• Title/Summary/Keyword: floors

Search Result 875, Processing Time 0.026 seconds

Calculations of Flat Plate Deflections Considering Effects of Construction Loads and Cracking (시공하중 및 균열 효과를 고려한 플랫 플레이트의 처짐 산정)

  • Kim, Jae-Yo;Im, Ju-Hyeuk;Park, Hong-Gun
    • Journal of the Korea Concrete Institute
    • /
    • v.21 no.6
    • /
    • pp.797-804
    • /
    • 2009
  • The structural designs of RC flat plates that have insufficient flexural stiffness due to lack of support from boundary beams may be governed by serviceability as well as a strength criteira. Specially, since over-loading and tensile cracking in early-aged slabs significantly increase the deflection of a flat plate system under construction, a construction sequence and its impact on the slab deflections may be decisive factors in designs of flat plate systems. In this study, the procedure of calculating slab deflections considering construction sequences and concrete cracking effects is proposed. The construction steps and the construction loads are defined by the simplified method, and then the slab moments, elastic deflections, and the effective moment of inertia are calculated in each construction step. The elastic deflections in column and middle strips are magnified to inelastic deflections by the effective moment of inertia, and the center deflection of slab are calculated by the crossing beam method. The proposed method is verified by comparisons with the existing test result and the nonlinear analysis result. Also, by applications of the proposed method, the effects of the slab construction cycle and the number of shored floors on the deflections of flat plates under construction are analyzed.

Computational Optimization for RC Columns in Tall Buildings (초고층 철근콘크리트 기둥의 전산최적설계 프로세스)

  • Lee, Yunjae;Kim, Chee-Kyeong;Choi, Hyun-Chul
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.3
    • /
    • pp.401-409
    • /
    • 2014
  • This research develops tools and strategies for optimizing RC column sections applied in tall buildings. Optimization parameters are concrete strength and section shape, the objective function for which is subject to several predefined constraints drawn from the original structural design. For this purpose, we developed new components for StrAuto, a parametric modeling and optimization tool for building structure. The components receive from external analysis solvers member strengths calculated from the original design model, and output optimized column sections satisfying the minimum cost. Using these components, optimized sections are firstly obtained for each predefined concrete strength applied to the whole floors in the project building. The obtained results for each concrete strength are comparatively examined to determine the fittest sections which will also result in the fittest vertical zoning for concrete strength. The main optimization scenario for this is to search for the vertical levels where the identical optimized sections coincide for the two different concrete strengths in concern, and select those levels for the boundaries where a concrete strength will be changed to another. The optimization process provided in this research is a product of an intensive development designed for a specific member in a specific project. Thus, the algorithm suggested takes on a microscopic and mathematical approach. However, the technique has a lot of potential that it can further be extensively developed and applied for future projects.

The Actual Condition investigation of Residental Environment of Urban Life-Type Housing Regarding Crime Prevention Through Environmental Design -Focused on Five Single Households in studio-type housings in Gwanak-gu, Seoul Urban Life-Type Housing- (도시형생활주택의 범죄예방환경설계 측면에서 본 주거환경 실태조사에 관한 연구 - 서울시 관악구 원룸형 주택 1인가구 5개를 중심으로-)

  • Jung, Yoon-Hye;Lee, You-Mi;Lee, Youn-Jae
    • KIEAE Journal
    • /
    • v.16 no.6
    • /
    • pp.39-50
    • /
    • 2016
  • Purpose: The purpose of this study is to be performed with studio-type housings among urban life-type housings to investigate the physical characteristic and crime-related factors of studios from the viewpoint of the basic principles of crime prevention through environmental design (CPTED). Method: Eight CPTED guidelines available in Korea were reviewed to select 20 planing factors for actual condition investigation. Five single households in studio-type housings in Gwanak-gu, Seoul, were chosen according to the subject screening criteria to perform the actual condition investigation. Results: First, a lighting plan around a building for natural surveillance should consider the building location, relation with the front road, and surrounding facilities. In a building of a piloti structure, the parking lot and the building gate should be arranged in a manner that enables natural surveillance. Second, the shape of the corridors in studio-type housings should be considered to plan the installation of a lighting at the door of each household, the installation of a viewer window at the door of each household, and the arrangement of the elevator. Third, to support access control, an access control system having the function of video and voice communication is recommended to be installed at the building gate. Criteria for the type of security windows and the floors on which security windows should be installed, and the regulations about the CCTV installation inside and outside the building should be prepared. Fourth, to enhance territoriality in parking lots, ground patterns, parking lot gate, and signs may be installed. Fifth, in view of effective utilization and maintenance, lighting facilities should be installed to increase the usability of ground parking lots, and relevant installation criteria should be prepared regarding the type, number, and brightness of the lightings.

A Study on the Improving Management Method for the Small Projects Applying Senior Construction Engineer (고령 건설기술자를 활용한 소규모공사의 공사관리방법 개선에 관한 연구)

  • Song Jin-Woo;Lee Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.305-310
    • /
    • 2004
  • The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than $200m^2$ of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing all the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.

  • PDF

Shaking Table Test for Seismic Performance Evaluation of Non-Seismic Designed Wall-Type Apartment (내진설계 되지 않은 공동주택의 진동대 실험에 의한 내진성능 평가)

  • Chung, Lan;Lee, Joung-Woo;Park, Tae-Won
    • Journal of the Korea Concrete Institute
    • /
    • v.18 no.6 s.96
    • /
    • pp.721-728
    • /
    • 2006
  • Earthquakes are reported thai building structures have been colossal damaged, but before 1988 designed structures which were not applicate seismic design code have no seismic performance. Especially, for the apartment structures were indicated that it have no resist wall element of earthquake before 1988 designed structures. We have to evaluate for seismic performance this structures, therefore it will be retrofitted for seismic index sufficient structures. We performed seismic performance evaluation for model structures by MIDAS which is general structure analysis software. In this study, it was performed shaking table test to evaluate model structure which is reinforcement concrete and 5 floors for seismic performance index. We made specimens by similar's law and tested shaking table test. In the shaking table test it is not performed prototype model test because of space and equipment condition. So we had made scale-down model for 1/5 by similar's law. That's why it needs for the evaluation of performance. However, it is not possible to do an experiment of prototype owing to the shortage of space and the limit of an experimental instrument in the shaking table test. Then, modeling and reducing the part of prototype do the experiment. In this experiment a shaking table test is done and seismic performance of model structures is evaluated by using similitude laws for scale down specimen. As a result it is proved that non-seismic design structures need to retrofit since seismic performance shows life safe grade in 0.12g of an earthquake.

A Numerical Study for the Atrium Smoke Control by Fire Shutter and Evacuation (방화셔터를 이용한 아트리움 제연과 피난안전에 관한 수치해석 연구)

  • Jeon, Heung-Kyun;Choi, Young-Sang;Choo, Hong-Lok
    • Fire Science and Engineering
    • /
    • v.24 no.5
    • /
    • pp.50-59
    • /
    • 2010
  • Four fire scenarios, as the cases of fire sizes of 2 MW and 5 MW, and no installation and activation of atrium fire shutter for dormitory building of Daegu 'D college', were developed and fire simulations were run using FDS (ver. 5.5.0) and Pathfinder 2009 programs. By assessing fire and evacuation, the effects of atrium fire shutter and vents on the smoke control of atrium were evaluated and this study also analyzed fire hazard and egress safety for occupants in the dormitory. Fire shutter's preventing smoke transport around atrium was much effective, but smoke layer descended down the design limit of smoke height and kept about 2 m height from the atrium floor in all cases because flow rate through vents was not enough. For the case of 5 MW fire and no fire shutter, fire hazard was higher due to visibility than temperature and allowable egress time to stairwell was short less than 5 seconds for the occupants on the floors of 4F to 7F. For total occupants, egress time out of main doorway was calculated about 136 seconds. It is sure that additional systems improving the performance of smoke control need to be installed for more safe evacuation.

The structural safety diagnosis of Dabo Pagoda of Bulkuk Temple using analyses of ultrasonic wave velocity (초음파 속도 분석을 통한 불국사 다보탑 구조 안전 진단)

  • Suh, Man-Cheol;Song, In-Sun;Choi, Hui-Soo
    • Journal of the Korean Geophysical Society
    • /
    • v.5 no.3
    • /
    • pp.199-209
    • /
    • 2002
  • We have carried out a nondestructive close examination for the purpose of the structural safety diagnosis of the Dabo Pagoda of Bulkuk temple located in Kyungju, Kyungbuk Korea. For estimating the mechanical properties of each rock block of the pagoda, ultrasonic measurements were conducted at 641 points of 255 blocks. The P-wave velocity ranges from 584m/sec through 5,169m/sec, and averages 2,901m/sec Based on this result, the uniaxial compressive strength was estimated to be $93{\sim}1,943kg/cm^2\;with\;396kg/cm^2$ of average, and the index of weathering is $0.07{\sim}0.88$ with 0.43 of average, which means the moderate degree of weathering. The comparison of the rock strength of each block with the overburden acting on the block reveals that the rock blocks related to the structure of the pagoda are relatively sound for uniform stress, but it is highly possible for a concentrated stress to lead to a partial failure. We suggest a monitoring of cracks due to the concentrated stress. The parapets of 1st and 2nd floors composed of small rock pieces are severely weathered. However, this is not directly related to the structural safety of the pagoda.

  • PDF

Development of the Automatic Feeder for Growing-finishing Pigs (육성비육돈용 자동급이기 사료공급장치 개발에 관한 연구)

  • Yoo, Y.H.;Song, J.I.;Choi, H.C.;Kim, J.H.;Park, K.H.;Kang, H.S.;Chang, D.I.
    • Journal of Animal Environmental Science
    • /
    • v.15 no.3
    • /
    • pp.241-250
    • /
    • 2009
  • This study was conducted to develop an prototype automatic feeder (AF) for growing-finishing pigs. The main components of AF were a feed storage hopper, a feeding motor, a feed agitator, a control box and a programmable IC, which were controlled by a personal computer. The powder type feed transfer rate of AF was average $9.83{\pm}0.4\;g\;s^{-1}$. In feeding test, growing pigs (Landrace) of about 43 kg live weight were used in the study, and was fed over a 6 weeks in pens with solid concrete floors. For feeding trials with AF, the operation time of the feeding motor was set to 2, 3, 4, 5, and 6 seconds per feeding. Pigs frequently used AF from 05:00 to 11:00 and from 11:00 to 17:00 without relationship to the operation time of the feeding motor. The AF operation time of the feeding motor to minimize feed loss was between 2 and 4 seconds. Pigs fed with AF had same or slightly higher average daily gam (0.8~0.9 kg) than that with a commercial feeder, and average daily feed intake (2.76~2.93 kg) and feed conversion ratio (3.10~3.66) of pigs fed with AF were same or lower than those with the commercial feeder except the operation time of the feeding motor set to 6 seconds. As a result, AF would help to use and improve the productivity of growing-finishing pigs.

  • PDF

Utilization of Charcoal as an Environmentally Friendly Building Materials (II) - A Study on the Energy Saving and Sound Insulation Characteristics of Building Materials Prepared with Charcoal - (목탄을 이용한 친환경 건축자재 이용기술(II) - 목탄 함유 건축자재의 에너지 절감 및 차음 특성에 관한 연구)

  • Ahn, Byoung-Jun;Paik, Ki-Hyon
    • Journal of the Korean Wood Science and Technology
    • /
    • v.39 no.1
    • /
    • pp.41-52
    • /
    • 2011
  • This study was carried out to investigate the effect of energy saving and sound insulation of building materials mixed with charcoal. To investigate the functionality of building based on the difference of construction materials, three different experimental buildings were constructed. They were buildings built with the conventional construction materials (A), the charcoal construction materials (B), and the charcoal-sericite construction materials (C). The study showed that energy consumption could be reduced approximately 9.5% and 14.5% by replacing A with B and C, respectively. Especially, it is revealed that the lower outdoor temperature was, the higher energy saving effect was. Also, after shutoff the boiler switch the decrease rate of room temperature of the one using B was lower than those of others using A and C so that the room temperature at the building using B was higher by $3.5{\sim}4.2^{\circ}C$ in the 1 meter air above the ground and by $4.4{\sim}5.4^{\circ}C$ on the floor surface after 12 hours passed. In the building noise test the heavy-and light-weight impact sound of the plate, represented by criterion of noise between floors in multi-story building, tended to decrease in the test sample containing charcoal.

A study on the Characteristics of Structural Proportion of Pillar and 'Kong-po' in 'Main Hall of Royal Palace(正殿)' of the Royal Palace (궁궐(宮闕) 정전(正殿)에서 기둥과 공포의 구조적(構造的) 비례특성(比例特性)에 관한 연구(硏究))

  • Park, Eon-Kon;Choi, Hyo-Sik
    • Journal of architectural history
    • /
    • v.14 no.1 s.41
    • /
    • pp.71-87
    • /
    • 2005
  • 4 royal palaces are currently remained from capital city (Seoul) of 'Cho-Sun(朝鮮)' period. In these palaces, 'Main hall of Royal Palace(正殿)' is the center of the Royal Palaces. The 'Main hall of Royal Palace' of the Royal Palace was the best building of that time. Therefore there were many studies about the 'Main hall of Royal Palace'. But these studies were individual studies of these 'Main hall of Royal Palace'. Therefore, this study is to analyze and compare 4 'Main hall of Royal Palace' of the Royal palaces. It is to study the proportion regarding the Diameter of the pillar, the Height, the pillar and pillar Interval's Distance, and the arrangement of 'Kong-Po(bracket sets)'. With these studies, it is to prove that the 'Main hall of Royal Palace' is the building which high construction technique of this time is expressed. Result of this study is as followings; First, the proportion of pillar height(H) to its diameter(D) average from H=8.0 to 8.5D. Only the Myeong-Jeong-Jeon omitted the 'Go-Ju(高柱)' in the 'Toi-Kan (退間)' to place Ea-Jwa(御座). Second, Second, the proportion of diameter of the pillar of 'Eoi-Bu-Pyeong-Ju(外部平柱)' and 'Nae-Jin-Go-Ju(內陣高柱)' average D1(Diameter of 'Eoi-Bu-Pyeong-Ju') =0.91D2 (Diameter of 'Nae-Jin-Go-Ju'). In regards to the height, the single floor 'Main hall of Royal Palace' and double floor 'Main hall of Royal Palace' seems to be different. The height proportion of the double floor 'Main hall of royal palace' is H1(Height of 'Eoi-Bu-Pyeong-Ju')=0.34H2(Height of 'Nae-Jin-Go-Ju') and single floor 'Main hall of Royal Palace' has a proportion of H1=0.62H2. Third, in Geun-Jeong-Jeon, with the proportion of height and diameter of the pillar, interval's distance between pillars and diameter, the pillar interval distance and height, of 'Ea-kan(御間)' from the 'Toi-Kan' is different from 'Main hall of Royal Palace'. This is because the structure of 'Toi-Kan' of Geun-Jeong-Jeon is not stable. In order to reinforce this, 'Gui-Go-Ju(隅高柱)' of the Geun-Jeong-Jeon jut out $4{\sim}7%$ more compared to In-Jeong-Jeon. Fourth, when comparing double floor 'Main hall of royal palace' of Geun-Jeong-Jeon and In-Jeong-Jeon, based on distance of 'Eoi-Bu-Pyeong-Ju' and 'Nae-Jin-Go-Ju' of lower level, the 'Sang-Bu-Pyeong-Ju(上部平柱)' of Geun-Jeong-Jeon jut out $4{\sim}7%$ more compared to the In-Jeong-Jeon and also It becomes thicker. Fifth, the arrangement of 'Kong-Po' on the front row of 'Gan(間)' had to do with the change of side 'Gan'. Even though the Geun-Jeong-Jeon and the In-Jeong-Jeon were double floors, the arrangement of the 'Kong-Po' is different because the number of side bay is different.

  • PDF