Improving streamflow and flood predictions through computational simulations, machine learning and uncertainty quantification

  • Venkatesh Merwade;Siddharth Saksena;Pin-ChingLi;TaoHuang
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.29-29
    • /
    • 2023
  • To mitigate the damaging impacts of floods, accurate prediction of runoff, streamflow and flood inundation is needed. Conventional approach of simulating hydrology and hydraulics using loosely coupled models cannot capture the complex dynamics of surface and sub-surface processes. Additionally, the scarcity of data in ungauged basins and quality of data in gauged basins add uncertainty to model predictions, which need to be quantified. In this presentation, first the role of integrated modeling on creating accurate flood simulations and inundation maps will be presented with specific focus on urban environments. Next, the use of machine learning in producing streamflow predictions will be presented with specific focus on incorporating covariate shift and the application of theory guided machine learning. Finally, a framework to quantify the uncertainty in flood models using Hierarchical Bayesian Modeling Averaging will be presented. Overall, this presentation will highlight that creating accurate information on flood magnitude and extent requires innovation and advancement in different aspects related to hydrologic predictions.

  • PDF

Preliminary Release Scheme by Flood Forecasting (홍수예측에 의한 예비방유 방안)

  • Sim, Myeong-Pil;Lee, Jae-Hyeong;Gwon, O-Ik
    • Water for future
    • /
    • v.29 no.1
    • /
    • pp.235-248
    • /
    • 1996
  • Apreliminary release scheme (PRS) is suggested for the operating rules during flood period to deal with conflicts between flood control and water conservation purposes. PRS can be used to decide the optimum releases, based on the forecast of an oncoming flood and flow rate at the control point downstream when comparing the variable restricted water level (VRWL) for flood control with the minimum required water level (MRWL) for conservation use. The model is applied to Chungju and Daechung reservoirs through simulations of the technique. This study illustrates the procedure to decide the time and size for preliminary releases. Also, effects of duration and magnitude of preliminary release are reviewed based on historicqal flood records. The simulation results indicate that the proposed PRS is effective for the managers to find optimal operating policies during flood period. The proposed scheme can be used with main release scheme using real-time operation on hour-to-hour basis to decide the release for a flood.

  • PDF

Assessing the Suitability of Satellite Precipitation Products for Flood Modeling in the Tonle Sap Lake Basin, Cambodia

  • Oudom Satia Huong;Xuan-Hien Le;Giha Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.176-176
    • /
    • 2023
  • The Tonle Sap is the richest and diverseness of freshwater ecosystem in Southeast Asia, receiving nurturing water flows from the Mekong and its immediate basin. In addition, the rapid development in the Tonle Sap Lake (TSL) Basin, and flood inundation may threaten the natural diversities and characteristics. The impacts of flood inundation in 11 sub-basins contributing to the Tonle Sap Lake were assessed using the Rainfall-Runoff-Inundation (RRI) model to quantify the potential magnitude and extent of the flooding. The RRI model is set up by using gauged rainfall data to simulate the information of river discharge and flood inundation of huge possible flood events. Moreover, two satellite precipitation products (SPPs), CHIRPS and GSMaP, within respectively spatial resolutions of 0.05° and 0.1°, are utilized as an input for the RRI model to simulate river discharge, flood depth, and flood extent for the great TSL Basin of Cambodia. This study used statistical indicators such as NSE, PBIAS, RSR, and R2 as crucial indices to evaluate the performance of the RRI model. Therefore, the findings of this study could provide promising guidance in hydrological modeling and the significant implications for flood risk management and disaster preparedness in the region.

  • PDF

Simulation and validation of flash flood in the head-water catchments of the Geum river basin

  • Duong, Ngoc Tien;Kim, Jeong Bae;Bae, Deg-Hyo
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2021.06a
    • /
    • pp.138-138
    • /
    • 2021
  • Flash floods are one of the types of natural hazards which has severe consequences. Flash floods cause high mortality, about 5,000 deaths a year worldwide. Flash floods usually occur in mountainous areas in conditions where the soil is highly saturated and also when heavy rainfall happens in a short period of time. The magnitude of a flash flood depends on several natural and human factors, including: rainfall duration and intensity, antecedent soil moisture conditions, land cover, soil type, watershed characteristics, land use. Among these rainfall intensity and antecedent soil moisture, play the most important roles, respectively. Flash Flood Guidance is the amount of rainfall of a given duration over a small stream basin needed to create minor flooding (bank-full) conditions at the outlet of the stream basin. In this study, the Sejong University Rainfall-Runoff model (SURR model) was used to calculate soil moisture along with FFG in order to identify flash flood events for the Geum basin. The division of Geum river basin led to 177 head-water catchments, with an average of 38 km2. the soil moisture of head-water catchments is considered the same as sub-basin. The study has measured the threshold of flash flood generation by GIUH method. Finally, the flash flood events were used for verification of FFG. The results of the validation of seven past independent events of flash flood events are very satisfying.

  • PDF

A Flood Routing for the Downstream of the Kum River Basin due to the Teachong Dam Discharge (대청댐 방류에 따른 금강 하류부의 홍수추적)

  • Park, Bong-Jin;Gang, Gwon-Su;Jeong, Gwan-Su
    • Journal of Korea Water Resources Association
    • /
    • v.30 no.2
    • /
    • pp.131-141
    • /
    • 1997
  • In this study, the Storage Function Method and Loopnet Model (Unsteady flow analysis model) were used to construct the flood prediction system which can predict the effects of the water release in the downstream region of Teachong Dam. The regional frequency analysis (L-moment) was applied to compute frequency-based precipitation, and the flood prediction system was also used for flood routing of the down stream region of Teachong Dam in the Kum River Basin to calculate frequency based flood. The magnitude of flood, water level, discharge, and travel time to the major points of the downstream region of Teachong Dam, which can be used as an imdex of flood control management of Teachong Dam, were calculated.

  • PDF

A Channel Flood Routing by Muskingum Method Incorporating Lateral Inflows (측방 유입수를 고려한 자연 하도의 Muskingum 홍수추적)

  • 강인주;윤용남
    • Water for future
    • /
    • v.23 no.3
    • /
    • pp.385-395
    • /
    • 1990
  • Three-parameter Muskingum flood routing model which incorporated the inflows alongside the river channel is applied for the Waegwan-Jeukpogyo reach of the Nakdong River using the flood data of 12 selected flood events experienced in this reach. The flood routing equations for three-parameter model were expressed as a system of finite difference equations and the routing constants were directly computed by matrix inversion method. Then, the three parameters, which consist of the storage constants(K), weighting fator(x), and lateral inflow parameter(α), were determined from the computed routing constants. The results of the present study showed that the model can predict with a fair accuracy the flood discharges at the downsteam end of the reach. The parameters K and x were seen as channel parameters which have close relations with the flood magnitude, whereas the lateral inflow parameter was shown to be strongly governed by the rainfall characteristics of the tributary watersheds contributing to the lateral inflows.

  • PDF

Study on Estimation and Application of the Fwl-D-F curves for Urban Basins (도시유역의 Fwl-D-F 곡선 산정 및 활용에 관한 연구)

  • Choi, Hyun-Il;Kim, Eung-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.7
    • /
    • pp.2687-2692
    • /
    • 2010
  • There have been performed many researched for flood magnitude analysis, for example, the Flood-Duration-Frequency relations in the west. Because flood water stage data are more available rather than flood amount data at flood gauge stations of Korea, this study developed Flood water level-Duration-Frequency (Fwl-D-F) curves using rainfall Intensity-Duration-Frequency(I-D-F) curves for the quantitative flood risk assessment in urban watersheds. Fwl-D-F curve is made from water level data for 18 years at Joongrayng bridge station of Joongrayng River basin in Han River drainage area. Fwl-D-F curve can estimate the occurrence frequency for a certain flood elevation, which can be used for urban flood forecasting. It is expected that the flood elevation can be estimated from the forecasted rainfall data using both Fwl-D-F and I-D-F curves.

Development of Extreme Flood Database through Historical Records (역사 문헌을 통한 극한홍수 데이터베이스 구축)

  • Cho, Han-Bum;Kim, Hyeon-Jun;Noh, Seong-Jin;Jang, Chul-Hee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.741-745
    • /
    • 2007
  • The magnitude of natural disaster is much bigger than the past. Only short time return period can be estimated due to limited number of measured data. Therefore, back-data extension studies are undergoing in various area through historical records. In this study, data gathering and analysis of historical flood records such as Joseon wangjo sillok(Annals of Joseon Dynasty) and Jeungbo munheon bigo (enlarged encyclopedic literature) was achieved for the usage of extreme flood study in various ways. Analysis of 479 flood events from Joseon wangjo sillok and 143 flood events from Jeungbo munheon bigo during Joseon Dynasty was conducted in statistical way.

  • PDF

Hydrological Studies on the design flood and risk of failure of the Hydraulic Structures( II) (수리구조물의 파괴위험도와 설계홍수량에 관한 수문학적 연구(II) - 비연초과치 계열을 중심으로 -)

  • 이순혁;박명근
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.28 no.3
    • /
    • pp.69-78
    • /
    • 1986
  • This studies were established to find out the characteristics of frequency distributiom for the number of occurrence and magnitude, probable flood flows according to the return periods, design floods, and design frequency factors for the studying basins in relation to the risk levels which can be correlated with design return period and the life of structure in the non-annual exceedance series. Eight watersheds along Han, Geum, Nak Dong and Seom Jin river basin were selected as studying basins. The results were analyzed and summarized as follows. 1. Poisson distribution and Exponential distribution were tested as a good fitted distributions for the number of occurrence and magnitude for exceedance event, respectively,at selected watersheds along Han, Geum, Nak Dong and Seom Jin river basin. 2.Formulas for the probable flood flows and probable flood flows according to the return periods were derivated for the exponential distribution at the selected watersheds along Han, Geum, Nak Dong, and Seom Jin river basin. 3.Analysis for the risk of failure was connected return period with design life of structure in the non-annual exceedance series. 4.Empirical formulas for the design frequency factors were derivated from under the condition of the return periods identify with the life of structure in relation to the different risk levels in the non-annual exceedance series. 5.Design freguency factors were appeared to be increased in proportion to the return periods while those are in inverse proportion to the levels of the risk of failure. Numerical values for the design frequency factors for the non-annual exceedance series ware appeared generally higher than those of annual maximum series already published by the first report. 6. Design floods according to the different risk levels could be derivated by using of formulas of the design frequency factors for all studying watersheds in the nor-annual exceedance series.

  • PDF

The optimal operation of reservoir systems during flood season (홍수기 저수지의 최적연계운영)

  • Han, Kun-Yeun;Choi, Hyun-Gu;Kim, Dong-Il;Lee, Kyeong-Teak
    • 한국방재학회:학술대회논문집
    • /
    • 2008.02a
    • /
    • pp.743-746
    • /
    • 2008
  • Recently, due to the effect of global warming and extreme rainfall, the magnitude of flood disaster and the frequency of flood is rapidly increasing. In order to mitigate the damage of human and property from this kind of meteorological phenomenon and manage water resources scientifically, effective operation of dam and reservoir is very important. In case of Andong dam which was not performed a flood control function needs to develop new types of dam safety management measure because of recent extraordinary flood by typhoons. In case of Andong dam and Imha dam, I am using HEC-5 model in order to apply reservoir simulation. In this case, complex conditions among 100-year floods , 200-year floods and PMF was used. Also, I modified the maximum outflow 3,800m3/s into 3,490m3/s and applied this modified discharge in order to secure freeboard in the downstream. In an analysis that I applied modified outflow by 100-year floods and 200-year floods to, the result showed that river didn't overflow in Andong area but some other places have relatively low freeboard. In the cases that I modified maximum outflow, results showed that freeboard of levee is larger than existed simulation. In the simulation that I applied 200-year floods and PMF to and under a condition connected with PMF, results showed overflowing the levees. Because of the difference between the frequency of dam outflow and the design flood in river, it is required to improve the existed flood plan in the downstream of Andong dam. As a result of this study, the optimal operation of reservoir systems can be proposed to mitigate the flood damage in the downstream of Andong dam and also can be used to establish the flood plans.

  • PDF