmented free-form panels may vary in shape and size, which may cause a lot of errors. In addition, it is time-consuming for the work. However, the current panelizing work is completed with the trials and errors of engineers and architectural designers even in large-scale projects, which results in increased construction duration and cost. Thus, it is necessary to develop a technology for panelizing free-form panels so as to maximize the economic feasibility of production technologies for free-form concrete members. The study intends to develeop automatic panelizing algorithms of free-form buildings considering the curved surface and size of free-form panels and the production conditions. The developed algorithms will be useful in applying the production technologies of free-form buildings using CNC machine and reducing the cost.
Proceedings of the Korean Institute of Building Construction Conference
/
2019.05a
/
pp.83-84
/
2019
Free-form buildings refer to geometric external structures in curved form, unlike conventional structures with straight lines. The development of construction technologies for the implementation of these Free-form buildings is ongoing. However, there are still many restrictions on the construction technology of Free-form buildings, resulting in problems such as increased construction period and increased construction costs. Therefore, it is urgent to develop building technology for the construction of Free-form building in order to secure competitiveness in the global Free-form building market. Accordingly, this study proposes Two-sided multi-point press technology that can solve problems of existing technology and implement FCP(Free-form Concrete Panel).
Proceedings of the Korean Institute of Building Construction Conference
/
2014.05a
/
pp.308-309
/
2014
A lot of very complex free-form buildings such as Seoul City Office and DDP(Dongdaemun Design Plaza) have been recently built nowadays in domestic. However, as construction methods and cost data are decided without enough discussion and collaboration with specialized subcontractors during design stage, construction quality problems and cost overrun of the free-form buildings are thus occurred during construction stage. Therefore design system and process or contract and ordering system should be developed participating the specialized subcontractors during design stage in order to perfect the free-form design and construction. Especially US has thus an effort to apply IPD(Integrated Project Delivery) system which can solve the problems of construction quality, productivity decrease and cost overrun by constructing the buildings based on exact drawings and collaboration as well as activating BIM(Building Information Modeling). Therefore this study reviews cases of the free-form buildings in domestic and then presents necessity review of IPD in domestic.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.05a
/
pp.133-135
/
2013
The most difficult process in the construction of free-form buildings is to manufacture and construct exterior panels designed in a complex way. The façade of the free-form buildings include flat-panels, one-way curvature-panels, and bi-directional curvature panels. To construct these forms, it is necessary to go through the process of optimizing. But as for the optimizing technologies, BIM-specializing companies exclusively protect those technologies, so small construction companies have difficulty in rough estimates. Therefore, this study was aimed to provide the basic data in making the rough estimates of free-form buildings by carrying out the optimizing process for the façade of Dongdaemun Design Plaza and conducting the rough estimates according to the stage of production methods and optimization.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.166-167
/
2016
Unlike the past, supported by the development of digital technologies, free-form buildings are frequently designed with creative thoughts of architectural designers. However, there are some difficulties preventing successfully completion of projects, like reduced productivity and increased construction duration and cost upon the process of producing and installing concrete panels for free-form structures. In particular, there are active studies on the CNC machine for production of free-form concrete panels. Yet, it is difficult to effectively and easily come up with information on production and installation of free-form, curve-surfaced panels which are difficult to be mathematically defined. This requires a lot of manpower and time to implement the curved surfaces of free-form buildings as intended by architects. Accordingly, it needs a model that can effectively create production-installation data of free-form concrete panels for successful free-form building projects. Thus, the purpose of the study is to suggest data estimation model of production-installation using mathematical algorithm in free-form concrete panels. The study results will realize effective production and installation of free-form concrete members, allowing improved productivity of projects, reduced cost and shortened construction duration.
Jongyoung YOUN;Kyeongtae JEONG;Minje JO;Jihye KIM;Donghoon LEE
International conference on construction engineering and project management
/
2024.07a
/
pp.186-192
/
2024
Free-form buildings are composed of different curved surfaces and panels with varying curvatures used for the exterior. Because free-form curved surfaces differ from those of conventional buildings, they serve as landmarks worldwide and generate economic and social profits. However, molds used to realize the curved surfaces of free-form buildings are typically single-use, resulting in construction waste and posing limitations such as environmental pollution and increased construction costs. To address this issue, current research is focused on developing reusable forms that precisely implement free-form curved surfaces. Among these approaches, the Free-form Concrete Panel (FCP) employs reusable silicone material as a mold. The silicone mold consists of a lower part and a side part, with both parts fixed together by friction due to the same material. However, during the concrete pouring process into the silicone mold, lateral pressure can cause shifting, reducing the precision of the FCP and resulting in defective panels. To address this challenge, this study introduces the use of iron powder in the lower part and magnets on the sides to secure the form using magnetic force.
Proceedings of the Korean Institute of Building Construction Conference
/
2016.05a
/
pp.154-155
/
2016
Although there is an increase in demand for free-form buildings, there are several problems such as increased cost and duration and decreased constructability arising from difficult member production and installation. To solve these problems, a technology to produce free-form panels using CNC machine was developed. According to the technology, the information on free-form buildings designed is delivered to the CNC machine, a form is shaped using the delivered information and free-form concrete panels are produced using the form. The limited construction site, duration and project cost as well as interferences with other work types should be considered upon in-situ production of free-form concrete panels. Thus, the purpose of this study is to conduct a base study on in-situ production layout of free-form concrete panels by system dynamics. With this study, we will discover the causal relationship of influence factors on in-situ production of free-form concrete panels, and improved productivity is expected through the production layout.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.04a
/
pp.71-72
/
2022
In the case of free-form buildings, it is difficult to reuse the form for panel production because the shape and size of the interior and exterior panels of the building are different. In general, it is a free-form concrete panel (FCP) production technology using the existing plywood formwork, and the form is produced in a different shape each time and is discarded after only one use. The production of these disposable forms requires enormous resources, including materials, labor and time. Hence, it is necessary to develop innovative forms that can be reused for sustainable FCP construction. In this study, a technology has been developed that combines 3D Plastering Technique (3DPT) to produce FCP. By applying this technology to free-form building projects, the time and cost required for FCP production can be reduced. However, specific studies on the production process for this technology have not been done yet. Therefore, the objective of this study is a basic study of free-form concrete panel production process using 3D plastering technique.
Journal of The Korean Digital Architecture Interior Association
/
v.11
no.2
/
pp.13-19
/
2011
Starting in modern times by Le Corbusier, architectures made by concretes are still developing in these times. For several decades, the shape of box architecture has been the most familiar type of buildings. Of course "The concrete is the type of box building" isn't always right, but what we have most seen was the buildings which has been stylized and made by concretes. Through modern times to these days based on international style and functionalism, the type of box building was the most effective and good profit type of architecture which has not disregarded the capitalism. Free-form building are becoming a common place, and many of these are designed and constructed using sophisticated techniques. The main technique being used is Generative Technology of Form for free-form construction. People's interest is growing in this, and it is becoming widely used both abroad and domestically. The purpose of this paper is to investigate the use of Generative Technology of Form which is a digitally adapted design methodology in architecture. The digital design process used for contemporary buildings share many typical features that exist within a standard digital template, but also an increasing amount of mass customization that has to be produced at an additional cost. This paper will summarize these features in terms of free-form architecture, and in terms of the digital design process. In fact, 3D models have to be conceded as main design products considering features of Free Form Design Architecture. However it is practical to design twice over, because all forms of architectural drawings are 2D. From now on, design of Free Form Design Building is not to separate between design process and practical process, but to compound them as unified design system applied the process to communicate information interactively. For this, it should be required to impose unified digital design process and perform researches about effective way to apply in the field of Free-form Design Architecture.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.