• Title/Summary/Keyword: formwork inspection

Search Result 23, Processing Time 0.038 seconds

A Framework for Automated Formwork Quality Inspection using Laser Scanning and Augmented Reality

  • Chi, Hung-lin;Kim, Min-Koo;Thedja, Julian
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.13-22
    • /
    • 2020
  • Reinforcement steel fixing is a skilled and manually intensive construction trade. Current practice for the quality assessment of reinforcement steel fixing is normally performed by fabricators and has high potential in having errors due to the tedious nature of the work. In order to overcome the current inspection limitation, this study presents an approach that provides visual assistance and inspection enhancement for inspectors to assess the dimensional layout of reinforcement steel fixing. To this end, this study aims to establish an end-to-end framework for rebar layout quality inspection using laser scanning and Augmented Reality (AR). The proposed framework is composed of three parts: (1) the laser-scanned rebar data processing; (2) the rebar inspection procedure integrating with AR; and (3) the checking and fixing the rebar layout through AR visualization. In order to investigate the feasibility of the proposed framework, a case study assessing the rebar layout of a lab-scaled formwork containing two rebar layers is conducted. The results of the case studies demonstrate that the proposed approach using laser scanning and AR has the potential to produce an intuitive and accurate quality assessment for the rebar layout.

  • PDF

The Properties of Concrete with Permeability Liners("CON-SILK") on the Formwork (탈수섬유시트 거푸집을 사용한 콘크리트의 특성에 관한 연구)

  • Koo, Bong-Kuen;Seo, Chee-Ho;Yoo, Taek-Dong;Park, Jae-Seong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.2
    • /
    • pp.141-148
    • /
    • 2003
  • Concrete surface is a part that resists chiefly to carbonation by carbonic acid gas, affluence of rainwater and air, deterioration by freezing thawing, salt damage by seawater, and other chemical erosion etc. Therefore, this research analyzed physical characteristic and durable characteristic of concrete eliminated glut water and bubble of concrete surface using CON-SILK that is permeated with dehydration. As a research result, concrete using CON-SILK was improved, in comparison with concrete using general formwork, in physical performance and durability of concrete, as surface hardness, carbonation resistivity, and salt content permeation resistivity etc. Therefore, we could know that it is effective to use CON-SILK in performance elevation of concrete surface.

Importance Analysis of Major Factors in Formwork Collapse Accident (거푸집 붕괴사고 주요 요인별 중요도 분석)

  • Park, Ji-Yeong;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.3
    • /
    • pp.249-256
    • /
    • 2021
  • Fatal accidents in the construction industry account for a higher proportion than other industries, and in particular, the collapse accident of formwork is likely to lead to a serious accident like death. This study aim to derive the importance ranking of formwork collapse factors using AHP technique for preventing fatal accident. The AHP survey was conducted on field construction engineers, construction project managers, safety managers, and formwork specialist foreman with 10 years on site experience. The results of AHP analysis is that the most importance factor of formwork collapse accident is 'non-compliance with the formwork shoring assembly drawing'. Next it is important in the order of 'poor installation of formwork shoring and accessories', 'formwork shoring is not installed vertically', 'non-compliance with the concrete curing period of the formwork shoring', 'safety supervisor not designated and negligent'. It is necessary to preferentially and intensively manage the high importance factors presented as a result of this research for reducing formwork collapse accident. In addition, it will contribute to reducing construction safety accidents if the factors of the formwork collapse accident suggested in this research are included in the formwork inspection check list and checked step by step in formwork construction.

An Experimental Study of Perfobond FRP-Concrete Composite Beam (퍼포본드 FRP-콘크리트 합성보의 실험적 연구)

  • Yoo, Seung-Woon;Kook, Moo-Sung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.14 no.2
    • /
    • pp.121-127
    • /
    • 2010
  • An experimental study of composite beam with perforated fiber reinforced polymer(FRP) plank as a permanent formwork and the tensile reinforcement was performed. A combined formwork and reinforcement system can facilitate rapid construction of concrete members since no conventional formwork is needed, which requires time consuming assembly and dismantling. In order for a smooth FRP plank to act compositely with the concrete, the surface of the FRP needs to be treated to increase its bond properties. Aggregates were bonded to the FRP plank using a commercially available epoxy and perforated web of plank. No additional flexural or shear reinforcement was provided in the beams. For comparison, two control specimens were tested. One control had no perforated hole in the web of FRP plank and the other had internal steel reinforcing bars instead of the FRP plank. The beams were loaded by central patch load to their ultimate capacity. This study demonstrates that the perforated FRP plank has the potential to serve as a permanent formwork and reinforcing for concrete beam.

Structural Performance of Permanent Steel Formed Wide Beams in Construction Stage (강재 영구거푸집 와이드 보의 시공단계 구조성능)

  • Yu Na Park;Inwook Heo;Jae Hyun Kim;Khaliunaa Darkhanbat;Sung-Bae Kim;Kang Su Kim
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.27 no.5
    • /
    • pp.130-138
    • /
    • 2023
  • In this study, experimental and analytical studies were conducted on the structural performance of permanent steel formed wide beams in construction stage. Four specimens were fabricated with different rib spacings of the side steel formwork and fixing plate depths, and experimental tests were performed to investigate the effects of variables on the structural performance. Also, an finite element analysis model of the steel permanent formwork wide beam was proposed based on the test results. Using the proposed model, parametric studies were performed with variables including rib spacing of the bottom and side steel formwork, spacing, depth, and thickness of the fixing plate to derive optimized details. Furthermore, an artificial neural network model was developed to easily estimate the deformation of the steel permanent formwork wide beam with various details.

Development of Removable Deck Plate Formwork System for Beams (데크플레이트를 활용한 탈형 보-데크 거푸집 시스템 개발)

  • Jung, Joo-Hong;Jung, Hyung-Suk;Choi, Chang-Sik;Choi, Hyun-Ki
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.6
    • /
    • pp.60-67
    • /
    • 2021
  • In lately, it's been developed and used a system of using deck plates as formwork in order to solve various problems caused by conventional formwork system. This system is more economical and has higher constructability than the conventional system by permanently embedding most of deck plates into the members. However, for this kind of embedded deck plates formwork system, it's been reported that it is difficult to verify filling of concrete in members like beams with narrow width and complicated rebar arrangement. In addtion, there are several problems such as corrosion of deck plates in terms of constructability and maintenance. Therefore, in this study, it is attempted to develop a removal-deck plate formwork system for beams by removing deck plates after concrete curing. The system consists of a deck plate module that acts as form, a frame preventing deformation by concrete lateral pressure, stirrup frame, and connector that combines these. As a result of this research, it is verified that it has higher constructability, efficiently prevents deformation caused by concrete lateral pressure and could be easily removed in the developed formwork system.

Surface Characteristics of Concrete According to Types of Formworks (거푸집 종류에 따른 콘크리트 표면 특성)

  • Park, Se-Eon;Choi, Jeong-Il;Lee, Bong-Kee;Lee, Bang Yeon
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.4
    • /
    • pp.499-505
    • /
    • 2021
  • The purpose of this study is to investigate experimentally the physical/chemical properties of concrete surface according to types of formworks. Plywood formwork and coated plywood formwork were prepared. In addition, plywood formwork with sand paper was prepared to simulate deterioration of concrete or rough surface of concrete. Normal concrete was used in this study. The properties of concrete surface were investigated by visual inspection, scanning electron microscopy and energy-dispersive X-ray spectroscopy techniques, elemental mapping, 2D and 3D surface profile measurement, and zeta potential measurement. Test results showed that concrete in a coated formwork had smooth surface and concrete in the formwork with sand paper had rough surface. It was observed that properties of concrete surface depended on types of formworks. Furthermore, differences in surface roughness were significantly higher than those in chemical compositions and zeta potential.

Experimental Study on Lateral Pressure Characteristics of a Formwork for High-Flowable and High-Strength Concrete (고유동 고강도 콘크리트용 거푸집의 측압 특성에 관한 실험적 연구)

  • Ko, Young-Kon;Kim, Cheol-Hwan;Hwang, Jae-Woong;Yi, Seong-Tae
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.130-138
    • /
    • 2015
  • In this study, to examine the application of cast-in-place of high-flowable and high-strength concrete, an experimental study on the lateral pressure of a formwork was preformed. The experiment specimens, which have different casting height and casting speed were prepared. The lateral pressure and the change of temperature from test specimens were obtained. The maximum lateral pressure was shown to lateral pressure of fresh concrete. Immediately after placing, the lateral pressure starts to decrease and, after 12 hours, it showed a stabilization. The decreased tend of the lateral pressure was similar with normal-strength concrete, which appears stabilization after 3~4 hours from casting completion. The more casting speed is fast, the more maximum lateral pressure is high, but pressure reduction with the lapse of time was nearly similar. In addition, it was found that there was no direct relation between the hydration heat and the lateral pressure reduction.

An Experimental Study of Bond Stress between Concrete and Various Kinds of FRP Plank used as a Permanent Formwork (영구거푸집으로 활용한 FRP 판의 종류에 따른 콘크리트와의 부착응력에 관한 실험적 연구)

  • Park, Chan-Young;Yoo, Seung-Woon
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.19 no.3
    • /
    • pp.92-103
    • /
    • 2015
  • Development of new concrete bridge deck system with FRP plank using as a permanent formwork and the main tensile reinforcement recently has been actively conducted. Concurrent use as a reinforcing material and a permanent formwork, it is possible to reduce the construction time and construction costs than the usual concrete slab. In this study, an experiment was carried out for the bond stress between cast-in-place concrete and the type of FRP plank using as a permanent formwork. The interfacial fracture energy that can be one of the most important parameters were evaluated for adhesion performance and bond stress to know the characteristics of the failure mechanism of the adhesion surface. Interfacial fracture energy of normal concrete is 0.24kN/m of GF11 case, in the case of GF21, 0.43kN/m appears, in the case of CF11 and GF31, 0.44kN/m and 0.46kN/m respectively it appeared. In case of RFCON, 0.52kN/m appears from GF12, the CF12 and GF22, 0.51kN/m and 0.36kN/m appeared each case.