• Title/Summary/Keyword: feasibility analysis

Search Result 3,640, Processing Time 0.04 seconds

Revision of Feasibility Evaluation Guideline for Agricultural Infrastructure Improvement Project Using AHP Approach (AHP를 이용한 농업생산기반정비사업 타당성평가 개선방안)

  • Yun, Sung-wuk;Lee, Seok-joo;Lee, Han-sung;Chung, Won-ho
    • Journal of Korean Society of Rural Planning
    • /
    • v.25 no.2
    • /
    • pp.35-45
    • /
    • 2019
  • This study revises current feasibility evaluation guideline for agricultural infrastructure improvement project considering recent changes in social and economic environment in rural area. We use an AHP(Analytic Hierarchy Process) approach to consider qualitative evaluation items in policy enforcement and balanced regional development as well as quantitative items in current economic analysis in the process of feasibility evaluation and decision making. The criteria system is composed of three level hierarchy. In the first level which consists of economic analysis, policy analysis, and regional development analysis, economic analysis was ranked top with relative weight of 0.45 and regional development analysis the lowest with 0.22. In the second level which consists of three evaluation items under policy analysis, consistency in policy enforcement, risk factors, and special evaluation factors, consistency in policy enforcement was ranked top. Finally, 13 detailed evaluation items in the third level were surveyed and ranked by using a comprehensive criticality vector. The result shows that the three most important evaluation items are 'degree of underdevelopment', 'spill-over effect of regional economy' and 'consistency with related planning and policy direction'.

Economic Feasibility Analysis on Construction Facility Improvement Project of North Korea Considering Technology Application Period (국내 기술의 적용시기를 고려한 북한 건축시설 개선사업의 경제적 타당성 분석)

  • Kim, Min Ju;Kim, Chang-Won;Lee, Dongyoun;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.68-69
    • /
    • 2016
  • North Korean market created by reunification of the Korean Peninsula is expected to serve as a new growth engine to the already-developed construction industry of South Korea. Improvement on deteriorated construction facility of North Korea is a project in urgent need at the initial stage of reunification. Prior to market entry of the Korean peninsula under these circumstances, economic feasibility analysis on construction technology application must be preceded by considering reunification period. Therefore, this study conducts an economic feasibility analysis on construction facility improvement project of North Korea considering application period of technology developed by South Korea. Results of this study are expected to be utilized in future reunification process as the basis for establishing relevant guidelines for construction facility improvement project of North Korea.

  • PDF

How to Improve R&D Pre-Feasibility Study System (연구개발 분야 예비타당성 제도의 개선방향)

  • Choi, Seok-Joon;Kahn, Hyung-Sik
    • Journal of Korea Technology Innovation Society
    • /
    • v.11 no.2
    • /
    • pp.287-313
    • /
    • 2008
  • Even though the pre-feasibility study was introduced in 1998, it mainly has focused on transportation social overhead capital(SOC) such as road and railroad. Last year, however, the government newly launched R&D project area for the pre-feasibility study. This paper tries to analyze the pre-feasibility study methodology and system that applied to R&D facility, cluster, and sized R&D infrastructure projects. In depth study of economic, policy, and AHP analysis, this paper shows that the preliminary feasibility study have some caveats and suggests a way of improvement for making up for limitation. Main suggestions are as follows; First, to improve the fit in R&D sector analysis, using consistent method is important. Second, technology analysis is essential for R&D evaluation. Third, technology experts should take part in AHP analysis.

  • PDF

A Study on Business Feasibility for Marine Leisure Ships (해양레저선박에 대한 사업 타당성 분석 연구)

  • Jung-Suk Choi
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2022.11a
    • /
    • pp.300-301
    • /
    • 2022
  • In order to improve the accessibility to the island through marine leisure ships, it is necessary to evaluate objective business feasibility of the ship's operation. In this study, costs and income were estimated based on the operating expenses and freight standards of similar marine leisure ships in operation, and based on this, the feasibility of the project was empirically analyzed through B/C analysis, NPV, and IRR. In addition, sensitivity analysis was performed for various variables to understand the requirements for securing minimum economic feasibility. As a result of the study, in case of new building ship, the B/C ratio was estimated to be 1.042, NPV was estimated to be KRW 1.93 billion, and IRR was estimated to be 2.1% which means that profitability was secured.

  • PDF

An Economic Feasibility Study of Manganese Nodule in Korea Area: Clarion-Clipperton Fracture Zone (심해저 망간단괴 개발사업의 경제적 타당성 재평가)

  • Nam, Kwang-Hyun;Oh, Wee-Yeong;Kwon, Suk-Jue
    • Ocean and Polar Research
    • /
    • v.26 no.2
    • /
    • pp.187-197
    • /
    • 2004
  • The purpose of this paper is to investigate economic feasibility of manganese nodules in Korea area (Clarion-Clipperton Fracture Zone). We assumed that the production scale of manganese nodules were 3.0MT or 1.5MT and analyzed that the capital cost and operating cost were estimated in the four sectors, exploration, mining, transportation and metallurgical process. The capital cost and operating cost evaluation reflects the latest technical practices. First, for analyzing economic feasibility, the scenario suggests that the production of 4 metals can be made for 25 years. Assuming the discount rate at 8.0%, equity capital at 50% and tax at 27%. When manganese nodule were mininged 3.0 MT, economic feasibility analyses showed that IRR was 12.8 and pay-back period was 9.2 years, and when manganese nodules were mininged 1.5 MT, economic feasibility analyses showed that IRR was 4.0 and pay-back period was 11.8 years. This study indicated there is economic validity of at the product of manganese nodules 3.0 MT. In addition, we carried out a sensitivity analysis at the change of cobalt price on mining 1.5 MT. The result of sensitivity analysis clearly showed that economic validity is high at increasing of cobalt price 50% up.

Analysis Methodology for Feasibility Study of Remodeling of Aged Apartment by Comparative Analysis of Price Influencing Factors (가격 영향요인 비교분석을 통한 노후 공동주택 맞춤형 리모델링의 사업성 분석 방법론 제안)

  • Bae, Byungyun;Kim, Kyungrai;Shin, Dongwoo;Cha, Heesung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.47-56
    • /
    • 2017
  • As of 2017, there are 848 million households living in apartment and 55.87% of Aged apartments over 15 years old. The allowable standard for remodeling the apartment is more than 15 years and the market for remodeling the apartment will continue to increase. For the success of the remodeling project feasibility analysis is important but the existing feasibility analysis of new construction and reconstruction is being used for remodeling feasibility analysis. Therefore, it is necessary to study the feasibility analysis of customized remodeling without increasing the number of households according to the building law. Purpose of this paper is to develop a feasibility analysis methodology for customized remodeling projects by deriving the factors affecting the formation of land prices and building prices in apartment. According to the concept of price formation of the apartment, the analysis method of the customized remodeling of the old apartment using the factors affecting the Land Price Indexes, Officially Assessed Individual Land Price, House Price Indexes, and Officially Assessed Individual House Price was suggested. The Stair Price Algorithm developed in this research can be utilized at the stage of selecting remodeling contractors after the remodeling housing association is established.

An Economic Feasibility Comparison of the extruded pellets and moist pellet on the Oliver flounder Culture Farms (넙치 배합사료 및 생사료의 경제성 비교분석)

  • Hwang, Jin-Wook;Kim, Do-Hoon
    • The Journal of Fisheries Business Administration
    • /
    • v.40 no.3
    • /
    • pp.189-205
    • /
    • 2009
  • This study is aimed to analyze the economic feasibility comparison of the extruded pellets and moist pellets on the Oliver flounder culture farms in Jeju Island. In order to do this, we selected 2 farms (M and S farms) in Jeju Island as a sample. In the study, various analyses including productivity analysis, cost structure analysis, profitability and economic feasibility analysis by feed type were conducted for two sample farms of Oliver flounder culture. The results of economic analysis by feed type on the Oliver flounder culture can be summarized as follows; First, there were not significant differences in productivity by feed type. Second, results of the profitability analysis on farm M by feed type showed the profitability was estimated to be 15.52% and 9.83% in EP and MP, respectively. In addition, the profitability of farm S was estimated to be 28.37% and 33.72% in EP and MP, respectively. Third, results of the economic analysis on farm M by feed type indicated that an internal rate of return(IRR) was 8% and 7% and a benefit-cost ratio was shown to be 1.64 and 1.11 in EP and MP, respectively. Furthermore, the economic analysis of farm M by feed type showed that an IRR was 19% and 24% and a benefit-cost ratio was calculated to be 1.4 and 1.51 in EP and MP, respectively. In summary, it is especially emphasized that economic valuation is not related to feed types (EP and MP). Finally, in order to improve the economic feasibility, it should be more focused on the efficient business management of the Oliver flounder aquaculture.

  • PDF

A Basic Study on the Economic Feasibility Analysis of Busan Central Library Construction (부산대표도서관 건립의 경제적 타당성 분석에 관한 기초연구)

  • Kang, Hee-Kyung;Chang, Durk-Hyun;Lee, Soo-Sang
    • Journal of Korean Library and Information Science Society
    • /
    • v.45 no.3
    • /
    • pp.489-511
    • /
    • 2014
  • The purpose of this basic study is to examine the economic feasibility analysis of Busan Central Library, which was included the construction feasibility analysis conducted as one part of the Busan Central Library Construction Master Plan. To achieve the purpose of this study, it was accomplished to do Benefit-Cost analysis, Net Present Value, Internal Rate of Return. CVM(Contingent Valuation Method) was used for calculating the benefit; we investigated two CVMs for Busan Central Library, which are for central construction site and for outer construction site. The results show that the construction of Busan Central Library in the central site would be feasible from the economic point of view. On the contrary, the construction in the outer site would not be feasible economically.

Some Considerations of the Evaluation and Its Analysis on tile Profitability of the Investment Project. -On the Calculation and Analysis of IRR in Casting Facilities- (투자사업의 수익성 평가 및 분석에 관한 소고 -주물시설에 대한 IRR를 중심으로-)

  • 이상억
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.2 no.2
    • /
    • pp.53-62
    • /
    • 1979
  • A widely accepted indicator of a project's economic potential is the internal rate of return (IRR). The primary objective of feasibility analysis for any project is to measure the economic potential for the project, normally defined as the expected return on capital investment. The analysis should be designed to determine whether a project is technically and economically sound, and under what conditions. Therefore, there are factors other than economic potential that must be taken into account in the reasonable composition of an investment program. These kinds of factors can be given proper consideration in project selection after the economic feasibility of alternative projects has been determined. The primary reason for having to choose among different projects is that capital resources are scare : the investment budget is limited. The case project, casting facilities investment project, treated in this paper were selected for their value in illustrating the methods of feasibility analysis. This case project an actual potential project and is analyzed on the basis of the best available data for the specific conditions for that project.

  • PDF

The Study about Foreign Investment revitalization in Busan (부산지역 외국인투자 활성화 방안에 관한 연구)

  • Kim, Kyoung-Hee;Lee, Hak-Seung
    • International Commerce and Information Review
    • /
    • v.10 no.3
    • /
    • pp.163-195
    • /
    • 2008
  • This paper want to do the feasibility analysis that it uses financial statements in order to attract foreign investment to enter in the Busan area. And this paper would be presented the plan about foreign investment revitalization. To that end, this paper would be deployed the following methods and scope. First, It defines to the concept of foreign investment, foreign investment region, and foreign-invested enterprises, I wish to loot at the economic effects of positive and negative effects through foreign investment. Second, this study's scope would be set up foreign investment area of Busan, and investigate the land development cost of invested enterprises, construction cost of enterprises burden, expected revenues, etc. Third, it classified three industry for the feasibility analysis of entered enterprises, so would be yield industry-specific analysis using financial statements to be pre-research. Forth, this paper is suggested a revitalization plan for efforts to attract foreign investment, for the future through economic effective analysis of foreign invested-enterprises.

  • PDF