Journal of The Korean Society of Agricultural Engineers
/
v.51
no.6
/
pp.25-31
/
2009
In this study, pollutant loads delivery ratio by flow duration in Hwangryoung A watershed was estimated. The delivery ratio was estimated with measured data by Ministry of Environment(MOE) and the regression equation based on geomorphic parameters. Eight day interval flow data measured by the MOE were converted to daily flow to calculate daily load and flow duration curve by correlating data of neighboring station which has daily flow data. Regression equation developed by previous study was tested to study watershed and found to be satisfactory. The delivery ratios estimated by two methods were compared. For the case of Biochemical oxygen demand(BOD), the delivery ratios of low flow condition were 7.6 and 15.5% by measured and regression equation, respectively. Also, the delivery ratios of Total phosphorus(T-P) for normal flow condition were 13.3 and 6.3% by measured and regression equation, respectively.
Regionalization technique using flow duration curve and spatial interpolation algorithm is developed for the purpose of estimating daily flow time series at ungauged station. In this study, we assumed a part of 8 gauging stations of Nakdong River basin as ungauged stations. Then, we generated flow duration curves and daily flow hydrographs by regionalization technique at ungauged stations. And we compared generated and observed hydrographs. The simulation results showed that the observed flows were well simulated by the proposed method and that the general patterns of the observed flows were satisfactorily reproduced by the regionalization technique. From these results, it is possible that we obtain daily flow information without application of labour intensive and time consuming deterministic models, which require complicating quantification of model parameter values. And we compared the regionalization techniques with the specific discharge method which is the most general approach in hydrological practice in Korea. The results showed that the regionalization technique was superior to specific discharge method.method.
Proceedings of the Korea Water Resources Association Conference
/
2007.05a
/
pp.652-656
/
2007
The major streams in South Korea have established the TMDL(Total Maximum Daily Loads) regulation for just 4 years. Traditional concepts in water quality management in South Korea are based upon the selection of a design streram flow which is 10-year averged flow exeedance probability 75%(Q275). That is, a single flow value based upon average long term flow conditions is chosen for application in dilution calculations, permit design, water quality modeling, etc. While these TMDLs seems to satisfy the requirement of the target water quality regulations, they have contributed little to any watershed/waterbody assessment and restoration plans. These types of TMDLs do little to characterize the problems the TMDLs are intended to address. For TMDLs to be more beneficial in the assessment and implementation process, TMDLs should reflect adequate water quality across flow conditions rather than at a single flow value such as average daily flow. In this paper, we developed LDC (load duration curve) methodology for theevaluation of Korean TMDL evaluation based on watershed scaled, physically based on SWAT(Soil and Water Assessment Tool) model.
Transactions of the Korean hydrogen and new energy society
/
v.14
no.1
/
pp.61-68
/
2003
This paper presents the methodology to analyze flow duration characteristics and performance prediction technique for small hydro power(SHP) Plants and its application. The flow duration curve can be decided by using monthly rainfall data at the most of the SHP sites with no useful hydrological data. It was proved that the monthly rainfall data can be characterized by using the cumulative density function of Weibull distribution and Thiessen method were adopted to decide flow duration curve at SHP plants. And, the performance prediction technique has been studied and development. One SHP plant was selected and performance characteristics was analyzed by using the developed technique, Primary design specfications such as design flowrate, plant capacity, operational rate and annual electricity production for the SHP plant were estimated, It was found that the methodology developed in this study can be a useful tool to predict the performance of SHP plants and candidate sites in Korea.
Recently, global warming and environmental pollution are becoming more important, and fuel economy is becoming important. Each automobile company is actively developing various new technologies to increase fuel efficiency. CVVD(Continuously Variable Valve Duration) system means a device that continuously changes the rotational speed of the camshaft to change the valve duration according to the state of the engine. In this paper, VVT(Variable Valve Timing) and CVVD were applied to a single-cylinder diesel engine, and the characteristics of intake and exhaust flow rate and in-cylinder pressure characteristics were analyzed by numerical analysis. In order to analyze the effect of CVVD on the actual engine operation, the study was performed by setting the valve control and injection pressure as variables in two sections of the engine operating region. As a result, In the case of applying CVVD, the positive overlap with the exhaust valve is maintained, thus it is possible to secure the flow smoothness of air and increase the volumetric efficiency by improving the flow rate. The section 2 condition showed the highest peak pressure, but the pressure rise rate was similar to that of the VVT 20 and CVCD 20 conditions up to 40 bar due to the occurrence of ignition delay.
It is necessary to develop flow duration curve (FDC) on each unit watershed in order to analyze flow conditions in the stream for the management of Total Maximum Daily Loads (TMDLs). This study investigated a simple method to develop FDC for the general use of the curve. A simple equation for daily flow estimation was derived from the regression analysis between the 8-day interval flow data of a unit watershed and the daily flow monitoring data of an adjacent upstream region. FDC can be prepared with the calculation of daily flow by the equation for each unit watershed. An annual and a full-period FDC were drawn for each unit watershed in Guem river basin. Standard flow such as low and ordinary flow can be obtained from the annual FDC. Major percentile of flow such as 10, 25, 50, 75 or 90% can be obtained from the full-period FDC. It is considered that this simple method of developing FDC can be utilized more widely for the calculation of standard flow and the assessment of water quality in the process of TMDLs.
Proceedings of the Korea Water Resources Association Conference
/
2017.05a
/
pp.166-166
/
2017
현재 우리나라에서 많은 연구에 활용되고 있는 오염부하지속곡선(Load duration curve, LDC)은 단일 기준유량의 문제점을 개선하기 위해 전체 유량 범위를 고려한 수질오염총량관리제(Total Maximum Daily Loads, TMDL) 평가 기법으로 개발되었다(Choi et al., 2012). LDC를 이용해 목표수질 달성여부를 분석하기 위해서는 일유량자료를 바탕으로 유량지속곡선(Flow Duration Curve, FDC)의 작성이 선행되어야 하는데(Park and Oh, 2012), 365일 연속적으로 측정된 실측 자료를 이용하는 것이 가장 확실하고 정확한 방법이다. 그러나 현재 환경부에서는 총량관리 단위유역에서 8일 간격으로 실측 유량 및 수질 측정이 이루어지고 있고, 특히 주로 비강우 시에 측정이 이루어지고 있는 실정이기 때문에 고유량에 대한 모니터링 자료가 부족한 실정이다. 이 같은 이유로 많은 연구에서 불연속적인 평균 8일 간격 유량을 그대로 사용하거나 일유량자료를 확보하기 위해 다양한 방법을 이용하고 있다. 그러나 이러한 유량자료의 변동은 유랑지속곡선에 변화를 주고 결과적으로는 LDC를 이용한 목표수질 달성여부를 판단함에 있어 불확실성이 있다. 이에 본 연구의 목적은 환경부 총량측정망 8일유량자료와 이와 연계성이 있는 국토교통부 하천유량 측정망 일유량자료를 이용하여 각각의 LDC를 작성하고, 이러한 일유량과 8일유량 사용이 LDC를 이용하여 목표수질에 대한 오염부하 특성분석에 어떠한 영향을 미치는지 유량 조건별로 차이를 비교분석하는 데 있다.
Park, Jinhwan;Kim, Kapsoon;Hwang, Kyungsup;Lee, Yongwoon;Lim, Byungjin
Journal of Korean Society on Water Environment
/
v.29
no.4
/
pp.523-530
/
2013
This study has been carried out to clarify the characteristics of discharge and pollutant loading according to flow conditions at jiseok stream watershed (JSW). A flow rate and pollutant load in the study watershed were estimated by equation of stage-discharge and discharge-loads rating curve. By using the methods above, I've evaluated the water quality (WQ) of the JSW if it is satisfied with the standard target. I've collected the data of BOD and T-P from the JSW every 8 days for the duration of 12 months. And then, I've schematized the data upon the load duration curve and the results showed me that the WQ of JSW was satisfied with the standard target. I've also collected the same data every each day for the duration of 12 months from JSW and have schematized the data again. And the results showed that it also was satisfied with the standard target. To be concluded, I've determined that point pollution sources of JSW gives more significant impacts to the WQ than non-point pollution sources of JSW and hence, as time goes, point pollution sources will keep depriciating the WQ of JSW. Therefore, further efforts will be required to JSW to maintain the WQ.
KSCE Journal of Civil and Environmental Engineering Research
/
v.13
no.3
/
pp.79-91
/
1993
An analysis of flow duration characteristics of the five major rivers in Korea was conducted with extensive river flow data available. The analysis reveals that, for most river stage-gauging stations at the rivers investigated in this study, the flow duration characteristics have changed drastically at some stations after major dammings in the river basins. Streamflow variability. which is newly defined in this study as the ratio of the 2.5 percents (or 10 day) duration discharge over the 97.5 percents (or 355 day) duration one, was also reduced by the dammings. The result of the study shows that the Han and the Yeongsan rivers have relatively small flow variation, while the Seomjin and the Keum rivers have relatively large now variation, which implies that the latter two river basins need new water resources development.
The purpose of the present study was to evaluate the changes of flow duration characteristics of a large river basin due to construction of a dam. The changes of water surface are quantified from remote sensing film taken before and after dam construction. Gongiu gauging station was selected to analyze the changes of flow duration, and annual exceedance series of Gongju and Kyuam gauging station were selected to estimate the changes of flood quantile before and after dam construction. From the analysing results, it was found that the construction of dam contributes to make new duration stable and to decrease flood flow. In conclusion, it was confirmed that the construction of the dam is useful for water supply and flood prevention.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.