Abstract
Apreliminary release scheme (PRS) is suggested for the operating rules during flood period to deal with conflicts between flood control and water conservation purposes. PRS can be used to decide the optimum releases, based on the forecast of an oncoming flood and flow rate at the control point downstream when comparing the variable restricted water level (VRWL) for flood control with the minimum required water level (MRWL) for conservation use. The model is applied to Chungju and Daechung reservoirs through simulations of the technique. This study illustrates the procedure to decide the time and size for preliminary releases. Also, effects of duration and magnitude of preliminary release are reviewed based on historicqal flood records. The simulation results indicate that the proposed PRS is effective for the managers to find optimal operating policies during flood period. The proposed scheme can be used with main release scheme using real-time operation on hour-to-hour basis to decide the release for a flood.
홍수기중의 홍수조절과 이수의 서로 상반된 목적을 다루기 위해 예비방류 방안을 제안하였다. 예비방류 방안은 홍수조절목적의 가변제한수위와 이수목적의 최소확보 저수위를 고려하는 경우에, 홍수예측과 하류 조절점에서의 유량으로부터 저수지의 최적방류량을 결정하는데 이용할 수 있다. 본 모형은 대청과 충주다목적 댐을 대상으로 모의운영하였다. 예비방류의 시기와 크기를 결정하는 절차를 설명하고, 또한 과거의 홍수사상을 토대로 그 효과에 대해서도 검토하였다. 모의운영한 결과에 의하면 예비방류 방식의 조절방안은 단일 다목적 저수지의 홍수기중 최적 운영계획을 수립하는데 효율적이며, 아울러 실제의 홍수시에는 실시간 운영과 병행하여 이용할 수 있다.