• 제목/요약/키워드: flow duration

검색결과 701건 처리시간 0.032초

회귀식을 이용한 황룡A 유역에서의 유황별 유달율 산정 (Estimation of Pollutant Loads Delivery Ratio by Flow Duration Using Regression Equation in Hwangryong A Watershed)

  • 정재운;윤광식;주석훈;최우영;이용운;류덕희;이수웅;장남익
    • 한국농공학회논문집
    • /
    • 제51권6호
    • /
    • pp.25-31
    • /
    • 2009
  • In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.

유황곡선과 공간 내삽 알고리즘을 이용한 일유출량 특성의 지역화 (Regionalization of Daily Flow Characteristics Using Flow Duration Curve and Spatial Interpolation Algorithm)

  • 윤용남;김재성;이동률
    • 한국수자원학회논문집
    • /
    • 제33권6호
    • /
    • pp.671-679
    • /
    • 2000
  • 미계측지점에서의 일유출량 시계열을 합성하기 위한 도구로서 유황곡선과 공간내삽알고리즘을 이용한 지역화기법이 개발되었다. 본 연구에서는 낙동강 유역의 8개 유량 관측 지점들 중 일부를 미계측지점으로 가정하여 지역화 기법을 통해 미계측 지점의 유황곡선을 합성하였으며, 합성된 유황곡선을 공간 내삽 알고리즘에 적용하여 미계측 지점의 일유출수문곡선을 합성하였다. 미계측지점으로서 가정된 지점에서의 관측 수문곡선과 합성 수문 곡선을 비교한 결과는 상당히 좋은 값을 나타내었으며, 이로써 지역화 기법이 대상 하천의 유출 특성을 잘 나타내어 주는 기법임을 알 수 있었다. 이는 복잡한 매개 변수 산정을 필요로 하고 시간과 비용이 많이 드는 확정론적 모형의 적용 없이도 합리적인 일유출량 정보를 지역화 기법을 통해 획득할 수 있음을 보여준다. 그리고, 수자원 실무에서 많이 이용되는 비유량법과의 비교를 통해 지역화 기법이 비유량법보다 더 좋은 결과를 나타냄을 확인하였다.

  • PDF

오염총량평가를 위한 부하지속곡선 개발 및 적용 (Development of Load Duration Curve Methodology for TMDL Evaluation)

  • 강두기;강순구;김상단;신현석
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2007년도 학술발표회 논문집
    • /
    • pp.652-656
    • /
    • 2007
  • The major streams in South Korea have established the TMDL(Total Maximum Daily Loads) regulation for just 4 years. Traditional concepts in water quality management in South Korea are based upon the selection of a design streram flow which is 10-year averged flow exeedance probability 75%(Q275). That is, a single flow value based upon average long term flow conditions is chosen for application in dilution calculations, permit design, water quality modeling, etc. While these TMDLs seems to satisfy the requirement of the target water quality regulations, they have contributed little to any watershed/waterbody assessment and restoration plans. These types of TMDLs do little to characterize the problems the TMDLs are intended to address. For TMDLs to be more beneficial in the assessment and implementation process, TMDLs should reflect adequate water quality across flow conditions rather than at a single flow value such as average daily flow. In this paper, we developed LDC (load duration curve) methodology for theevaluation of Korean TMDL evaluation based on watershed scaled, physically based on SWAT(Soil and Water Assessment Tool) model.

  • PDF

소수력발전소의 성능예측 기법 (A Study on the Performance Prediction Technique for Small Hydro Power Plants)

  • 박완순;이철형
    • 한국수소및신에너지학회논문집
    • /
    • 제14권1호
    • /
    • pp.61-68
    • /
    • 2003
  • This paper presents the methodology to analyze flow duration characteristics and performance prediction technique for small hydro power(SHP) Plants and its application. The flow duration curve can be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction technique has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique, Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated, It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.

압축착화기관용 가변밸브 듀레이션(VVD)시스템의 제어전략에 따른 유동 및 연소성능 해석 (Flow and Combustion Characteristics according Control Strategy of Variable Valve Duration System for Compression Ignition Engine)

  • 조인수;김우택;이진욱
    • 한국분무공학회지
    • /
    • 제25권2호
    • /
    • pp.45-50
    • /
    • 2020
  • Recently, global warming and environmental pollution are becoming more important, and fuel economy is becoming important. Each automobile company is actively developing various new technologies to increase fuel efficiency. CVVD(Continuously Variable Valve Duration) system means a device that continuously changes the rotational speed of the camshaft to change the valve duration according to the state of the engine. In this paper, VVT(Variable Valve Timing) and CVVD were applied to a single-cylinder diesel engine, and the characteristics of intake and exhaust flow rate and in-cylinder pressure characteristics were analyzed by numerical analysis. In order to analyze the effect of CVVD on the actual engine operation, the study was performed by setting the valve control and injection pressure as variables in two sections of the engine operating region. As a result, In the case of applying CVVD, the positive overlap with the exhaust valve is maintained, thus it is possible to secure the flow smoothness of air and increase the volumetric efficiency by improving the flow rate. The section 2 condition showed the highest peak pressure, but the pressure rise rate was similar to that of the VVT 20 and CVCD 20 conditions up to 40 bar due to the occurrence of ignition delay.

수질오염총량관리 단위유역 유량측정자료를 이용한 유황곡선 작성 (Development of a Flow Duration Curve with Unit Watershed Flow Data for the Management of Total Maximum Daily Loads)

  • 박준대;오승영;최윤호
    • 한국물환경학회지
    • /
    • 제28권2호
    • /
    • pp.224-231
    • /
    • 2012
  • It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.

8일 유량 및 일유량 자료를 이용한 오염부하지속곡선의 변화 분석 (Analysis of Load Duration Curve Difference using 8 Day and Extended Daily Flow)

  • 권필주;류지철;김홍태;임경재
    • 한국수자원학회:학술대회논문집
    • /
    • 한국수자원학회 2017년도 학술발표회
    • /
    • pp.166-166
    • /
    • 2017
  • 현재 우리나라에서 많은 연구에 활용되고 있는 오염부하지속곡선(Load duration curve, LDC)은 단일 기준유량의 문제점을 개선하기 위해 전체 유량 범위를 고려한 수질오염총량관리제(Total Maximum Daily Loads, TMDL) 평가 기법으로 개발되었다(Choi et al., 2012). LDC를 이용해 목표수질 달성여부를 분석하기 위해서는 일유량자료를 바탕으로 유량지속곡선(Flow Duration Curve, FDC)의 작성이 선행되어야 하는데(Park and Oh, 2012), 365일 연속적으로 측정된 실측 자료를 이용하는 것이 가장 확실하고 정확한 방법이다. 그러나 현재 환경부에서는 총량관리 단위유역에서 8일 간격으로 실측 유량 및 수질 측정이 이루어지고 있고, 특히 주로 비강우 시에 측정이 이루어지고 있는 실정이기 때문에 고유량에 대한 모니터링 자료가 부족한 실정이다. 이 같은 이유로 많은 연구에서 불연속적인 평균 8일 간격 유량을 그대로 사용하거나 일유량자료를 확보하기 위해 다양한 방법을 이용하고 있다. 그러나 이러한 유량자료의 변동은 유랑지속곡선에 변화를 주고 결과적으로는 LDC를 이용한 목표수질 달성여부를 판단함에 있어 불확실성이 있다. 이에 본 연구의 목적은 환경부 총량측정망 8일유량자료와 이와 연계성이 있는 국토교통부 하천유량 측정망 일유량자료를 이용하여 각각의 LDC를 작성하고, 이러한 일유량과 8일유량 사용이 LDC를 이용하여 목표수질에 대한 오염부하 특성분석에 어떠한 영향을 미치는지 유량 조건별로 차이를 비교분석하는 데 있다.

  • PDF

유량-부하량관계식을 이용한 지석천 유역의 부하지속곡선 적용 및 유황별 유달율 산정 (Application of Load Duration Curve and Estimation of Delivery Ratio by Flow Durations Using Discharge-Load Rating Curve at Jiseok Stream Watershed)

  • 박진환;김갑순;황경섭;이용운;임병진
    • 한국물환경학회지
    • /
    • 제29권4호
    • /
    • pp.523-530
    • /
    • 2013
  • This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.

댐건설(建設)로 인한 5대수계(大水系) 본류(本流)의 유황변화(流況變化) 분석(分析) (An Analysis of the Effect of Damming on Flow Duration Characteristics of Five Major Rivers in Korea)

  • 이진원;김형섭;우효섭
    • 대한토목학회논문집
    • /
    • 제13권3호
    • /
    • pp.79-91
    • /
    • 1993
  • 한강, 낙동강, 금강, 섬진강, 영산강 등 우리나라 5대강 본류 주요지점에서의 광범위한 수문자료(水文資料)를 토대로 유황분석(流況分析)을 수행하였다. 우리나라 하천유량 자료의 신뢰도상의 한계를 감안하여, 특히 저수위시수위(低水位時水位)-유량(流量) 관계곡선의 검토 동 본 유황분석에서 이용된 유량자료의 검토에 세심한 배려를 하였다. 본 연구에 의하면, 우리나라 주요 수계의 유황은 상류에 다목적댐 건설로 상당히 개선된 것으로 나타났으며, 이러한 유황개선 효과는 주요 수계의 하상계수(河狀係數)가 댐 건설이전 자연상태에서 300-400 정도이었으나 댐 건설이후 100-300 정도로 감소한 사실과 본 연구에서 제시된 '유황계수(流況係數)'가 대폭 감소한 사실 등에 의해서 확인되어진다. 수계별로는 한강과 영산강의 유황은 상대적으로 안정되어 있고 금강과 섬진강의 유황은 불안정한 것으로 나타났으며, 이러한 결과는 금강과 섬진강에 새로운 수자원 개발의 필요성을 간접적으로 시사하고 있다.

  • PDF

댐 건설에 따른 하류 유황의 변화 분석 (An Analysis on the Changes of flow Duration Characteristics due to Dam Construction)

  • 김태균;윤용남;안재현
    • 한국수자원학회논문집
    • /
    • 제35권6호
    • /
    • pp.807-816
    • /
    • 2002
  • 본 연구에서는 댐 건설에 따른 댐 하류 유황의 변화에 대해 살펴보고자 하였다. 이를 위해 대청댐이 위치해 있는 금강유역을 대상으로 하였으며, 댄 건설 전후의 인공위성 영상자료를 분석해서 댐 하류 수표면의 변화를 평가하였고, 유황변화에 대한 분석을 위해서는 대청댐 하류에 위치한 공주 수위관측소의 자료를 이용해서 댐의 건설에 따른 하류 유황변화를 분석을 실시하고 그 영향을 평가하였다. 또한, 댐의 홍수조절에 따른 홍수량 규모의 변화를 살펴보기 위해 대청댐 하류의 공주와 규암지점의 연 초과치 계열에 대한 빈도해석을 실시하고 그 변화를 분석하였다. 이를 통해 댐이 하류하천의 유황을 개선하고 일정하게 유지해서 안정적인 수자원 공급을 가능하게 해주는 역할과 첨두유량의 감소로 홍수피해를 저감시켜주는 역할을 동시에 담당하고 있음을 알 수 있었으며, 수자원의 관리 및 이용측면에서 이·치수에 기여하는 댐의 긍정적인 효과를 다시 한번 확인할 수 있었다.