• Title/Summary/Keyword: focus construction analysis

Search Result 345, Processing Time 0.025 seconds

CRITIAL SUCCESS FACTORS FOR PROJECT MANAGEMENT INFORMATION SYSTEM IN CONSTRUCTION

  • Jung Ho Yu;Seul Ki Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.498-503
    • /
    • 2011
  • With a focus on different aspects of PMIS in construction projects, various sets of critical success factors (CSFs) have been suggested in the literature such as IS Success Model by various researchers. It is crucial to explore the relative importance and groupings of these factors. This paper aims to identify CSFs associated with Project Management Information System (PMIS) in construction projects, and explore their ranking and underlying relationship. CSFs for PMIS identified through a literature review, and consolidated by interviews and pilot studies with professionals in construction industry. A questionnaire instrument was sent out to experienced users (Construction Manager and Constructor) in Korea, and 253 completed questionnaires were retrieved. To increase the generalizability of the results, the respondents were spread across construction site. Using factor analysis and considering the high importance of the factor, CSFs were grouped into three dimensions. All these three groupings and their relationship were included in a framework for successful PMIS in construction projects. These findings help to clarify what the high prioritized factors are, and could also be used as an assessment tool to evaluate the performance of PMIS and thus help to identify areas for improvement.

  • PDF

Economic Analysis of Economic Steel beam method. (ES 빔 공법의 경제성 분석)

  • Choi, Tae-Ho;Woo, Jong-Yeol;Hong, Seong-Wook;Seo, Yong-Chil;Shin, Chan-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.133-136
    • /
    • 2011
  • This study concerned with the steel beam of bonding method and bonded steel beams by this method and both ends of different height, steel beams and steel beams in the center makes the junction. Both ends and the central part of steel beams connecting the lower flange by additional combining steel plates to convey stress, the stress to focus on the beam connections are passed to both ends of steel beams, and strength of beam connections is improved and steel structural beams is proposed to minimize the loss by Incision. If you use the developed method, the construction period is shortened, and reducing the amount of material can decrease the cost and reduction in floor height can be maximized business feasibility.

  • PDF

The practical analysis of the gap of ledger scaffolding - focus on Pipe scaffolding - (강관비계 띠장 간격의 실무적 해석 - 단관비계 중심으로 -)

  • Bae, Jun-Tae;Kim, Chi-Gyeong
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2012.04a
    • /
    • pp.301-311
    • /
    • 2012
  • The law(construction standard specification, construction, standard-work regulation, Industry safety standard related regulation) related to the installation of scaffolding being used commonly on the construction site is regulated that the gap of ledger is within 1.5m and first ledger is within 2m. The gap of ledger here is essential for the stability of scaffolding structure. But it is determined that it is possible for the gap of ledger is applied by explaining safety handrail as ledger, because of the fact that in current, on the construction site, safety handrail is installed with the material of scaffolding ledger as a steel tube pipe. On this study, it is aimed to guarantee the safety by analyzing the ledger of scaffolding practically and prevent the accident of manager and laborer through the actualization.

  • PDF

Comparative Analysis on the Railway Construction Criteria with Regard to the Trans-Korea Railway Project and the Railway Modernization of DPRK (남북철도 현대화를 위한 남북한 철도건설기준 비교 분석)

  • Kim, Sang-Gyun
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.6
    • /
    • pp.1011-1017
    • /
    • 2009
  • In pursuit of the Trans-Korea Railway (TKR) project connecting the Korean peninsular by a rail link, it is critical that the two railway systems in ROK and DPRK are comparable in criteria and standards. Yet, there is substantial divergence of the construction criteria between the two sides, which hinders from conducting the TKR project as well as the railway modernization of DPRK. In this regard, study and comparison of the criteria are a prerequisite for mitigating the hinderance. This study investigated the laws and regulations relating to the railway technologies and construction and in particular conducted a comparative analysis of both railway systems with a focus on railway facilities such as track, structures, electric power and signaling. The results of this study will provide a useful information for the improvement of existing lines and the construction of new lines in DPRK.

Exploring Long-Term Performance in Design-Build Best-Value Evaluation Criteria

  • Calahorra-Jimenez, Maria;Poore, Tanner
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.74-82
    • /
    • 2022
  • Improving long-term performance in highway projects is an imperative goal for public administrations. Project delivery and procurement methods might provide an opportunity to align design and construction processes with this goal. Previous studies have explored whether project delivery methods impact the long-term performance of highway projects. However, these studies did not focus specifically on how core elements within the procurement might relate to long-term performance. Thus, this research aims to fill this gap by exploring to what extent and how long-term evaluation criteria are considered in design-build best-value procurement of highway projects. To this end, content analysis was conducted on 100 projects procured between 2009 and 2019 by 19 DOTs across the U.S. The analysis of 365 evaluation criteria found that (1) roughly 11% of them related to long-term performance. (2) The weight given to these criteria in the overall technical proposal was lower than 30%. (3) Sixty-five percent (65%) of long-term evaluation criteria focused on design while 15% related to materials and technology, respectively. The results of this study are a first steppingstone to initiate a deep exploration of the relationship between procurement practices and actual project performance. Currently, with sustainability and life cycle assessments being top concerns in infrastructure projects, this line of research might be of particular interest to DOTs and highway agencies across the U.S. and worldwide.

  • PDF

An Application of the Analytical Hierarchy Process (AHP) for Safety measurement in Malaysian Construction Industry

  • Samad Doostdar;Zubaidah Ismail
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.66-73
    • /
    • 2013
  • Analytical Hierarchy Process (AHP) is a famous method amongst Multi Criteria Decision Making (MCDM), set up by Saaty in 1980. AHP can be determined as a methodology of hierarchical analysis following reasonable decision making with make simpler a difficult crisis. Decision making in systems of Safety management concerned multipart challenges. AHP is process for get better the composite decisions understanding with analyzes of the problem in a structure of hierarchy. The integration all of applicable decision criteria, their pair wise judgment permits the decision maker to establish the trade-offs amongst objectives. In recent years, Malaysian's economy and infrastructure development have significantly and rapidly risen. The construction industry continues to play a major role in this development as many construction activities have been carried out to meet the high demands of the expansive market. However, the construction industry has faced a wide range of challenges, one of which is the frequent occurrences of accidents at the workplace. An effective safety program can substantially reduce accidents because it can help management to build up safer means of operations and create safe working environments for the workers. Furthermore, by having an effective safety programs, good safety culture can be embedded in organization because it can encourage mutual cooperation between management and workers in the operations of the programs and decisions that affect their safety and health. The focus of this research is development methodology of Analytics Hierarchy Process (AHP) in construction safety factors and investigates the levels of some effective elements in SMS in Malaysian construction industries.

  • PDF

Proposed a Checklist for the Classification of Construction Business Model by Utilizing the Price Influence Factors and the Construction Regulation - As Focus on Aged Public Rental Apartment - (가격영향요인과 건설제도를 활용한 건설사업 유형분류 체크리스트 제안 - 노후공공임대주택 중심으로 -)

  • Park, Seongsik;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.6
    • /
    • pp.132-141
    • /
    • 2019
  • 1990s, Construction market continued to grow in South Korea exceeding 20% of GDP. In 2015, more than 30 years of old multi-family dwellings amounted to 4.93 million and it continues to increase until 2019. In Particular, the share of Public rental Housing accounts for 90.6% of South Korea's Total aging housing. Before checking the feasibility of Construction Project Management such as Renovation and Reconstruction, Checklists were presented through price impact factor analysis and analysis of housing construction system(Regulation). Based on 32 Price Influencing factors and 20 Indicators based on the housing construction system The Construction project management seems appropriate. As a result, the 22 complexes were found to be suitable for remodeling. This study is meaningful enough to be used for Domestic rental Housing construction and Construction project management and to suggest specificity. Future Research is needed to Quantify the checklist.

A Study on the Preprocessing for Finite Element Analysis of 3-Dimensional Structures.(With Focus on Geometric Modelling) (3차원 구조물의 유한요소해석 전처리에 관한 연구(기하학적 모델링을 중심으로))

  • 이재영;이진휴;한상기
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1990.10a
    • /
    • pp.40-46
    • /
    • 1990
  • This paper introduces a geometric modelling system adopted in a newly developed preprocessor for finite element analysis of three dimensional structures. The formulation is characterized by hierarchical construction of structural model which consists of control points, curves, surfaces and solids. Various surface and solid modeling schemes based on blending functions and boundary representation are systematized for finite element mesh generation. The modeling system is integrated with model synthesis and operations which facilitate modelling of complex structures.

  • PDF

On Subject auxiliary inversion in English (주어-조동사 도치에 관한 소고)

  • Suh, Jin-Hee
    • English Language & Literature Teaching
    • /
    • no.6
    • /
    • pp.143-157
    • /
    • 2000
  • It has been one of the puzzles in the English syntax that so called the rule of subject-auxiliary inversion (SAI) is not allowed in subject wh-movement while it is not obligatory in non-subject wh-movement in a root sentence. This asymmetry has been a puzzle since SAI itself was thought to be a part of question construction as we can observe from yes/no questions. The asymmetry gets more complicated in terms of sentence embedding, i.e no SAI is permitted in the embedded context in question. The goal of this paper is to suggest an unified analysis for this unsolved grammatical phenomena on the basis of Rizzi (1997)'s recent work. The main idea is that SAI is not a I-to-C movement but one of I-to-Focus where Focus is a functional category and its phrase is located between CP and IP. The other proposal is that Wh-movement is no more homogeneous in terms of landing site between a root and an embedded sentence: the target for a wh-phrase in the former is the Spec of FocP (Focus Phrase) but the one in the latter is the Spec of CP as the standard theory assumes. Pesetsky (l999)'s analysis is discussed and its theoretical and empirical shortages are pointed out. Its rather radical proposals such as the one that the nominative case is just an uninterpretable tense feature of DP and the other that 'that' is no longer a complementizer but an element of I(nflection) make it less acceptable in spite of the possibility that it can get rid of Case theory entirely, which would be ideal in the spirit of minimalism.

  • PDF

Risk Management Software Utilization in the Singapore Construction Industry: Evaluation and Improvement

  • Hwang, Bon-Gang;Chua, Pee Mee
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.28-36
    • /
    • 2011
  • Risk management is popularly and widely used in various industries to handle uncertainty that can negatively affect their businesses. While in the current Information-Technology oriented age, software packages are designed to assist in carrying out risk management processes, the construction industry does not seem to have software that is tuned to its specific characteristics and processes. Therefore, this study first explores the types of software that are commonly used for risk management in the Singapore construction industry. Also, using one-sample t-test, it is tested if the software programs used in the construction industry have effectively catered the needs of the users. For the analysis, a survey questionnaire was developed and the representatives from 34 companies participated in the survey. Furthermore, this study also makes use of the current risk management framework defined in ISO31000 to design a risk management software algorithm that can suit the needs for the Singapore construction industry. The results from this study will contribute to identifying strategic areas, in terms of use of risk management software, on which the industry needs to focus, ultimately enhancing their performance of risk management.