• Title/Summary/Keyword: flood control method

Search Result 231, Processing Time 0.025 seconds

Estimation of Travel Time in Natural River and Dam Outflow Conditions Considering Rainfall Conditions and Soil Moisture Accounting (강우조건과 토양함수상태를 고려한 자연하천과 댐 방류량 조건에서의 도달시간 산정)

  • Kim, Dong Phil;Kim, Kyoung Ho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.38 no.4
    • /
    • pp.537-545
    • /
    • 2018
  • Determination of the time parameters such as the travel time in the design flood is very important. The travel time is mainly used for flood and river management, and the travel time of non flood season is used for maintenance flow and management of the river. Estimation of travel time for natural rivers is mainly based on the geomorphological factors of the basin. In addition to the topographical factors, the travel time is calculated by considering the factors of the runoff curve, velocity and rainfall intensity. However, there is no study on the estimation of travel time considering both the rainfall condition and the soil moisture accounting by the frequency period. Therefore, the travel time calculation is divided into the case of setting the Hwanggang Dam and the Imjin bridge water level station of Imjin river as the natural river considering rainfall condition by the frequency period and the soil moisture accounting, and the case of traveling the Imjin bridge water level station according to the condition of outflow of the Hwanggang Dam. For the sections set as natural rivers, the results were verified by comparing with the newly developed travel time calculation method. Based on the results, the travel times of the Hwanggang Dam outflow conditions were calculated. The time to travel in this study can be secured flood control of the Imjin river basin and time to prepare for danger when outflowing the the Hwanggang Dam.

A Case Study of Calculating Flood Inundation Area by HEC-GeoRAS (HEC-GeoRAS 모형에 의한 침수면적산정 사례연구)

  • Kim, Chang-Soo;Lee, Young-Dai;Lee, Hwan-Woo
    • Journal of Korean Society of societal Security
    • /
    • v.2 no.4
    • /
    • pp.43-48
    • /
    • 2009
  • During the past few years, Korea has experienced extraordinary floods, which have caused many damages of lives and properties. Flooding caused by typhoon is the most common disastrous phenomenon of nature among all catastrophes. As the average temperature of the earth has been increasing by global warming, the possibility of typhoon is also increased by abnormal climate changes. Along with the river improvement as a part of flood control, the time of concentration has been decreased, so the pick discharge has been increased. Moreover, with the land development activities, the area of storage has been diminishing, and the damages from inundation have been continuously increasing. There were a lot of damages to farmland in 1960's, industrial and public facilities in 1970's, and a lot of sufferings from the windstorm in 1980's. In 1990's, however, the amount of damages was increased substantially. So, there is need to decrease the number of the victims and loss of properties by applying preventive measures against natural calamities. This study has employed a simulation system to calculate the depth and amounts of inundation areas to forecast and prevent from flood damage by using rainfall-runoff model. In this study, a case study method is adopted to show inundation by using rainfall-runoff model, HEC-GeoRAS and Arcview. It is hoped that, this study would be conducive to professionals and organizations working in the field of disaster management.

  • PDF

Utilization of Peace Dam for Conservation Purpose (이수측면에서 평화의댐 활용방안 연구)

  • Yi, Jae-Eung;Lim, Dong-Sun;Lee, Jong-Tae
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.8
    • /
    • pp.653-662
    • /
    • 2004
  • In this study, the method of Increasing the flood control as well as conservation effects is studied by joint operation of Hwacheon and Peace Dam. After completing the second phase of the construction of the Peace Dam, the dam crest height will be increased from 225m and the storage capacity will also be increased. If storage capacity is increased and gates are installed, it will assist not only flood control but also conservation of the entire Han river basin. Considering the change of conservation levels, the change of the restricted water level of the Hwacheon Dam in flood season, and the inflow change into the Peace Dam through the simulated reservoir operation, the annual average power of Hwacheon Dam with 95% reliability, annual firm power, the volume of water supply is calculated. As a result, when the conservation level of the Peace Dam and the restricted water level of the Hwacheon Dam are increased, the generation capacity will be improved. However, even though the inflow decrease, the generation capacity will not be affected. If the inflow decrease under the same conditions, the water supply capability will be reduced to the range from 35% to 40%. It is necessary to increase conservation level to keep the same water supply capability.

Behavior Analysis of Earth Retaining Wall with S.G.P method (강판을 사용한 흙막이 벽체공법(SGP) 거동분석)

  • Cho, Seong-Ha;Choi, Gwan-Woo;You, Kwong-Ho;Kim, Sung-Duk;Kim, Young-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.03a
    • /
    • pp.1269-1277
    • /
    • 2008
  • In this study, the behavior of retaining wall composed with soldier pile and steel plate is analysed. The steel guided plate(SGP) method is applied to the site near the riverside in which geotechnical condition results in flood and large deformation. Following the concept of preventing infiltration from huge permeability stratum and decreasing deformation with strengthened stiffness simultaneously, this method is discussed its effectiveness with the instrumentation data. Also the differences of behavior between predicted and detected are investigated with numerical methods. It is found that SGP has a good deal of advantages with regard to balancing between control of permeability and deformation. In addition, it is revealed that SGP can give resonable construction plan for sustaining stiffness for which the sheetpiling method cannot be adopted effectively in waterfront condition.

  • PDF

Development for Eco-Design of Hydraulic Structures based on Web-based Information System (친환경 정비공법 선정 지원을 위한 웹기반 정보시스템 구축)

  • Cho, Young-Kweon;Kim, Kwan-Ho;Kim, Han-Joong;Choi, Soo-Myung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.50 no.1
    • /
    • pp.95-106
    • /
    • 2008
  • Eco-friendly material and implementation methods have become important along with the existing standardized maintenance concept for the irrigation and flood control. However, the intrinsic function of the hydraulic structure is water supply and disaster prevention. Therefore, the material and work methods should be considered both eco-friendliness, durability and safety which are prerequisite elements to maintain the engineering function. In this study eco-friendly material and work methods would be classified into the vegetation based system, eco-friendly concrete system and stone-material system according to the characteristics of material. The quality standard for durability followed KS specification and related regulations. The quality standard for safety and eco-friendliness was set after literature review, and the database was developed using the standard. The structure applicable to onsite - the eco-friendly material and work method were classified based on the function and material of the hydraulic structure. Finally, database has been established for convenient management and selection of the proper material and work method. The eco-friendly material and work method could be searched easily for the convenience of the users, and the web-based data system has been developed for continuous registration of the material and work methods to be developed in the future.

The Estimation of Soil Erosion Fact of Cutting Slope Using Digital Image (디지털 영상을 이용한 절취단면의 토사유출인자 산정)

  • Lee Jong-Chool;Yang Won-Young;Heo Jong-Ho;Cho Yong-Jae
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2006.04a
    • /
    • pp.527-531
    • /
    • 2006
  • Recently, the development project is conducting disaster effect estimation to breed disaster, and cope these disaster beforehand provoking soil erosion and flood. Therefore, it is became important to analysis and reduce of these disaster. In this study, receive value of LS and C factor of soil erosion through the digital image. The method of photogrammetry was employed for the efficient surveying and analysis of cutting slope using Remote Control Helicopter installed with a nonmetric digital camera. As a result, we obtain more objectivity value of soil erosion factor using digital image analysis.

  • PDF

Rainfall Intensity Estimation with Cloud Type using Satellite Data

  • Jee, Joon-Bum;Lee, Kyu-Tae
    • Proceedings of the KSRS Conference
    • /
    • v.2
    • /
    • pp.660-663
    • /
    • 2006
  • Rainfall estimation is important to weather forecast, flood control, hydrological plan. The empirical and statistical methods by measured data(surface rain gauge, rainfall radar, Satellite) is commonly used for rainfall estimation. In this study, the rainfall intensity for East Asia region was estimated using the empirical relationship between SSM/I data of DMSP satellite and brightness temperature of GEOS-9(10.7${\mu}m$) with cloud types(ISCCP and MSG classification). And the empirical formula for rainfall estimation was produced by PMM (Probability Matching Method).

  • PDF

Study on optimum conditions establishment by Mold fabrication of Vacuum Casting (진공주형몰드 제작에 대한 최적조건 설정에 관한 연구)

  • Jeon, Eon-Chan;Han, Min-Sik;Kim, Soo-Yong;Kim, Tae-Ho
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.6 no.4
    • /
    • pp.65-70
    • /
    • 2007
  • In this study, we analyzed about that after design form manufacture master pattern in Rapid Prototyping-RP through design program, processes to manufacture prototype using Vacuum Casting. In Rapid Prototyping-RP, there is an en-or by shrinkage of resin and, in Vacuum Casting, there is an error by shrinkage of silicon. To select condition which shrinkage become the minimum of each process, manufactured prototype after using Full Factorial Design of Design of Experiments, We could confirm shrinkage using reverse engineering and that result came into effect ANOVA 2-way. We applied errors of each process to master pattern, and then presented the method to improve flood control precision of prototype of Vacuum Casting.

  • PDF

A Study on the Change of Water Quality in the Vicinity of Mokpo Harbor Due to the Discharges from Yongsan River Estuary Weir and Yongam-Kumho Sea Dike (영산강 하구둑과 영암-금호방조제 방류에 의한 목포항 주변 수역의 수질변화에 관한 연구)

  • 정대득;이중우;국승기
    • Journal of Korean Port Research
    • /
    • v.13 no.2
    • /
    • pp.419-426
    • /
    • 1999
  • It is essential for port planning, coastal zone management and environmental impact study to analyze the variation of current and water quality due to the development of water area and discharged water from estuary barrage and basin etc. Mokpo sea area downstreams from a long river and two large basins, the Yongsan river and Yongam-Kumho basins discharging much of water through water gates for the purpose of flood control and prohibition of salt intrusion to the inland fresh water area. In this study, the numerical calculations were carried out for the analysis of diffusion characteristics due to discharging operation, adapting the results of tidal current simulation ADI methord is applied to the governing equation for the movement of sea water and diffusion and 6-point method to the advection terms of diffusion equation. As the results of this study, it is known that the discharging operation causes increasing and/or decreasing of current velocity and enlarging and/or depressing of pollutant diffusion limits depending on the distance from the discharging gates and the mode of discharging operation. To utilize these result, the linked gate operation and the method increasing exchange of sea water must be considered.

  • PDF

A Study on the Application and Design Procedure of Multi-Purpose Wet Detention Ponds for Improving Water Quality - Case Study of NamAk New Town Development Area - (다목적 저류지의 수질개선을 위한 설계과정 및 적용에 관한 연구 - 남악 신도시 개발지를 대상으로 -)

  • Woo, Chang-Ho
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.7 no.1
    • /
    • pp.97-109
    • /
    • 2004
  • The disposal of stormwater is one of the major problems in urban water management. One method of reducing peak runoff rates and other detrimental impacts of stormwater is detention storage. Detention ponds as a water quality control alternatives have been investigated by a number of researchers. Recognizing multiple roles such as flood peak attenuation, pollution removal and aesthetic enhancement, the design and management of detentions ponds deserve more research. The purpose of this research is to establish design criteria wet detention ponds to improve water quality. Water quality in detention pond discharge might be improve with physical, chemical and biological alterations. Physical alteration was focused in this study. There are several methods for estimating the suspended solid control capability of wet detention ponds. Existing models of suspended solids removal are based on sedimentation and gravity settling theory. The pollutant trap efficiency of pond is a function of several interrelating factors. Detention time is the most important factor, because it determine gravity settling quantities of pollutants. Desirable modification of physical factors for improvement of water quality in wet detention ponds are volume ratio, area ratio, length to width ratio, depth, out let location, bottom soil type. In order to apply design procedure in actual site, Namak new town development area was selected.