• Title/Summary/Keyword: fire control

Search Result 1,358, Processing Time 0.034 seconds

Blasting wave pattern recognition based on Hilbert-Huang transform

  • Li, Xuelong;Wang, Enyuan;Li, Zhonghui;Bie, Xiaofei;Chen, Liang;Feng, Junjun;Li, Nan
    • Geomechanics and Engineering
    • /
    • v.11 no.5
    • /
    • pp.607-624
    • /
    • 2016
  • Rockburst is becoming more serious in Chinese coal mine. One of the effective methods to control rockburst is blasting. In the paper, we monitored and analyzed the blasting waves at different blast center distances by the Hilbert-Huang transform (HHT) in a coal mine. Results show that with the increase of blast center distance, the main frequency and amplitude of blasting waves show the decreasing trend. The attenuation of blasting waves is slower in the near blast field (10-75 m), compared with the far blast field (75-230 m). Besides, the frequency superposition phenomenon aggravates in the far field. A majority of the blasting waves energy at different blast center distances is concentrated around the IMF components 1-3. The instantaneous energy peak shows attenuation trend with the blast center distance increase, there are two obvious energy peaks in the near blast field (10-75 m), the energy spectrum appears "fat", and the total energy is greater. By contrast, there is only an energy peak in the far blast field, the energy spectrum is "thin", and the total energy is lesser. The HHT three dimensional spectrum shows that the wave energy accumulates in the time and frequency with the increasing of blast center distance.

A Case study on the plan for the ESC integrating optimized train operation system for Fire & power failure accident in subway (도시철도 화재$\cdot$단전시 최적 열차운행을 위한 통합운영체계 구축방안에 관한 연구)

  • Kim Young-Wook;Choi Se-Wan;Kim Young-Kyu
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.1185-1192
    • /
    • 2004
  • Recently heavy traffic is getting worse because increasing population of transportation in urban area. In order to solve this problem. subway is realized with high speed, high density, highly efficiency. When fire accident happened in Dae-Gu subway in February 2003, there happened loss of people and lots of damage because of not being able to control even though fire alarm which was set up in the station rang. This thesis has constructed a simulation integrating operation system using a Database construction, operating program analysis in order to build up the most efficient train operation system. The result of simulation integrating operation system with emergency virtual situation like station and train fire, train failure, power line failure, all trains running on the rail were secured safety by train operation control system. With integrating operation of each train control system, train system, power system, machine facility system, the most efficient integrating operation system should have been constructed at the time the subway fire and power failure broke out.

  • PDF