• Title/Summary/Keyword: flood level reduction

Search Result 52, Processing Time 0.023 seconds

Dam Effects on Spatial Extension of Flood Discharge Data and Flood Reduction Scale II (홍수 유출자료의 공간확장과 홍수저감효과에 대한 댐 영향 분석 II)

  • Jung, Yong;Kim, Nam Won;Lee, Jeong Eun
    • Journal of Korea Water Resources Association
    • /
    • v.48 no.3
    • /
    • pp.221-231
    • /
    • 2015
  • This is a continuous study on the dam effects for the spatial extension of flood data. In this study, flood reduction rates of dams and their influences on downstream using the spatially extended flood data were implemented. Nam-Han River was selected for measuring the impacts of ChoongJu and HoangSung dams. In the evaluations of flood reduction rate at dams, the larger flood events have the lower flood reduction rates for both dams. At the YeoJoo water level station, the analyses of the relations between flood reduction rates and the sizes of watersheds dams located were performed. the sizes of watersheds having a functional dam have highly influenced on the reduction rates of flood. The average of flood reduction rates was smaller than the area rate. For instances, area rates of HoangSung (0.02) and ChoongJu dams (0.6) are larger than the average flood reduction rates for HoangSung (0.01) and ChoongJu dams (0.51), respectively. However, the water level station follows the dam flood reduction characteristics of dams themselves. The spatial effects of dam flood reductions are analyzed based on the three water level stations (GangChun, YeoJoo, YangPyung). The distance of flood reduction rates lower than 0.1 as average flood reduction rate was the area 7 times of watershed having a dam with 0.02 as a minimum reduction rate.

A Case Study on Development of Stormwater Retention and Infiltration Pond System (우수저류 및 침투연못 시스템개발 사례연구 - 우수 저류 및 침투 효과를 중심으로 -)

  • Lee, Jae Chul;Yoon, Yeo Jin
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.6 no.4
    • /
    • pp.52-61
    • /
    • 2003
  • This study was carried out to analyze the effects of stormwater retention and infiltration pond on reduction of flood peak and volume in a experimentally developed ecological pond. The experimental site has 542$m^2$ watershed area, 1,310mm yearly-averaged rainfall. And the area of the retention pond is 60$m^2$, the maximum water depth is 0.5m, the maximum and average storage is 15$m^3$and 9.3$m^3$d. And the area of infiltration pond is 58$m^2$, and the water depth varies 0.2m~0.5m. The monitoring system consists of one rainfall gage, one Parshall flume and acoustic water level gage, two rectangular weirs and acoustic water level gage for discharge gaging, and one data recording unit. Data from ten storm events in total, three storm events in year 2000 and seven storm events in year 2001, were collected. From the data the evaporation rate was achieved with the water balance equation, and the result shows 5.0mm/day in average. The result from the analysis of the effects on reduction of flood peak and volume, is that 14% reduction of flood volume and 15% reduction of flood peak in retention pond and 49% reduction of flood volume in infiltration pond.

Analysis for the Effect of Channel Contraction for Sedimentation Reduction on the Flood Level and Bed Changes in the Lower Nakdong River (낙동강 하류의 퇴사저감을 위한 하폭축소방법이 홍수위변화 및 하상변동에 미치는 영향 분석)

  • Jang, Eun-Kyung;Ji, Un
    • Journal of Environmental Science International
    • /
    • v.22 no.3
    • /
    • pp.291-301
    • /
    • 2013
  • Sediment from the upstream channel has been deposited near the Nakdong River Estuary Barrage (NREB) due to the mild slope and decreased velocity. The annual mechanical dredging to ensure the flood capacity has been performed to remove the deposited sediment. However, the dredging method is not considered as an effective countermeasure due to high cost and long time to operate. Therefore, many methods for sedimentation reduction have been proposed for NREB. Especially, the channel contraction method to mitigate sedimentation problem by changing the channel geometry from 2 km to 3 km upstream of NREB has been recently suggested as an effective countermeasure. However, there is the possibility that the channel contraction method induces flood level increase compared to original condition. Therefore, it is necessary to investigate quantitatively the flood level changes in the upstream and downstream section due to the channel contraction method for NREB. In this study, water level changes by 10% channel contraction of whole width has been evaluated using the HEC-RAS model and simulated with and without channel contraction for various flood discharge. As a result, water level in the section where the channel was contracted was decreased by 0.02 m and flood level at the upstream of channel contracted was increased up to 0.015 m for the 500-year flood.

Sensitivity Analysis on Flood Level Changes by Offline Storage Creation Based on Unsteady Flow Modeling (부정류 모의 기반 오프라인 저류지 조성에 따른 홍수위 변화 민감도 분석)

  • Eun-kyung Jang;Un Ji;Sanghyeok Kim;Jiwon Ryu
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.4
    • /
    • pp.217-225
    • /
    • 2023
  • This study analyzed the effect of flood level reduction in the case of creating and operating offline storage for the Jangdong district, which can be used as a flood buffer space for the Geumgang River, through one-dimensional unsteady flow numerical simulation. In particular, the sensitivity analysis of changes in the height and width (length) of transverse weirs on flood level changes was performed to provide quantitative information necessary for flood control facility (embankment) design. As a result of analyzing the flood control effect of the offline storage based on the peak flood discharge and level, spatially, the flood control effect at the planned flood buffer space site and the downstream end was confirmed, and it was confirmed that the flood reduction effect at the downstream occurred the most. By design conditions of the transverse overflow weir, the greatest flood reduction effect was found under the condition that the overflow weir height based on the 50-year frequency flood level and the transverse overflow weir width (length) of 125 m were considered. The effect of delaying the time to reach the maximum flood due to the operation of the offline storage site was also presented based on unsteady flow modeling.

Analysis of Economic Effectiveness for Flood Control of Dam (댐의 홍수조절에 의한 경제적 효과분석)

  • Choi, Seung-An;Yi, Choong-Sung;Shim, Myung-Pil;Kim, Hung-Soo
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.5
    • /
    • pp.383-396
    • /
    • 2007
  • The studies on efficiency of flood control reservoir has been introduced into four categories including direct flood control contribution by reservoir, flow-duration change and environmental-ecological change in downstream of dam and flood damage estimation of flood plain. In spite of all the previous approaches, the quantification of the effect of reservoir on the flood control in planning stage is quite complex due to lack of a standard for quantifying feasibility of project. In this study, we develop a methodology that can clearly and accurately quantify the flood damage reduction together with the existing flood level reduction at downstream. The proposed approach uses three appraisal standards of flood control: 'potential safety', 'relative risk' and 'absolute risk' according to the risk by stage. The developed methodology was applied to the Namhan river basin with the storm event of July, 2006. The result shows the damage reduction of 4,189 billion won was estimated. The economic benefits for the flood control effect by dam will greatly contribute to the public understanding of the importance and the effect of the flood control by dam.

A study on prediction method for flood risk using LENS and flood risk matrix (국지 앙상블자료와 홍수위험매트릭스를 이용한 홍수위험도 예측 방법 연구)

  • Choi, Cheonkyu;Kim, Kyungtak;Choi, Yunseok
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.9
    • /
    • pp.657-668
    • /
    • 2022
  • With the occurrence of localized heavy rain while river flow has increased, both flow and rainfall cause riverside flood damages. As the degree of damage varies according to the level of social and economic impact, it is required to secure sufficient forecast lead time for flood response in areas with high population and asset density. In this study, the author established a flood risk matrix using ensemble rainfall runoff modeling and evaluated its applicability in order to increase the damage reduction effect by securing the time required for flood response. The flood risk matrix constructs the flood damage impact level (X-axis) using flood damage data and predicts the likelihood of flood occurrence (Y-axis) according to the result of ensemble rainfall runoff modeling using LENS rainfall data and as well as probabilistic forecasting. Therefore, the author introduced a method for determining the impact level of flood damage using historical flood damage data and quantitative flood damage assessment methods. It was compared with the existing flood warning data and the damage situation at the flood warning points in the Taehwa River Basin and the Hyeongsan River Basin in the Nakdong River Region. As a result, the analysis showed that it was possible to predict the time and degree of flood risk from up to three days in advance. Hence, it will be helpful for damage reduction activities by securing the lead time for flood response.

Plan for Flood Control Linked with Dam and River Basin (댐과 하천유역을 연계한 홍수 대응 방안 - 2020년 섬진강 홍수사상을 대상으로 -)

  • Kyong Oh Baek;Dong Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.81-86
    • /
    • 2023
  • In this study, a one-dimensional numerical model was constructed to propose a flood control plan linked with the dam and river basin for the flood events of the Seomjin River in 2020. The flood level reduction of the downstream river was tested based on a scenario operation of the Seomjingang Dam and was also analyzed when a storage pocket was newly constructed as one of the river basin measures. It was confirmed that Seomjingang Dam's flood control capacity would be increased if the flood limit level was drastically lowered from the current EL. 196.5 m to EL. 188.0 m. In addition, if the upper area of the (old) Geumgok Bridge (which suffered great damage due to the loss of the levee) is used as a storage pocket, it would be effective in preventing floods in the lower area of it. In the era of the climate crisis, more integrated flood management is needed and basic river management must be observed.

Analysis of Flood Level Changes by Creating Nature-based Flood Buffering Section (자연성기반 홍수완충공간 조성에 따른 홍수위 변화 분석)

  • Ryu, Jiwon;Ji, Un;Kim, Sanghyeok;Jang, Eun-kyung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.6
    • /
    • pp.735-747
    • /
    • 2023
  • In recent times, the sharp increase in extreme flood damages due to climate change has posed a challenge to effectively address flood-related issues solely relying on conventional flood management infrastructure. In response to this problem, this study aims to consider the effectiveness of nature-based flood management approaches, specifically levee retreat and relocation. To achieve this, we utilized a 1D numerical model, HEC-RAS, to analyze the flood reduction effects concerning floodwater levels, flow velocities, and time-dependent responses to a 100-year frequency flood event. The analysis results revealed that the effect of creating a flood buffer zone of the nature-based solution extends from upstream to downstream, reducing flood water levels by up to 30 cm. The selection of the flow roughness coefficient in consideration of the nature-based flood buffer space creation characteristics should be based on precise criteria and scientific evidence because it is sensitive to the flood control effect analysis results. Notably, floodwater levels increased in some expanded floodplain sections, and the reduction in flow velocities varied depending on the ratio of the expanded cross-sectional area. In conclusion, levee retreat and floodplain expansion are viable nature-based alternatives for effective flood management. However, a comprehensive design approach is essential considering flood control effects, flow velocity reduction, and the timing of peak water levels. This study offers insights into addressing the challenges of climate-induced extreme flooding and advancing flood management strategies.

Flow Analysis of Rivers by using FESWMS-2DH (FESWMS-2DH를 이용한 하천의 흐름 해석)

  • Lee, Cheol-Eung;Shim, Jae-Wook;Park, Dong-Heon
    • Journal of Industrial Technology
    • /
    • v.29 no.A
    • /
    • pp.111-122
    • /
    • 2009
  • In this study, flood stage was computed by HEC-RAS, 1-D numerical analysis model and FESWMS-2DH, 2-D numerical model. Flood stages computed by two different models were compared for straight line, dot axle watercourse, dead-zone watercourse, section sudden-changing watercourse, and curved watercourse. From the results, flow velocity and water level were similar in straight watercourse and dot-reduction watercourse. However, there was difference of flow velocity and water level in dead-zone watercourse, sudden expansion, dot-reduction, and curve-watercourse. This result might be influenced by rapid change of watercourse due to dead-zone, the angle of inflow and outflow, and the curvature. Especially in this study, numerical model was applied to Wol-Song-Cheon at Chuncheon in order to analyze the effect of flood stage by two different models. By flowing properties around the bridge and confluence of rivers, it was found that flow velocity and water level was changed. Therefore, it was concluded that a lot of uncertainties are contained in the present bank.

  • PDF

Affecting Water Supply Capacity Followed by Allocating Flood Control Volume in Heightening Reservoir (홍수조절용량 설정에 따른 증고저수지의 용수공급능력 변화)

  • Noh, Jae-Kyoung
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.57-70
    • /
    • 2010
  • This study was performed to analyze the affect of water supply capacity followed by allocating flood control volume in heightening reservoir, of which Baekgog reservoir was selected as a case study in here. Baekgog reservoir is located in Jincheon county, Chungbuk province, of which full water level will be heightened from EL. 100. 1m to EL. 102.1m, and total storage from 21.75M $m^3$ to 26.67M $m^3$. Flood inflow with 200year frequency was estimated to 997 $m^3$/s in peak flow and 22.54M $m^3$ in total volume. Reservoir flood routing was conducted to determine flood limited water levels, which was determined to have scenarios such as EL 97-98-99m in periods of 6.21.-7.20., 7.21.-8.20., and 8.21.-9.20., respectively, EL 97-97-97m, EL 98-98-98m in present reservoir, and EL 99-100-101m, EL 99-99-99m, and EL 100-100-100m in heightened reservoir. Reservoir inflow was simulated by DAWAST model. Annual paddy irrigation requirement was estimated to 33.19M $m^3$ to 2,975ha. Instream flow was allocated to 0.14mm/d from October to April. Operation rule curve was drawn using inflow, irrigation and instream flow requirements data. In case of withdrawal limit reservoir operation using operation rule curve, reduction rates of annual irrigation supply before and after flood control by reservoir were 2.0~4.3% in present size and 1.5~3.6% in heightened size. Reliability on water supply was decreased from 77.3% to 63.6~68.2% in present size and from 81.6% to 72.7~79.5% in heightened size. And reduction rates of water storage at the end of year before and after flood control by reservoir were 7.3~16.5% in present size and 7.7~16.9% in heightened size. But water supplies were done without any water deficiency through withdrawal limit reservoir operation in spite of low flood regulating water level.

  • PDF